Pioneering Spirit (ship)

Pioneering Spirit (formerly Pieter Schelte) is the world's largest vessel by gross tonnage. It was designed for the single-lift installation and removal of large oil and gas platforms and the installation of record-weight pipelines.[4][2]

Crane ship Pioneering Spirit, Maasvlakte 2, Rotterdam
History
Name:
  • 2014–2015: Pieter Schelte
  • 2015 onwards: Pioneering Spirit
Owner: Societe d'Exploitation Pieter Schelte NV[1]
Operator: Allseas Engineering B.V.
Port of registry:
Builder: Daewoo Shipbuilding & Marine Engineering Co, Geoje
Yard number: 3401
Launched: 26 January 2013
Identification:
Status: In service
General characteristics
Tonnage: 403,342 GT[2]
Displacement:
  • 365,000 tonnes (359,000 long tons) (transit) [2]
  • 932,000 (917,000) (maximum)[3]
  • 1,000,000 (980,000) (at maximum draft) [2]
Length:
  • 382 m (1,253 ft) (hull) [2]
  • 477 m (1,565 ft) (maximum, including stinger and tilting lifting beams)[2]
Beam: 124 m (407 ft)[2]
Draft: 10–27 m (33–89 ft)[2]
Depth: 30 m (98 ft)[2]
Installed power: 8 x MAN diesel generator sets (each 11,200 kW)[4]
Propulsion: 12 x Rolls-Royce Diesel-electric azimuth thrusters (each 6,050 kW)[4]
Speed: 14 knots (26 km/h; 16 mph)[4]
Capacity: 48,000-tonne (53,000-short-ton) topsides lift capacity 25,000-tonne (28,000-short-ton) jacket lift capacity 2,000-tonne (2,200-short-ton) pipelay tensioner capacity
Crew: Accommodation for 571[4]

Designed by Swiss-based Allseas Group, the 382-metre (1,253 ft) long, 124-metre (407 ft) wide vessel was built in South Korea by Daewoo Shipbuilding & Marine Engineering (2011–14) at a cost of €2.6 billion and commenced offshore operations in August 2016.

In June 2017, Pioneering Spirit commenced pipelay for the first line of SouthStream Transport B.V's dual 930-kilometre (580 mi) Turkish Stream pipeline in the Black Sea.[5]

Allseas has committed to building an even larger version of the same design, Allseas Amazing Grace, the delivery of which is planned for 2022.[6]

Development

The initial concept, by Allseas technical director W.P. Kaldenbach,[4] was of a vessel capable of lifting entire platforms, and in 1987 Allseas declared its intention to build it.[7] The initial idea featured two rigidly connected, self-propelled supertankers, with a large slot at the bows enabling it to install platform topsides in one piece. Early designs featured a flotation and ballasting system and active motion compensation system to facilitate a controlled transfer of a topsides’ weight from the vessel to a platform substructure. Allseas developed the original idea to include steel jacket installation, jackets and topsides removal and rigid pipelay capabilities.[8]

The emphasis switched from the conversion of two existing tankers to a new-build hull in 2004, though retaining the catamaran concept.[9] The decision was prompted by a lack of suitable vessels to convert, the lower costs associated with a new-build, and the need to house sophisticated equipment – such as a dynamic positioning system – in the hull.[4]

In 2007, twenty years after the idea was first conceived, Allseas announced plans to build the Pieter Schelte, a twin-hulled platform installation / decommissioning and pipelay vessel.[10] Named after the offshore pioneer Pieter Schelte (father of Heerema), the design featured a lifting system at its bows for lifting platform topsides up to 48,000 tonnes (53,000 short tons) and a lifting system at its stern for lifting steel jackets up to 25,000 tonnes (28,000 short tons). The design also included pipelay equipment to handle pipe diameters ranging from 15–175 cm (6–68 inches) at water depths exceeding 4,000 m (13,000 ft).[11]

First equipment orders placed

Allseas placed orders for machinery, including generators and thrusters, in 2007, and for the high-tensile steel for the lifting systems in 2008.[12][13]

