Swiss Northeastern Railway

The Swiss Northeastern Railway (Schweizerische Nordostbahn; NOB) was an early railway company in Switzerland. It also operated shipping on Lake Constance (Bodensee) and Lake Zürich. Until the merger of the Western Swiss Railways into the Jura–Simplon Railway (JS) in 1890/91, it was the largest Swiss railway company.

Swiss Northeastern Railway
Iron bridge across the Thur, built in 1856/7 as part of the line between Winterthur and Schaffhausen which was put into service in 1857 (lithograph from 1857)
Overview
Native nameSchweizerische Nordostbahn
History
Opened1 July 1853 (1853-07-01)
Closed1 January 1902 (1902-01-01)
Technical
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Swiss Northeastern Railway in 1871–1874

km
Konstanz
100.88
national border
Friedrichshafen
(Württemberg)
56.06
Schaffhausen
82.15
82.15
Romanshorn
Waldshut
(Baden)
42.70
national border
(Rhine bridge)
26.14
Winterthur
97.27
Rorschach
27.43
Turgi
0.00
Zürich
43.44
Wöschnau
near Aarau

History

Baden station in about 1850

The Swiss Northeast Railway was created on 1 July 1853 by the merger of the Swiss Northern Railway (Schweizerische Nordbahn—SNB— informally known as the Spanisch-Brötli-Bahn), and the Zürich-Lake Constance Railway (Zürich-Bodenseebahn).[1] The originally planned continuation of the Northern Railway from Baden to Basel initially failed due to the different interests of the cantons of Zürich, Aargau and Basel.

The main initiator of the merger was the Zürich-based businessman Alfred Escher, who previously headed the Zürich-Lake Constance Railway. He advocated the funding of the railways by private investors instead of public funds. He suggested the founding of Schweizerische Kreditanstalt to meet the large capital requirements of the railways.

The NOB endeavored to establish connections with foreign countries to generate freight traffic. It first opened a direct connection from Zürich to Lake Constance. Thus it became a direct competitor of the United Swiss Railways (Vereinigte Schweizerbahnen; VSB) based in St. Gallen. the NOB opened the line from Romanshorn to Winterthur on 16 May 1855. The Zürich–Winterthur extension was opened in two stages from Winterthur to Oerlikon on 27 December 1855 and to Zürich on 26 June 1856; this gave a connection to the former Northern Railway between Zürich and Baden. The arrival of the railway caused the peaceful village of Romanshorn to grow into one of the most important transport hubs in eastern Switzerland. The NOB started a shipping service on Lake Constance in 1855. The train ferry service between Romanshorn and Friedrichshafen (Germany) was established in 1869. This led the NOB to expand the railway facilities and to construct the largest of the ports on Lake Constance (measured by area), which required the shore to be raised.

Aarau station with a waiting train of the SCB to Olten
Rhine Fall Bridge and Laufen Castle in a painting by Hubert Sattler

The NOB started work on the Winterthur–Schaffhausen railway in 1856 and it was opened on 16 April 1857. The line of the former Northern Railway between Zürich and Baden was extended to the west. The section of the Baden–Aarau railway from Baden to Brugg with the bridge over the Reuss was opened on 29 September 1856. The rest of the line to Aarau was opened on 15 May 1858 where the network of NOB connected with the network of the Swiss Central Railway (Schweizerische Centralbahn; SCB) at Wöschnau on the Aargau-Solothurn canton border, meaning that Zürich was now connected with Basel.

On 18 August 1859, the NOB was able to complete a direct connection with a foreign country with the opening of the Turgi–Waldshut line. This completed the main network of Northeastern Railway. The most important northern gateway to Switzerland was Basel, but it was controlled by the SCB. Freight transport was NOB's most important business segment, which initially enjoyed good returns.

The NOB was involved with other railway companies. After the Schweizerische Ostwestbahn (Swiss East West Railway, OWB), which had been founded in 1861, had become bankrupt in an attempt to build a line from La Neuveville via Bern and Lucerne to Zürich, the NOB together with the cantons of Zürich, Zug and Lucerne, took over part of its line and completed it as the Zürich–Zug–Lucerne Railway (ZZL), which was finished on 1 June 1864.

