Hangzhou–Shaoxing–Taizhou high-speed railway
The Hangzhou–Shaoxing–Taizhou high-speed railway is a high-speed railway in China. It is currently under construction and expected to open in 2021.[1]
| Hangzhou–Shaoxing–Taizhou high-speed railway 杭绍台城际铁路 | |
|---|---|
| Overview | |
| Status | Under construction |
| Locale | Hangzhou Shaoxing Taizhou |
| Termini | Hangzhou East Yuhuan |
| Stations | 12 |
| Service | |
| Operator(s) | China Railway High-speed |
| Technical | |
| Line length | 267 km (166 mi) |
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
| Operating speed | 350 km/h (217 mph) |
Route
The railway does not parallel any existing railway.
Features
Xiaobeishan tunnel, a 596 metres (1,955 ft) long single-bore quadruple-track tunnel. The Hangzhou–Shaoxing–Taizhou high-speed railway uses the inner two tracks.[2]
Stations
It will have the following stations:[3]
| Station Name | Chinese | Metro transfers/connections | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Hangzhou East | ||||||||||
| Hangzhou South | ||||||||||
| Shaoxing North | 1 | |||||||||
| Dongguan | ||||||||||
| Sanjie | ||||||||||
| Shengzhou Xinchang | ||||||||||
| Tiantai | ||||||||||
| Linhai | ||||||||||
| Taizhou Central | ||||||||||
| Wenling | ||||||||||
| Wenling West | ||||||||||
| Yuhuan | ||||||||||
References
- 滕雪. "杭绍台铁路全线桥梁架设工程启动 预计2021年建成通车". news.cctv.com. Retrieved 2020-11-09.
- "我国首条单洞四线超大断面高铁隧道贯通". www.crecg.com. Retrieved 2020-11-09.
- "杭绍台铁路最新消息!预计2021年底开通,站点及线路图一览 - 土流网招拍挂手机版". m.tudinet.com. Retrieved 2020-11-09.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.