Italian offshore patrol vessel Marcantonio Colonna
Marcantonio Colonna (P433) is the fourth ship of Paolo Thaon di Revel-class offshore patrol vessel.
| History | |
|---|---|
| Name: | Marcantonio Colonna |
| Namesake: | Marcantonio Colonna |
| Ordered: | 2014 |
| Builder: | Fincantieri, Muggiano |
| Cost: | €3.9 billion |
| Laid down: | 14 March 2019 |
| Launched: | Expected, September 2021 |
| Commissioned: | Expected, April 2024 |
| Identification: | Pennant number: P433 |
| Status: | Under construction |
| General characteristics | |
| Class and type: | Thaon di Revel-class offshore patrol vessel |
| Displacement: | |
| Length: | |
| Beam: | 16.5 m (54 ft 2 in) |
| Draught: | 10.5 m (34 ft 5 in) |
| Depth: | 5 m (16 ft 5 in) |
| Propulsion: |
|
| Speed: |
|
| Range: | 5,000 nmi (9,300 km; 5,800 mi) at 15 knots (28 km/h; 17 mph) |
| Complement: | 173 beds (+ 30 on modular rear zone) |
| Crew: |
PPA Full 120 crew;PPA Light+ + 90;PPA Light 90;( add 24 crew for two helos on board and other 89/59 beds for optional boarding team, marines team, maritime command staffs, etc.) |
| Sensors and processing systems: |
|
| Electronic warfare & decoys: |
|
| Armament: |
|
| Aircraft carried: | |
| Aviation facilities: |
|
Development and design
Italian Navy ordered the new MBDA TESEO MK/2E heavy-duty missile (TESEO "EVO"), a long-range anti-ship missilewith also strategic land attack capability. The missile will have a new terminal "head" with dual RF seeker (Radio Frequency) and, presumably, date the need to even attack ground targets, IIR (Imaging IR). Compared to the predecessor OTOMAT/TESEO, the TESEO "EVO" MK/2E has a double range or more than 360 km. Former OTOMAT is accredited for a range of action of more than 180 km.[1][2][3]
Construction and career
Marcantonio Colonna was laid down on 14 March 2019 at Fincantieri Muggiano and expected to be launched in September 2021.[4] Expected to be commissioned in April 2024.
References
- http://www.portaledifesa.it/index~phppag,3_id,2349.html
- https://www.airpressonline.it/33516/33516/
- https://www.trasporti-italia.com/focus/mbda-al-via-lo-sviluppo-del-nuovo-teseo/33323
- "Italy starts construction of first fully-configured PPA ship". Naval Today. 20 March 2019. Retrieved 3 November 2020.