Hatboro station
Hatboro station is a rail station on SEPTA Regional Rail's Warminster Line, formerly the Reading Railroad's New Hope Branch, in Hatboro, Pennsylvania and once terminus for electrified MUs. Electrification was extended to Warminster in 1974. It is located at the intersection of Byberry Road and Penn Street. The station features a passing siding for handling multiple trains as well as a 100-space parking lot. The current brick construction station stands at 20' x 55' and was built in 1935. An original wood construction freight station was completed in 1871 but no longer stands at the site.
Hatboro station | |||||||||||||
Location | 21 South Penn Street Hatboro, Pennsylvania | ||||||||||||
Coordinates | 40.1756°N 75.1030°W | ||||||||||||
Owned by | SEPTA | ||||||||||||
Platforms | 1 side platform | ||||||||||||
Tracks | 1 | ||||||||||||
Construction | |||||||||||||
Parking | 175 spaces | ||||||||||||
Disabled access | No | ||||||||||||
Other information | |||||||||||||
Fare zone | 3 | ||||||||||||
History | |||||||||||||
Opened | 1871 | ||||||||||||
Rebuilt | December 1934–June 1, 1935[1][2] | ||||||||||||
Electrified | July 26, 1931[3] | ||||||||||||
Services | |||||||||||||
| |||||||||||||
|
Description
Hatboro station consists of a side platform along the tracks. The station has a ticket office and waiting room that is open on weekday mornings. Hatboro station has a parking lot with 100 spaces, with a remote parking area across Byberry Road that contains 75 spaces. Both parking lots charge $1 a day.[4] Parking is also provided at the Hatboro Municipal Parking Lot across Moreland Avenue, which has 93 spaces and charges $1 a day.[4][5]
Train service at Hatboro station is provided along the Warminster Line of SEPTA Regional Rail, which runs south to Center City Philadelphia and north one stop to its terminus at Warminster. Hatboro station is located in fare zone 3. Service is provided daily from early morning to late evening. Most Warminster Line trains continue through the Center City Commuter Connection tunnel and become Airport Line trains, providing service to the Philadelphia International Airport.[6] In FY 2013, Hatboro station had a weekday average of 457 boardings and 430 alightings.[7]
Station layout
G | |
Storage track | ← No passenger service → |
All trains | ← Warminster Line toward Warminster (Terminus) Warminster Line toward Penn Medicine (Willow Grove) → |
Side platform, doors will open on the left or right | |
Street level | Exit/entrance, parking, and ticket office |
References
- "Station for Hatboro". The Philadelphia Inquirer. December 23, 1934. p. 60. Retrieved July 2, 2019 – via Newspapers.com.
- "Local Flashes". The Morning Call. Allentown, Pennsylvania. June 3, 1935. p. 5. Retrieved July 2, 2019 – via Newspapers.com.
- "Reading Installs Electric Service". The Philadelphia Inquirer. July 26, 1931. p. 8. Retrieved August 22, 2020 – via Newspapers.com.
- "Hatboro Station". SEPTA. Retrieved December 30, 2016.
- "Non-SEPTA parking for Hatboro Station". SEPTA. Retrieved December 30, 2016.
- "Warminster Line schedule" (PDF). SEPTA. Retrieved December 30, 2016.
- "SEPTA (May 2014). Fiscal Year 2015 Annual Service Plan. p. 61" (PDF). Archived from the original (PDF) on 2014-08-12. (539 KB)
External links
Media related to Hatboro (SEPTA station) at Wikimedia Commons