After the global financial crisis weakened funding, the company was forced to postpone the building schedule and as a result delayed the awarding of the hull construction contract.[14] Finnish engineering company Deltamarin performed detail engineering in 2009.[15]

Construction

Allseas eventually was able to sign the main construction contract in June 2010 with South Korean shipyard Daewoo Shipbuilding & Marine Engineering Co Ltd.[16]

Midway through the build, Allseas decided to widen the ship by 6.75 m (22.1 ft) in order to increase the clearance between the bows and the legs of large platforms.[17] As a result, the overall width increased from 117 to 124 m (384 to 407 ft), and the slot width from 52 to 59 m (171 to 194 ft).

Pioneering Spirit departed Daewoo in November 2014 and arrived at the Maasvlakte 2, Port of Rotterdam, for completion and commissioning, on January 8, 2015.[18] After the topside lifting system was installed,[19] she left Rotterdam on 6 August 2016.[20]

Naming controversy

Detail at bow, showing new name Pioneering Spirit just below obscured original name Pieter Schelte

The vessel was originally named Pieter Schelte after the engineer Pieter Schelte Heerema, the father of Allseas' owner Edward Heerema. The original name caused controversy due to Pieter Schelte Heerema's service in the Waffen-SS during World War II.[21] After the war, he was arrested and sentenced to jail for three years, because of links to a Dutch company that conscripted slave labourers for the Nazi war effort, according to the Dutch National Institute for War Documentation. The court later released him after one and a half years. Allseas announced on Friday, 6 February 2015 that the vessel's name would be changed in response to the controversy.[22] Her new name, Pioneering Spirit, was announced after the weekend.[23]

Design

Carrying a 5,500 t (6,100-short-ton) test platform in the bow slot (Aug 2016)[24]

Pioneering Spirit is the world's largest vessel, in terms of her gross tonnage (403,342 gt), breadth (123.75 m or 406 ft), and displacement (1,000,000 tonnes or 980,000 long tons).[4][2] The maximum 48,000-tonne (53,000-short-ton) topside lift capacity is achieved by operating as a semi-submersible. For removal of topsides, the vessel straddles the intended payload with the slot formed by the twin bows. The slot measures 122 m × 59 m (400 ft × 194 ft) (L×W). After straddling the payload, Pioneering Spirit takes on ballast to lower, and two sets of eight (one set per bow) retractable motion-compensated horizontal lifting beams are slid under the payload. Once the load is secure, the vessel offloads the ballast, rising in the water and partially transferring the load to the beams. In the final stage a fast lift system is used that lifts the payload up to 2.5 m (8.2 ft) in 15 s.[25]

Two tilting lift beams for the installation or removal of steel jackets, up to 25,000 tonnes (28,000 short tons) in weight, will be located at the vessel's stern.[26] A 5,000 tonnes (5,500 short tons) special purpose crane built by Huisman is scheduled for delivery in the second half of 2018. The tub mounted crane will be available for additional lifts for jacket and topsides installation such as pile handling and bridge installation.[27][28]

Stinger (left) and STF (centre) aboard Bumblebee; Pioneering Spirit in background on right

When equipped with the Stinger, Pioneering Spirit can be used to lay pipe. Pipe segments are welded together on board the vessel, then are placed on the Stinger, where they roll into the water. The Stinger is curved to guide the pipe to the bottom of the ocean. The Stinger itself weighs 4,200 tonnes (4,600 short tons) and measures 150 m (490 ft) long and 65 m (213 ft) wide.[29] It is attached to the Stinger Transition Frame (STF), which provides an interface between the Stinger and the vessel; the STF is installed in the bow slot when attached to the vessel. The Stinger Transition Frame weighs more than 1,600 tonnes (1,800 short tons) by itself.[30]

The vessel is equipped with eight, 20-cylinder (20V32/44CR) MAN 11,200 kW diesel generators providing a total installed power of 95 MW, driving 12 Rolls-Royce azimuth thrusters which provide dynamic positioning (DP3) and for propulsion. The vessel's maximum speed is 14 knots (26 km/h; 16 mph). The accommodation has room for 571 persons in two-berth cabins.[4]

Lift Capacity Upgrade

As per update on July 2019, Allseas is planning to upgrade the lift capacity from 48,000 tonnes to 60,000 tonnes. This reason for the same is to enable the removal of Statfjord A platform in the North Sea.[31] The details of the upgrade are currently unknown.

