Outer Circle railway line

The Outer Circle was built in 1891 as a steam-era suburban railway line, in Melbourne, Australia. It covered much of the modern City of Boroondara, including the suburbs of (from north to south) Kew East, Camberwell, Burwood, Ashburton, and Malvern East. At its longest stage, it ran from Fairfield station, on what is today the Hurstbridge line, to Oakleigh station, on the current Pakenham and Cranbourne lines.

Outer Circle
Overview
StatusPart retained as the Alamein line; Chandler Highway; otherwise parkland
Connecting linesHurstbridge, Lilydale, Pakenham and Cranbourne lines
Service
TypeMelbourne suburban service
History
Opened30 May 1890 (1890-05-30)
Closed4 April 1893 (1893-04-04)[1]
Technical
Number of tracksSingle track

History

The Outer Circle railway was first advocated by a group known as the Upper Yarra Railway League in 1867 who suggested that the Gippsland Railway could be brought into Melbourne via the outer suburbs, but the term itself was first conceived in 1873 by Engineer-in-Chief of the Victorian Railways, Thomas Higinbotham who suggested an "outer circle route".[2][3][4][5]

Construction of the Gippsland line was authorised in 1873 but the line could not be brought into Melbourne by the direct route used today as the private Melbourne and Hobson's Bay United Railway Company controlled the lines from Flinders Street station to South Yarra, and no connection existed between Flinders Street and Spencer Street stations.[6] By 1879 this issue had been solved, with the direct railway opened and the M&HBUR purchased by the government in 1878.[7]

The next phase of agitation for the Outer Circle line was driven by politics and land speculators;[8] the line being included in both the 1882 and 1884 Railway Construction Acts. The act authorising the line was passed on 12 December 1884,[9] the act also authorising the viaduct connecting Flinders Street and Spencer Street stations. By 1885 two parliamentarians who helped approve the line, F.E. Beaver and James Munro, had purchased half the land adjoining the new railway.[10][11]

Construction commenced in 1888 and was finally completed by 1891. The Outer Circle connected Camberwell station (on the modern Belgrave and Lilydale lines) with Oakleigh station to the south, via Riversdale on what is now the Alamein line. The final section was north from Riversdale through to Fairfield station (then called Fairfield Park station).

There was also a branch line from the closed Waverley Road station (near the modern East Malvern station) to Darling and Burnley. This was the first section of what is now the Glen Waverley line and was opened a few weeks before the Outer Circle.

When opened the line was 10.3 miles (16.6 km) in length, and had 11 stations, all provided with twin platforms and crossing loops. Provision was made for double track, and heavier duty 75 pounds (34 kg) per yard rails were used.[12] Despite this, the line never carried Gippsland traffic, and the economic depression of the early 1890s saw home building in the area cease.[13]

Services

Diagram showing Melbourne's rail network, including former and planned lines
For operation post electrification in 1924 see Alamein line.

The first section of the Outer Circle opened was on 24 March 1890, from Oakleigh to Waverley Road, and on to Burnley. It was followed by the line from Waverley Road to Camberwell on 24 March 1890, and the Riversdale to Fairfield Park section on 24 March 1891.[14] From this time the line was operated as three different passenger services:[15]

  • Oakleigh to Burnley, change at Waverley Road for,
  • Waverly Road to Camberwell, change at Riversdale for,
  • Riversdale to Fairfield Park.

Lack of passengers led the service cuts, with the Riversdale to Fairfield Park section was closed from 12 April 1893, replaced by a horse bus service,[16] the Oakleigh to Ashburton and Darling section closed on 9 December 1895,[16] and the last section from Camberwell to Ashburton closed on 1 May 1897.[17] Camberwell to Ashburton was reopened 4 July 1898[14] operated by a steam locomotive and single carriage. The northern section was reopened on 14 May 1900 from Riversdale to Deepdene,[18] with a steam train known locally as the Deepdene Dasher running between Ashburton and Deepdene at about 90-minute intervals, connecting at East Camberwell on the lower platform. The Deepdene Dasher was the last passenger steam train in suburban Melbourne.[14]

Electrification work on the Melbourne network commenced in the 1920s, with the Railway Commissioners in 1923 deciding not to electrify the line from Deepdene though Riversdale to Ashburton due to insufficient traffic levels, but would keep the issue under review.[14] Their position was soon reversed, with the Camberwell to Ashburton included in the project, the last steam train running on 29 October 1924 and electric trains commenced 3 days later,[19] shuttle trains running every 40 minutes, connecting at Camberwell.[14] On 15 August 1926 the last steam hauled Deepdene Dasher ran, replaced by a pair of AEC railmotors coupled back to back.[19] The Commissioners intended to electrify the line if the volume of traffic increased, which did not occur, with the service replaced by road bus on 10 October 1927.[14] The electrified suburban service remains as today's Alamein line.