The NOB—like other railway companies at the time—aimed at short-term profit maximisation for private bankers. The bankers took offices in management and the board of directors to secure their profits. The rights of the other shareholders was undermined by the use of common stock. They gained exemption from tax and subsidies through political influence. Alfred Escher was not only Chairman of the NOB and Chairman of Kreditanstalt, but also a member of the Executive Council of Zürich and, for 34 years, the National Council. Maintenance was neglected and the assets of the railway company were run down. This had already created a crisis in 1857, which was intensified in 1867.

Railway crisis

Share capital and fixed bonds (left scale) as well as dividends of NOB (right scale)
Free 1st class ticket of the NOB Board member Emil Streuli-Hüni

The behavior of the Zürich railway barons led the Swiss National Railway (Schweizerische Nationalbahn; SNB) to attempt to build a second rail link between Lake Geneva and Lake Constance to compete with the existing railway companies from 1872. As a defense measure, the NOB and SCB extended their existing networks between 1873 and 1882. The two companies founded the Aargau Southern Railway (Aargauische Südbahn) and the Bözberg Railway (Bözbergbahn) with equal shareholdings. The former was built and opened between 1873 and 1882 the Rupperswil–Immensee railway with a branch line from Hendschiken to Brugg, connecting the network of the NOB and the SCB with the Gotthard Railway in 1882. The Bözberg Railway, operated by the NOB, opened the Brugg–Pratteln railway in 1875, which together with the existing lines of the NOB and the SCB created a direct connection from Zurich to Basel.

In addition, the NOB under the new CEO Friedrich Peyer im Hof, tried to eliminate the competition in advance by an accelerated expansion of its own network. It secured concessions for various railway lines and entered into commitments with cantons and founding committees for the construction of these unprofitable lines. This forced the NOB to borrow money, which led to massive indebtedness. The financial difficulties brought the NOB to the brink of collapse. The construction of the Lake Zürich right-bank line, which it had begun in 1873, had to be discontinued because of the financial crisis. The important Lake Zürich left-bank railway to Ziegelbrücke, however, was opened in 1875. The NOB could not pay dividends for years from 1877. The price of its shares collapsed from Swiss Francs (CHF) 670 in 1871 to CHF 53 in 1879. An investigation commissioned by the General Assembly found grave mistakes in corporate governance.

On 2 March 1877, the NOB requested that the Federal Council release it from its obligations to build railways. On 14 February 1878, the Federal Assembly confirmed an agreement that the construction obligations would be maintained, but would be deferred until the completion of the NOB's financial restructuring. The construction period for the so-called "moratorium lines" (Thalwil–Zug, Etzwilen–Schaffhausen, Bülach–Schaffhausen, Koblenz–Stein, Dielsdorf–Niederweningen and the Lake Zurich right bank line) was extended. An agreement with the canton of Glarus set the date for the completion of the Glarus–Linthal line at 1 May 1879.[2] The payment of dividends was suspended from 1880 to 1883. On 25 October 1887, the Federal Council instructed the NOB to begin construction of the Lake Zurich right bank line. The deadlines for the remaining moratorium lines were set on 27 June 1888.

The ruinous competitive project of the National Railway ended in insolvency. The participating towns and municipalities had to suffer decades of debt. The NOB took over the network of its rival for a fraction of its construction cost on 1 October 1880. The Zofingen–Suhr section was resold to the SCB.

Recovery and nationalisation

Due to increasing traffic, additional rolling stock had to be procured. Tender locomotive No. 63 supplied by SLM in 1894
Staff went on strike in support of wage claims in 1897. Employees of Horgen station in about 1890.
Bond of the Swiss Northeast Railway Company worth CHF 500 of 15 April 1884

The situation of the NOB slowly improved again after 1880. Increasing traffic led to the extension of stations and the procurement of additional rolling stock. After Alfred Escher's death in 1882, Adolf Guyer-Zeller became head of the NOB.

The railway crisis had caused many domestic shareholders to sell their securities to major foreign shareholders. Railway shares played a major role in speculation on the stock exchange. A financial group led by Adolf Guyer was able to secure a majority of votes at a general meeting of the company, allowing it to select the board of directors and replace it with people who would cooperate with its interests.