Iron Lady and Bumblebee

Allseas also constructed two barges to assist Pioneering Spirit. If the water depth is not sufficient to allow the vessel to approach the dock, Pioneering Spirit can unload structures to Iron Lady, a 200 m × 57 m (656 ft × 187 ft) (L×W) barge with a shallower draft. Bumblebee was built specifically to store the Stinger and STF when it is not in use.[25]

Projects

Pioneering Spirit performed her first commercial lift, removal of Repsol's 13,500-tonne (14,900-short-ton) Yme mobile offshore production unit (MOPU) on 22 August 2016.[32] Located in the Yme field in the Norwegian sector of the North Sea, approximately 100 km (54 nautical miles) west of Stavanger, the MOPU was a jack-up type platform standing on three, 3.5-metre (11 ft) diameter steel legs. The decision to remove the platform was made in 2013, and the contract for the removal of the topsides was subsequently awarded to Allseas. Pioneering Spirit collided with the caisson of the Yme platform during the removal.

On 28 April 2017 Pioneering Spirit performed the single-lift removal of Shell's 24,200-tonne (26,700-short-ton) Brent Delta topsides.[2][33] Located in the Brent field, approximately 186 km (100 nautical miles) off the northeast coast of Shetland, the iconic platform sat on a three-legged gravity-based structure in 140 m (460 ft) of water. The vessel delivered the topsides to Able UK's Seaton Port yard, Teesside, for disposal.[34]

Pioneering Spirit has done the installation of the offshore section of the Turkish Stream pipeline in the Black Sea. The pipeline construction started in May 2017 and it was finished in November 2018.[35][36] Starting from the Russian coast near the town of Anapa, the 930-kilometre (580 mi), 80-centimetre (32 in) diameter twin-pipeline will traverse the Black Sea at depths up to 2,200 m (7,200 ft) and emerge onshore in Turkey's Thrace region.[37]

She has installed three out of four platform topsides for phase one of the Johan Sverdrup development in offshore Norway. The drilling platform (DP) topside was installed in June 2018. The other two topsides named P1 and LQ were installed in March 2019. With P1 topside weighing 26,000 tons, this is one the heaviest single-lift executed offshore till date, after Wheatstone of 36,000 ton and Arkutun Dagi of 42,380 ton, both with the H 851.[38][39][40][41] The vessel is expected to return in 2022 to install P2 topside weighing 27,000 tons for phase two of the Johan Sverdrup development.[42]

It removed Valhall QP topside for Aker BP in June 2019. This structure was an accommodation platform in Valhall field, located in southern part of North Sea about 280km off the Norwegian coast.[43] Weighing 3800 ton, it is the lightest lift operation performed by the vessel.[44]

In June 2019 Pioneering Spirit also removed the Brent Bravo topside weighing 25,000 tonne located 186km off the coast of Scotland on the way to Norway. She is scheduled to remove the remaining two Brent field topsides for Shell, the 15,000 tonne Brent Alpha and 29,500 tonne Brent Charlie.[45]

