Berlin-Lichterfelde Süd–Teltow Stadt railway

The Berlin-Lichterfelde Süd–Teltow Stadt railway is a single-track railway in the German states of Berlin and Brandenburg. It is electrified by bottom contact third rail at 750 V DC and is used by the trains on line S25 of the Berlin S-Bahn. The line begins in Lichterfelde Süd station and branches on the outskirts of Berlin from the Anhalt Suburban Line. The line was opened to Teltow Stadt (Teltow town) in 2005. There were already plans for this line and an extension to Stahnsdorf in the period between the two world wars.

Berlin-Lichterfelde Süd–Teltow Stadt railway
Overview
Line number6039
LocaleBerlin, Brandenburg, Germany
TerminiLichterfelde Süd
Teltow Stadt
Service
Route number200.25
History
Opened24 February 2005 (2005-February-24)
Technical
Line length2.8 km (1.7 mi)
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification750 V third rail
Route map

0.0
Lichterfelde Süd
Berlin / Brandenburg state border
Seehof
planned
2.8
Teltow Stadt
Machnow Süd
(former planned extension)
Stahnsdorf Süd
(former planned extension)
Stahnsdorf
(former planned extension)
Cemetery Railway to Wannsee (dismantled)
Source: German railway atlas[1]

History

The first plans for a connection from the Anhalt Suburban Line at Lichterfelde to the town of Teltow and the Cemetery Railway (Friedhofsbahn) in Stahnsdorf already existed in the 1920s. In the 1930s, the Nazis were planning an extensive reconstruction of the Berlin railway infrastructure, especially in the south of the city. This S-Bahn line was planned. Between central Teltow and Stahnsdorf, a freight line would also run parallel to it to provide a more direct connection from the Großbeeren marshalling yard via Stahnsdorf to Potsdam.[2] Neither project was realised, but earthworks were constructed in several places. Provision was made for the planned line during the reconstruction of Lichterfelde Süd station up to 1943, including the building of two platforms.[3]

After the end of World War II and the subsequent division of Germany, these plans were not pursued, but the route (at least in part) was retained.[4]

After the re-opening of the S-Bahn to Lichterfelde Süd in 1998, there was growing interest in extending the line to Teltow. The ground-breaking ceremony for the extension of the line was carried out on 22 October 2003[5] and the line went into operation on 24 February 2005. In contrast to the original plans, the line was built as a single track and the construction of a station at Teltow-Seehof has not been implemented for the time being.[6]

In February 2014, the new Zugbeeinflussungssystem S-Bahn Berlin train control system was put into operation on the line. This replaced the existing mechanical train stop system.[7]

References

  1. Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. p. 127. ISBN 978-3-89494-139-0.
  2. Bernd Kuhlmann (2006). Bahnknoten Berlin, Die Entwicklung des Berliner Eisenbahnnetzes seit 1838 (in German). Berlin: Verlag GVE. p. 74. ISBN 3-89218-099-7.
  3. Peter Bley (1990). 150 Jahre Berlin-Anhaltische Eisenbahn (in German). Düsseldorf: alba. p. 124. ISBN 3-87094-340-8.
  4. Bernd Kuhlmann (2006). Bahnknoten Berlin, Die Entwicklung des Berliner Eisenbahnnetzes seit 1838 (in German). Berlin: Verlag GVE. p. 210. ISBN 3-89218-099-7.
  5. "Teltow Stadt station" (in German). Stadtschnellbahn Berlin. Retrieved 24 March 2015.
  6. Bernd Kuhlmann (2006). Bahnknoten Berlin, Die Entwicklung des Berliner Eisenbahnnetzes seit 1838 (in German). Berlin: Verlag GVE. p. 211. ISBN 3-89218-099-7.
  7. "Neues Zugbeeinflussungssystem für S-Bahn-Linie S25" (Press release) (in German). DB Mobility Logistics AG. 13 February 2014.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.