Puducherry–Bhubaneswar Superfast Express
The Puducherry– Bhubaneswar Superfast Express is a Superfast train belonging to East Coast Railway zone that runs between Puducherry and Bhubaneswar in India. It is currently being operated with 22907/22908 train numbers on a weekly basis.[1] [2] [3]
Overview | |||||
---|---|---|---|---|---|
Service type | Superfast | ||||
First service | 21 February 2007 | ||||
Current operator(s) | East Coast Railway zone | ||||
Route | |||||
Start | Puducherry (PDY) | ||||
Stops | 17 | ||||
End | Bhubaneswar (BBS) | ||||
Distance travelled | 1,426 km (886 mi) | ||||
Service frequency | Weekly [lower-alpha 1] | ||||
Train number(s) | 22907/22908 | ||||
On-board services | |||||
Class(es) | AC 2 tier, AC 3 tier, Sleeper class, General Unreserved | ||||
Seating arrangements | No | ||||
Sleeping arrangements | Yes | ||||
Catering facilities | On-board catering E-catering | ||||
Observation facilities | LHB coaches | ||||
Entertainment facilities | No | ||||
Baggage facilities | No | ||||
Technical | |||||
Rolling stock | 2 | ||||
Track gauge | 1,676 mm (5 ft 6 in) | ||||
Operating speed | 59 km/h (37 mph), including halts | ||||
|
Service
The 12897/Puducherry–Bhubaneswar SF Express has an average speed of 59 km/hr and covers 1426 km in 24h. The 12898/Bhubaneswar–Puducherry SF Express has an average speed of 57 km/hr and covers 1426 km in 25h 15m.
Schedule
Train number | Station code | Departure station | Departure time | Departure day | Arrival station | Arrival time | Arrival day |
---|---|---|---|---|---|---|---|
12897 | PDY | Puducherry | 6:40 PM | Wednesday | Bhubaneswar | 6:55 PM | Thursday |
12898 | BBS | Bhubaneswar | 12:00 Noon | Tuesday | Puducherry | 1:15 PM | Wednesday |
Route and halts
The important halts of the train are:
Coach composite
The train has LHB coaches with max speed of 130 kmph. Being a Superfast train, its speed limit is 110 kmph The train consists of 22 coaches:
- 1 AC II Tier
- 4 AC III Tier
- 12 Sleeper coaches
- 1 Pantry car
- 2 General Unreserved
- 2 Generator Cars cum Guard Cars in both ends
Traction
Both trains are hauled by a Visakhapatnam Electric Loco Shed-based WAP-4 electric locomotives from end to end in both directions.
Rake sharing
The train shares its rake with 18495/18496 Rameswaram–Bhubaneswar Express.
Notes
- Runs one day in a week for every direction.
References
- "Trains cancelled due to heavy rains". The Hindu. 5 December 2015. Retrieved 3 January 2019.
- Train services hit in Chennai-Gudur section
- Transport services to Chennai crippled