References

  1. LR
  2. "Pioneering Spirit". Allseas.com.
  3. Pioneering Spirit (Pieter Schelte). Deltamarin. Retrieved 2016-10-22.
  4. Shaw, John (May 2018), "Pioneering Spirit: Profile of the World's Biggest Ship", Ships Monthly: 33–37
  5. "TurkStream project summary (Gazprom)". www.gazprom.com.
  6. "Allseas to build a single lift vessel larger than Pieter Schelte" (PDF). allseas.com.
  7. "Allseas history". www.allseas.com.
  8. "Catamaran can lift out decks and jackets on single trips". www.offshore-mag.com.
  9. "Pioneering Spirit Heavy Lift Construction Vessel". Ship Technology. Retrieved 2017-06-08.
  10. "Biggest vessel in the world gets underway" (PDF). www.allseas.com.
  11. "Pieter Schelte the heavyweight contender for North Sea abandonment program". www.offshore-mag.com.
  12. "Long-lead items for platform installation/decommissioning and pipelay vessel Pieter Schelte ordered" (PDF). allseas.com.
  13. "High tensile steel for the jacket and topsides lift systems of Pieter Schelte ordered" (PDF). allseas.com.
  14. "Development of Pieter Schelte" (PDF). allseas.com.
  15. "Pioneering Spirit pipelay vessel". deltamarin.com.
  16. "Construction contract of Pieter Schelte awarded to Daewoo" (PDF). allseas.com.
  17. "Mega projects on the horizon for the Pieter Schelte". offshore-engineer.com.
  18. "Biggest ship in the world arrives in Rotterdam". Port of Rotterdam.
  19. "Interview: Edward Heerema – Founder and President, Allseas – Netherlands". www.energyboardroom.com. Retrieved 2020-09-16.
  20. "Pioneering Spirit departs Rotterdam" (PDF). allseas.com. Allseas.
  21. "How billionaire shipping magnate Edward Heerema punished his €100m scammers". Australian Financial Review. 2018-07-13. Retrieved 2020-09-15.
  22. "Allseas to change the name of the vessel Pieter Schelte" (PDF). www.allseas.com.
  23. "New name for Allseas' single-lift vessel" (PDF). www.allseas.com.
  24. "'Pioneering Spirit' successfully installs test platform". Ocean Energy Resources. 9 August 2016. Retrieved 21 March 2018.
  25. "Pioneering Spirit in Full Swing". Ivormate Magazine. July 2017. Archived from the original on 22 March 2018. Retrieved 21 March 2018.
  26. "Jacket Lift System Pioneering Spirit". IV-Consult. Archived from the original on 22 March 2018. Retrieved 21 March 2018.
  27. "New Crane Orders for Huisman". Yellow & Finch. August 2016. Retrieved 21 March 2018.
  28. Beckman, Jeremy (9 November 2016). "Pioneering Spirit proves strength, stability with record topsides lift". Offshore. Retrieved 21 March 2018.
  29. "Stinger Pioneering Spirit". Eiffage Smulders. 2016. Retrieved 21 March 2018.
  30. "HLV Rambiz to lift Stinger Transition Frame (STF) at Flushing from the barge Bumblebee to the quay". Scaldis. 11 April 2016. Archived from the original on 12 December 2017. Retrieved 21 March 2018.
  31. "Lift capacity Pioneering Spirit to be increased". Project Cargo Journal. Retrieved 2020-04-03.
  32. "Pioneering Spirit completes maiden heavy lift project" (PDF). allseas.com.
  33. "World's largest vessel breaks record". www.skynews.com.
  34. "Shell Brent Delta Photos and Video". www.ableuk.com.
  35. "StackPath". www.offshore-mag.com. Retrieved 2020-04-03.
  36. "TurkStream gas pipeline's offshore section completed". www.gazprom.com. Retrieved 2020-04-03.
  37. "Project". turkstream.info. Retrieved 2020-04-03.
  38. Wheatstone, HMC
  39. LOAD-OUT OF 37,000T WHEATSTONE PROJECT TOPSIDE, SOUTH KOREA, ALE
  40. Arkutun Dagi, HMC
  41. 'Another Sakhalin GBS goes in', Offshore Engineer
  42. "Pioneering Spirit sets new offshore lift record". Project Cargo Journal. Retrieved 2020-04-03.
  43. "Pioneering Spirit vessel removes Valhall QP topside". Offshore Energy Today. Retrieved 2020-04-06.
  44. "StackPath". www.offshore-mag.com. Retrieved 2020-04-06.
  45. Dahm2019-06-24T14:06:00+01:00, Alex. "Allseas lifts 25,000 tonne platform". KHL. Retrieved 2020-04-03.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.