List of nuclear power plants in Japan
The following is a list providing Japanese nuclear power plants.
After the Fukushima Daiichi nuclear disaster, all 17 plants were shut down. Over the past decade, Japan has been actively building up its lost energy potential. At the moment, only 4 out of 17 nuclear power plants operate in the country.
Designations
identifier |
---|
The nuclear power plant does not work/Restarting the nuclear power plant is impossible |
The nuclear power plant is operating, but its capacity is not fully restored. |
At the moment, a trial is underway |
The nuclear power plant has fully restored power. |
Situation unknown |
Nuclear power station | Photo | Location | Status | Units | References |
---|---|---|---|---|---|
Fukushima Daiichi Nuclear Power Plant | Ōkuma | The facility has been completely decommissioned | 6 | [1] | |
Fukushima Daini Nuclear Power Plant | Naraha | The facility has been completely decommissioned | 4 | [2] | |
Genkai Nuclear Power Plant | Genkai | Units 3 and 4 are working | 4 | [3] | |
Hamaoka Nuclear Power Plant | Omaezaki | The facility has been completely decommissioned | 5 | [4] | |
Higashidōri Nuclear Power Plant | Higashidōri | The facility has been completely decommissioned | 2 | [5] | |
Ikata Nuclear Power Plant | Ikata | The work was stopped by a court order | 3 | [6][7][8] | |
Kashiwazaki-Kariwa Nuclear Power Plant | Kashiwazaki | The facility has been completely decommissioned. Units 6 and 7 are ready for launch. But there is no specific solution for units 1-5 | 7(It is the largest nuclear generating station in the world by net electrical power rating) | [9] | |
Mihama Nuclear Power Plant | Mihama | By court decision, the launch of the 3 unit is allowed after protective measures have been taken | 3 | [10] | |
Ōi Nuclear Power Plant | Ōi | Units 3 and 4 are working | 4 | [11] | |
Onagawa Nuclear Power Plant | Onagawa | A request was sent for permission to launch 2 unit | 3 | [12] | |
Sendai Nuclear Power Plant | Satsumasendai | The nuclear power plant has reached the same capacity as before the Fukushima Daiichi nuclear disaster. All units are involved | 2 | [13] | |
Shika Nuclear Power Plant | Shika | The territory on which the nuclear power plant is built may be unsuitable for energy production | 2 | [14] | |
Shimane Nuclear Power Plant | Matsue | The facility has been completely decommissioned. After filing a claim, the court decided to consider the possibility of reducing the territory of the nuclear power plant by 1 unit | 3 | [15] | |
Takahama Nuclear Power Plant | Takahama | Units 3 and 4 are working | 4 | [16][17][18] | |
Tōkai Nuclear Power Plant | Tōkai | The facility has been completely decommissioned. The oldest nuclear power plant in Japan | 2 | [19] | |
Tomari Nuclear Power Plant | Tomari, Shiribeshi Subprefecture | The facility has been completely decommissioned | 3 | [20] | |
Tsuruga Nuclear Power Plant | Tsuruga | Restarting the nuclear power plant is impossible | 2 | [21][22][23][24] |
References
- "TEPCO : Press Room | Press Releases". www.tepco.co.jp. Retrieved 2020-12-10.
- "トップページ|福島第二原子力発電所|東京電力". www.tepco.co.jp. Retrieved 2020-12-10.
- "九州電力 玄海原子力発電所". 九州電力 (in Japanese). Retrieved 2020-12-10.
- "浜岡原子力発電所 - 原子力発電|中部電力". 中部電力 (in Japanese). Retrieved 2020-12-10.
- "原子力発電所に関する情報|東北電力". www.tohoku-epco.co.jp. Retrieved 2020-12-10.
- "原子力情報|四国電力". www.yonden.co.jp. Retrieved 2020-12-10.
- "The court ruled to stop the Ikata nuclear power plant". TASS. Retrieved 2020-12-10.
- "Second injunction keeps Ikata reactor offline : Regulation & Safety - World Nuclear News". www.world-nuclear-news.org. Retrieved 2020-12-12.
- "柏崎刈羽原子力発電所TOP|新潟本社・柏崎刈羽原子力発電所|東京電力ホールディングス株式会社". www.tepco.co.jp. Retrieved 2020-12-10.
- "美浜発電所|事業所・関連施設|会社案内|ABOUT US|関西電力". www.kepco.co.jp. Retrieved 2020-12-10.
- "大飯発電所|事業所・関連施設|会社案内|ABOUT US|関西電力". www.kepco.co.jp. Retrieved 2020-12-10.
- "Nuclear Power Information". www.tohoku-epco.co.jp. Retrieved 2020-12-10.
- "九州電力 川内原子力発電所". 九州電力 (in Japanese). Retrieved 2020-12-10.
- "北陸電力株式会社 原子力情報". www.rikuden.co.jp. Retrieved 2020-12-11.
- "発電所に関するご説明(広報)|中国電力". 中国電力 (in Japanese). Retrieved 2020-12-12.
- "高浜発電所|事業所・関連施設|会社案内|ABOUT US|関西電力". www.kepco.co.jp. Retrieved 2020-12-12.
- https://www.kepco.co.jp/english/corporate/pr/2017/__icsFiles/afieldfile/2017/05/22/2017_may22_2.pdf
- "Japan's Fifth Re-Activated Reactor -- Takahama 3 -- Is Restarted - News - Nuclear Power News - Nuclear Street - Nuclear Power Plant News, Jobs, and Careers". nuclearstreet.com. Retrieved 2020-12-12.
- "Safety upgrades impact operation of Japanese units: Regulation & Safety - World Nuclear News". www.world-nuclear-news.org. Retrieved 2020-12-12.
- "泊発電所(原子力) - 北海道電力". www.hepco.co.jp. Retrieved 2020-12-12.
- "Panel says fault under Tsuruga plant likely active: draft report- 毎日jp(毎日新聞)". web.archive.org. 2013-03-11. Retrieved 2020-12-13.
- "Restart of Tsuruga plant appears difficult due to possible active fault- 毎日jp(毎日新聞)". web.archive.org. 2012-12-14. Retrieved 2020-12-13.
- "Nuclear regulator sacked for leaking information to nuclear operator-…". archive.is. 2013-02-18. Retrieved 2020-12-13.
- "NRA not budging on judgment Tsuruga plant sits above active fault- 毎日…". archive.is. 2013-04-13. Retrieved 2020-12-13.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.