Chestnut Hill station (MBTA)
Chestnut Hill is a stop on the MBTA Green Line D branch, located off Hammond Street north of Massachusetts Route 9 in the Chestnut Hill neighborhood of Newton, Massachusetts. The station has two side platforms serving the line's two tracks. Chestnut Hill station is not accessible.
Chestnut Hill | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
An inbound train at Chestnut Hill station in 2015 | |||||||||||||
Location | Hammond Street and Chestnut Hill Road Chestnut Hill, Massachusetts | ||||||||||||
Coordinates | 42°19′37″N 71°9′53″W | ||||||||||||
Owned by | Massachusetts Bay Transportation Authority | ||||||||||||
Line(s) | Highland Branch | ||||||||||||
Platforms | 2 side platforms | ||||||||||||
Tracks | 2 | ||||||||||||
Construction | |||||||||||||
Parking | Yes | ||||||||||||
Bicycle facilities | Yes | ||||||||||||
Disabled access | No | ||||||||||||
History | |||||||||||||
Opened | July 4, 1959[1] | ||||||||||||
Passengers | |||||||||||||
2013 | 1,416 (weekday average boardings)[2] | ||||||||||||
Services | |||||||||||||
| |||||||||||||
|
History
The original Chestnut Hill station opened in 1852 on the Highland Branch, which at the time was a conventional commuter rail line. After 1886, loop service was run via what is now the Framingham/Worcester Line and later the Needham Line. The final trains on the line ran on May 31, 1958. The line was converted to light rail by the M.T.A. and Chestnut Hill reopened on July 4, 1959, along with the rest of the "D" branch.[1] The original stone station was torn down and replaced by a small wooden shelter on the inbound platform.
In 2019, the MBTA indicated that the four remaining non-accessible stops on the D branch were "Tier I" accessibility priorities.[3] As of November 2020, conceptual design for accessibility modifications at the station is complete; design is expected to reach 100% in 2021, followed by construction.[4]
References
- Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). NETransit.
- "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
- "Preview of 2019 Recommendations: Presentation to the FMCB" (PDF). Plan for Accessible Transit Infrastructure (PATI). Massachusetts Bay Transportation Authority. April 1, 2019. p. 12.
- Brelsford, Laura (November 30, 2020). "System-Wide Accessibility Initiatives—November 2020" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. p. 5.
External links
Media related to Chestnut Hill station (MBTA) at Wikimedia Commons
- MBTA - Chestnut Hill
- Google Maps Street View: Hammond Street stairs, Middlesex Road entrance