Goods services also operated on the line, initially to Ashburton and some to Deepdene, but was extended to East Kew on 11 February 1925. These services lasted until 6 September 1943.[19]

Today

Remains of Fulham Grange station in 2007

Today, the southern section of the line from Camberwell to Alamein is part of the Melbourne suburban railway network as the Alamein line. The northern section of the line, starting at East Camberwell, has been converted into the Outer Circle Trail, a walking and bicycle path.[20] All of the closed stations have since been demolished, as has the railway infrastructure of the line, but some road overbridges and underbridges remain. The rail bridge over the Yarra River was converted into a road bridge as part of the Chandler Highway sometime after 1919.[21] The track between Fairfield station and the Yarra River came into use from 1919 as the APM Siding,[21] serving a paper mill built on the site.

Media

In 2014, a documentary, Melbourne's Forgotten Railway - The Outer Circle,[22] was produced by a Melbourne-based media production team led by Ron Killeen and Andrew McColm. It documented the line and included "historians, an urban planning expert, as well as people who actually remember seeing and riding on the train".[23]

Line Guide

Outer Circle
7.9
Fairfield
Fulham Grange
Willsmere
East Kew
Deepdene
Roystead
Shenley
Loop to Canterbury station
9.8
East Camberwell
Loop to Camberwell station
10.4
Riversdale
10.9
Willison
12.0
Hartwell
12.9
Burwood
14.2
Ashburton
14.9
Alamein
Glen Waverley line (
extended
1929–30
)
Junction to Darling station
Waverley Road
15.4
Oakleigh
Station not part of
original Outer Circle line
Outer Circle Railway formation south of Alamein station in 1990. Note stanchions for overhead catenary
Outer Circle Railway formation south of Alamein station in 2011.

See also

References

  1. "Victorian Railways. An unremuerative line closed". Evening News (8062). New South Wales, Australia. 4 April 1893. p. 6. Retrieved 22 June 2017 via National Library of Australia.
  2. Beardsell & Herbert 1979, p. 1.
  3. "THE OUTER-CIRCLE RAILWAY". The Argus (Melbourne) (8, 530). Victoria, Australia. 14 October 1873. p. 6. Retrieved 22 June 2017 via National Library of Australia.
  4. "THE OUTER CIRCLE RAILWAY". Weekly Times (217). Victoria, Australia. 1 November 1873. p. 7. Retrieved 22 June 2017 via National Library of Australia.
  5. "THE PROPOSED NEW SUBURBAN LINES". The Argus (Melbourne) (11, 952). Victoria, Australia. 11 October 1884. p. 5. Retrieved 22 June 2017 via National Library of Australia.
  6. Beardsell & Herbert 1979, p. 6.
  7. Beardsell & Herbert 1979, p. 19.
  8. Beardsell & Herbert 1979, p. 4.
  9. Beardsell & Herbert 1979, p. 26.
  10. Beardsell & Herbert 1979, p. 27.
  11. "THE OUTER CIRCLE RAILWAY. CONTRACT FOR ITS CONSTRUCTION". The Age (10314). Victoria, Australia. 13 March 1888. p. 5. Retrieved 22 June 2017 via National Library of Australia.
  12. Beardsell & Herbert 1979, p. 55.
  13. Beardsell & Herbert 1979, p. 56.
  14. S.E. Dornan and R.G. Henderson (1979). Electric Railways of Victoria. Australian Electric Traction Society. p. 84. ISBN 0-909459-06-1.
  15. Beardsell & Herbert 1979, p. 50.
  16. Beardsell & Herbert 1979, p. 59.
  17. Beardsell & Herbert 1979, p. 60.
  18. Beardsell & Herbert 1979, p. 61.
  19. Beardsell & Herbert 1979, p. 63.
  20. "Outer Circle Rail Trail – Trail Description". railtrails.org.au. Retrieved 12 March 2008.
  21. S Cauchi (November 1994). "Closure of the Australian Paper Ltd siding at Fairfield". Newsrail. Vol. 22 no. 11. Australian Railway Historical Society (Victorian Division). pp. 328–331.
  22. Shack West (14 December 2014). Melbourne's Forgotten Railway - The Outer Circle (Motion Picture). Retrieved 21 October 2019 via Vimeo.
  23. Killeen, Ron (4 December 2014). "Melbourne's Forgotten Railway – documentary out now!" (PDF) (Press release). Melbourne, Victoria: Shack West. Retrieved 20 October 2019.

Sources

  • Beardsell, David; Herbert, Bruce (1979). The Outer Circle: A history of the Oakleigh to Fairfield Park Railway. Australian Railway Historical Society (Victorian Division). ISBN 0-85849-024-2.