La Línea (Road Pass)

La Línea (English: The Line) is a highway tunnel between the cities of Calarcá, Quindío and Cajamarca, Tolima in Colombia. It crosses beneath the locally famous "Alto de La Línea" in the Cordillera Central or central range of the Andes mountains, easing traffic on one of Colombia's main east-west road connections (the National Route 40) which links Bogotá with Cali and the Pacific port of Buenaventura. It is the longest road tunnel in Latin America,[1] and in the Americas,[2] well ahead of the 13,300 ft (4,100 m) Anton Anderson Memorial Tunnel which is the longest road tunnel in North America. The total length of the tunnel is 8,652 metres (28,386 ft), its western entrance being at 2,420 metres (7,940 ft) above msl, 19 kilometres (12 mi) east of the city of Armenia and the eastern one at 2,505 metres (8,219 ft) above msl, at 37.8 kilometres (23.5 mi) west of Ibagué.[3] Constructions of the pilot tunnel started on 30 September 2004 and both sides of the pilot met on 2 August 2008.[4] In September 2007 Ministry of Transport launched the tender process for the construction of tunnel and connecting roads.[5] Construction work started in December 2008 in head of Union Temporal Segundo Centenario led by Carlos Collins and was originally expected to finish in 2016.[6] In May 2016, the opening was delayed to 2018.[7] The tunnel was finally opened on 4 September 2020, after 14 years of construction work, at a total cost of around 2.9 trillion pesos (US$870 million).[8][9]

La Línea in July 2020

Benefits

Trajectory of the planned tunnel.

Some of the benefits include lower operation costs (US$37 million in the first year), shorter travel time and reduction in the number of accidents. Due to the difficult terrain that will be avoided, US$37 million should be saved in operating costs in the first year. Furthermore, travel time will decrease as average speed increases from its current 18.2 kilometres per hour (11.3 mph) to 60 kilometres per hour (37 mph). For heavy vehicles, travel times can be decreased by 80 minutes, and 40 minutes for light vehicles. This section is also currently one of the stretches in the country most prone to accidents (four times the national average) due to its geography and climate. The tunnel could bring the accident rate down to the average. Total economic benefits are estimated to be US$40 million per annum.

References

  1. "Hallazgos en el túnel de La Línea" (in Spanish). Portal de Información Minera Colombiana. 28 October 2008. Archived from the original on 13 July 2011. Retrieved 1 December 2008.
  2. "Whittier Access Tunnel > Accomplishments". Alaska Department of Transportation and Public Facilities. 5 September 2020. Archived from the original on 5 September 2020. Retrieved 5 September 2020.
  3. "Túnel Piloto La Línea o Túnel del Segundo Centenario" (in Spanish). ConConcreto. Archived from the original on 11 September 2008. Retrieved 1 December 2008.
  4. "The World's longest Tunnel Page: Tunnels in Colombia". Retrieved 1 December 2008.
  5. "Tendering for Colombia tunnel project". World Highways.
  6. "A túnel de La Línea le falta año y medio, y al menos $160.000 millones". eltiempo.com (in Spanish). 18 September 2014.
  7. "Túnel de La Línea solo entraría en operación en el 2018". eltiempo.com (in Spanish). 12 May 2016.
  8. Tiempo, Casa Editorial El (September 4, 2020). "Túnel de La Línea y el 'top 10' de megaobras más grandes de Colombia". El Tiempo.
  9. "Colombia opens South America's longest road tunnel". September 5, 2020 via www.reuters.com.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.