Plastiras Dam
The Plastiras Dam (Greek: Φράγμα Πλαστήρα) is a concrete arch dam in Karditsa regional unit, Greece that impounds the Tavropos (Megdovas) River, creating an artificial lake called Lake Plastiras.
Plastiras Dam Φράγμα Πλαστήρα | |
---|---|
Plastiras Dam | |
Location of Plastiras Dam Φράγμα Πλαστήρα in Greece | |
Country | Greece |
Coordinates | 39°14′08″N 21°44′47″E |
Construction began | December 14, 1955 |
Opening date | October 30, 1960 |
Dam and spillways | |
Type of dam | Concrete arch |
Impounds | Tavropos (Megdovas) |
Height | 83 m (272 ft) |
Width (crest) | 220 m (720 ft) |
Reservoir | |
Creates | Lake Plastiras |
Total capacity | 400,000,000 m3 (320,000 acre⋅ft) |
Power Station | |
Operator(s) | Public Power Corporation of Greece |
Turbines | 3 x 43.3 MW Pelton-type[1] |
Installed capacity | 130 MW (max. planned) |
Name
The dam is named after Nikolaos Plastiras, a Greek general and politician who was the first to visualize the construction of a reservoir in the Agrafa area as early as 1925. He later boosted the efforts while serving as Prime Minister, but did not live to see the construction of the dam.
Background
The river Tavropos was known in the area for causing flooding frequently. In the late 1920s the idea of "constraining" the river flow was adopted by the incumbent Minister for Agriculture, but was met with opposition by both his political rivals and locals. Some of the concerns were the overall cost of the building and the impact a reservoir would have on the landscape. After the Second World War, the idea was revived by Prime Minister Nikolaos Plastiras and was also adopted by the Power Corporation. The Power Corporation included the construction of a dam in the area in its effort to electrify the country. Numerous studies on the project were presented and in 1953 the French Omniun Lyonnais won the international contest for the construction of the Dam.
Construction and specifications
The building was officially begun on December 14, 1955, and the construction lasted for almost five years. The dam was completed on October 30, 1960. Plastiras Dam is known as a "Double arched dam" and it is made of concrete. It is unique in Greece and blocks a narrow point known as Kakavakia. The dam is elevated 795 m (2,608 ft) from sea level. It stands 83 m (272 ft) high and has a crest width of 220 m (720 ft). Its overall volume is 100×103 m³.
Local impact
The dam and the formed reservoir protect both the mountainous region of East Agrafa and the Plains of Karditsa from flooding. As a reservoir it provides irrigation water to the area and is also used to supply fresh water to the city of Karditsa and the surrounding villages. Moreover, the dam is equipped with two hydroelectric turbines that have a capacity of 130MW. Despite the original fears, the formation of the artificial lake is believed to be one of the few cases where the landscape was actually improved. The lake itself is a tourist attraction in Greece. The local economy has been improved since the 1980s due to visitors, and many of the abandoned villages in the area have been revived.
The benefits of the lake as a tourist attraction are so significant that the authorities have decided to limit the use of the reservoir for irrigation and electricity production.[2]
References
- "Plastira Hydroelectric Power Plant". Global Energy Observatory. Retrieved 25 February 2012.
- "Hydrology and Earth System Sciences, 9, 507–515" (PDF).
External links
Media related to Plastiras Dam at Wikimedia Commons