Palaiofarsalos–Kalambaka railway

The Palaiofarsalos to Kalambaka railway is a standard-gauge railway line that connects Kalambaka with the mainline station of Palaiofarsalos in Thessaly, Greece.[1] Originally opened as a metre-gauge railway in 1886, it was converted to standard gauge in 2001.

Palaiofarsalos-Kalambaka railway
View the line through the driver's seat between Karditsa and Trikala in May 2016.
Overview
StatusOperational
OwnerOSE
LocaleGreece (Thessaly)
TerminiPalaiofarsalos 39.3142°N 22.2432°E / 39.3142; 22.2432
Kalambaka 39.7030°N 21.6254°E / 39.7030; 21.6254
Stations7
Service
Typerailway line
Operator(s)TrainOSE
History
Opened1886 (metre gauge)
2001 (standard gauge)
Technical
Line length80.44 km (49.98 mi)[1]
Number of tracksSingle track[1]
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
ElectrificationNo[1]
Operating speed100 km/h (62 mph) (highest)
Route map
Palaiofarsalos-Kalambaka railway
km
Line to Athens
0.0 Palaiofarsalos
Line to Thessaloniki
17.9 Sofades
35.3 Karditsa
00.0 Fanari
00.0 Magoula
63.5 Trikala
83.8 Kalambaka

Route

The southern terminus of the line is Palaiofarsalos railway station near Farsala. Here, the line separates from the Piraeus–Platy railway and follows a branch of 80.44 km (49.98 mi). It continues to Karditsa and Trikala, and advances north-northwest to the northern terminus in Kalambaka.

The duration of the regular stopping service between Athens and Kalambaka is 4 hours and 11 minutes, but faster travel times can be achieved by taking the InterCity service to Thessaloniki and changing trains at Palaiofarsalos.[2]

Stations

The stations on the Palaiofarsalos-Kalambaka railway serve are:

History

The metre-gauge railway from Palaiofarsalos to Kalambaka was inaugurated on 16 June 1886 as part of the Thessaly Railways, with services to and from Volos.

After the First World War, the Greek state had planned the ambitious construction of several new rail lines and links, including a standard gauge line from Kalambaka on to Kozani and then Veroia creating a conversion of the route from Volos to Kalambaka on standard gauge. In 1927, the relevant decisions were made, starting in 1928, work was carried out on the construction of the new line from Kalambaka. But a year later, it was clear that the project would exceed the estimated costs many times over. In 1932, the construction work was stopped and remains unfinished.[3]

Freight traffic declined sharply when the state-imposed monopoly of OSE for the transport of agricultural products and fertilisers ended in the early 1990s. Many smaller stations on the network (with little passenger traffic) were closed, especially on the mainline section between Karditsa and Kalampaka.

In early 2001, the decision was taken to upgrade the line from 600 mm gauge to standard gauge and physically connected at Palaiofarsalos with the mainline from Athens to Thessaloniki. In 2001 the section between Kalampaka and Palaiofarsalos was converted from 600 mm gauge to standard gauge and physically connected at Palaiofarsalos with the mainline from Athens to Thessaloniki.[4] Since to upgrade, however, travel times improved and the unification of rail gauge allowed direct services, even InterCity services, to link Volos and Kalambaka with Athens and Thessaloniki. During the conversion, several smaller stations where closed, however, travel times improved and the unification of rail gauge allowed direct services, even InterCity services, to link Kalambaka with Athens and Thessaloniki.

Services

The Palaiofarsalos-Kalambaka railway is used by the following passenger services:

  • Regional Palaiofarsalos-Kalambaka. The journey takes around 48 mins.[5]

Future

The Kozani–Amyntaio railway line and the future extension to Kalampaka and the Palaiofarsalos–Kalambaka railway as part of the western railway axis of Greece.

Upgrade

In early 2018 TrainOSE announced the upgrade of the line.[6] This upgrade will involve doubling the track and full electrification from Kalambaka (allowing faster nonstopping services to Athens and Thessaloniki) with installation of new signalling and ETCS Level 1 systems on the existing single-track railway line.[6] The tendering process was set for 11 October 2018, with funding being allocated Operational Programme THESSALY 2014-2020.[6] With a completion date of 2022. The time for Athens to Kalampakas will be reduced to 2 hours and 50 minutes, Athens to Karditsa 2 hours and Athens to Trikala 2 hours and 40 minutes.[7] The projected costs estimate are set at €46,6500.[6]

Extensions

East: Kalambaka - Grevena - Siatista - Kozani - Panagia Soumela Vermiou - Veria According to press reports, there is OSE's planning for line extensions, from Kalambaka to Grevena, Siatista and Kozani at first stage

West: Kalampaka-Ioannina-Igoumenitsa (project duration from the completion of the study: 5 years). In the projected second stage expansion from Kalambaka to Ioannina and Igoumenitsa in the framework of the Railway Egnatia.[8] The expansion stations will be: Kalambaka-Malakasi-Anthochori-Ioannina-Kastritsa-Agios Nikolaos-Kristallopigi-Igoumenitsa.[9]