4th and Brannan station

4th and Brannan station[1] is an at-grade light rail station of the San Francisco Municipal Railway's Muni Metro system that is under construction. It will be an island platform located on the corner of 4th and Brannan streets in the South of Market, San Francisco (SoMa) district.[2] Its construction is part of the Central Subway Project and it will be a future station on the T Third Street line. The station is projected to open for public service in Spring 2022.[3]

FOURTH/BRANNAN
The station under construction in July 2020
Location4th Street at Brannan Street
San Francisco, California
Coordinates37.778272°N 122.396512°W / 37.778272; -122.396512
Platforms1 island platform
Tracks2
Construction
Disabled accessYes
History
Opening2022
Services
Preceding station Muni Following station
Yerba Buena/​Moscone
towards Chinatown
T Third Street 4th and King
towards Sunnydale
Location

Station design

Originally, the station and its adjacent trackway were designed with an exclusive train-only lane on the platform's eastern side and a mixed traffic lane on the western side. The station was subsequently redesigned with exclusive lanes on both sides of the platform, enabling trains to proceed faster through the 4th and Bryant intersection preceding the station.[4]

A stainless steel kinetic sculpture by Moto Ohtake, entitled Microcosmic, was installed at the station in November 2019. Designed to move when blown by the wind, it was the first of ten artworks to be installed in the Central Subway project.[5]

References

  1. "Central Subway Alignment". San Francisco Municipal Transportation Agency (SFMTA). Retrieved September 26, 2015.
  2. "Central Subway 4th & Brannan Surface Station" (PDF). City and County of San Francisco. Archived from the original (PDF) on June 11, 2016.
  3. "Central Subway: Slowed by COVID-19 But Still Making Progress" (Press release). San Francisco Municipal Transportation Agency. November 12, 2020.
  4. Addendum 2 to Supplemental Environmental Impact Statement/ Supplemental Environmental Impact Report (PDF) (Report). San Francisco Planning Department. September 28, 2018. Retrieved November 22, 2018.
  5. "First Of Ten Public Artworks Installed For Central Subway" (Press release). San Francisco Municipal Transportation Agency. November 25, 2019.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.