Dongfang Power Station

The Dongfang Power Station (Chinese: 东方电厂),[3] also spelled Dongfang Power Plant,[4] is a generating plant project in Hainan, [5] located in Xiaozhou Industrial Development Zone, Dongfang City.[6] It is the first supercritical coal-fired power plant in the history of Hainan Province.[7]

Dongfang Power Station
东方电厂
CountryChina
LocationDongfang City, Hainan Province[2]
PurposePower
Construction began28 September 2007
Construction cost¥5.85 billion

History

The construction of Dongfang Power Station started on 28 September 2007, and the first phase of the project was put into operation on 28 December 2009, with a total investment of 3.25 billion yuan.[8]

At the end of 2010, the second phase of Dongfang Power Station was officially started, [9] approved by the National Development and Reform Commission,[10] with a total investment of 2.6 billion yuan.[11]

On May 6, 2012, the No. 3 unit of Dongfang Power Plant Phase II 2×350 MW coal-fired unit project completed 168 hours of trial operation and was directly transferred to operation.[12]

References

  1. "Response of water temperature in intake channel of Dongfang Power Plant to meteorological conditions". ResearchGate. 23 December 2016.
  2. "Response of water temperature in intake channel of Dongfang Power Plant to meteorological conditions". ResearchGate. 23 December 2016.
  3. Chen Qiye; Yuan Randong; Xiong Weici (14 January 2014). Greater China Economic Circle. World Scientific. pp. 272–. ISBN 978-981-322-991-4.
  4. Khee Giap Tan; Randong Yuan; Mu Yang (31 December 2013). Annual Analysis Of Competitiveness, Simulation Studies And Development Perspective For 34 Greater China Economies: 2000-2010. World Scientific. pp. 323–. ISBN 978-981-4579-45-2.
  5. Liquan Xie (12 January 2017). Applied Mechanics and Civil Engineering VI. CRC Press. pp. 1–. ISBN 978-1-351-85799-4.
  6. "The first phase of Huaneng Dongfang Power Plant was completed". China Daily. 2009-12-30.
  7. "Huaneng Dongfang Power Plant was put into operation". China News Service. 2009-12-28.
  8. "Hainan Huaneng Dongfang Power Plant new project approved with total investment of 3.25 billion RMB". Hainan Daily. 2008-09-22.
  9. "Huaneng Dongfang Power Plant Phase II Project Progresses Smoothly". Sohu.com. 2012-03-30.
  10. "Huaneng Dongfang Power Plant Phase II Expansion Project was approved". Hainan Daily. 2010-12-17.
  11. "Hainan Province Electric Power Construction Achieves Historic Leap". Hainan Daily. Feb 21, 2012.
  12. "Dongfang Power Plant Phase II No.3 unit passed 168 test run". State-owned Assets Supervision and Administration Commission. 2012-05-09.