Camballin Irrigation Scheme
The Camballin Irrigation Scheme consisted of the Fitzroy River Barrage, the Seventeen Mile Dam, Company Pump, numerous irrigation channels, a seventeen kilometre levee bank, silos for grain storage which were built at the Broome Jetty and other support infrastructure located at the Camballin townsite.
The scheme was implemented to provide a large scale rice growing venture. Fodder crops, Sorghum, oats and cotton were also trialled.
The scheme was plagued by problems associated with flooding which damaged infrastructure and crops and was abandoned in 1983.
External links
- Parliamentary discussions
- Camballin Irrigation Area - A summary of Cropping and Pasture Studies 1958-1970
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.