The vast majority of the shares were in foreign hands, the majority of the bonds belonged to Swiss owners. At the time, the interest rate was 4% for secure Swiss rail bonds. In order to increase the return of the shares, bonds were converted into shares with an interest rate of 3½%. This reduced the company's interest burden and increased profits.

Clash at Seebach on 8 January 1885

On 8 January 1885, a WinterthurZürich train ran into a train coming from Wettingen after passing a stop signal. The train from Wettingen was pushed back from Seebach over the junction on the open track towards Zurich. The accident caused seven casualties and major property damage.[3] An NOB passenger train hit a group of Central Railway workers, which had been busy with track work, at the southern exit from Gütsch tunnel near Lucerne on 30 May 1898. Seven railway workers were killed immediately and four seriously injured.[4] On 4 June 1899, the Zurich–Geneva night express of the NOB ran past a designated stopping point in Aarau and ran into two stationary Central Railway locomotives. The accident caused two deaths and three serious injuries.[5]

Labour regulations and the wage demands of railway workers, which the other private railways acceded to in 1896, met with resistance from the profit-oriented NOB. This led to a labour dispute with NOB staff in 1897. In Zurich, masses of passengers wrote in the complaints book. At times, milk was scarce. The 5000 employees were able to enforce their claims after 41 hours of strikes. The industrial action at the NOB contributed to the holding of a referendum in 1898, which approved the nationalisation of the largest private railways.[6]

The NOB with a route network of 853 km and the Swiss Lake Constance fleet passed into the possession of the Swiss Federal Railways (SBB) on 1 January 1902.

Shipping companies

Shipping was the natural continuation of the railway lines that ended at the lakes. The transport of the passengers was not difficult. The transport of goods, however, was much more complicated and expensive because the goods had to be reloaded twice.

Lake Constance

Romanshorn harbour with station hall about 1860 with mole and warehouse.

The Lake Constance (Bodensee) route was the most important trade route for traffic between Switzerland and Germany. The Rhine only became navigable to Basel in 1904. The NOB started operating shipping services on Lake Constance with the Thurgau and the Stadt Zürich in 1855. The NOB merged with the Schweizerischen Dampfboot-Aktiengesellschaft für den Rhein und Bodensee (Swiss Steamboat Corporation for the Rhine and Lake Constance) on 1 January 1857. It was founded in 1850 in Schaffhausen as a cantonal enterprise and in the following four years put into service the steamships Stadt Schaffhausen, Rhein, Stadt St. Gallen and Bodan. In 1863, shipping operations on the Rhine were discontinued and the four steamships were relocated to Romanshorn.

On 11 March 1861 the steamer Stadt Zürich rammed and sank the Bavarian steamer Ludwig. Three persons survived, 13 were killed. On 12 February 1864 the Bavarian steamer Jura was also rammed and sunk by the Stadt Zürich.

In order to avoid the reloading of goods, the Bavarian and the Württemberg steamship administration together with the NOB decided in 1867 to transport railway wagons by train ferry. A steam ferry known as "steam ferry I" was used on the Friedrichshafen–Romanshorn route. This over 70 metre-long ferry was able to accommodate 18 freight wagons, but had a horrendous rate of coal consumption. It was retired in 1882 and subsequently scrapped. A second ferry known as "steam ferry II" started operating between Lindau and Romanshorn in 1874.

In 1884, the flat-deck steamer Stadt Zürich was converted into the semi-private steamer Zürich. In 1887, the NOB put the newly built saloon steamer Helvetia III into service, which caused a sensation with its clipper bow and bowsprit. In 1892, the mixed steam/sailing ship Säntis replaced the Stadt Schaffhausen. The mixed steam/sailing ship St. Gotthard was similarly replaced by the flat-deck steamer Stadt St. Gallen in 1897.

In 1902, with the nationalisation of the NOB the entire shipping company was transferred to the Swiss Federal Railways (SBB).

Lake Zürich

In 1864, the Dampfbootgesellschaft linkes Ufer (Left Bank Steamboat Company) was established in Horgen. In 1868, it merged with the older Zürichsee-Walensee-Gesellschaft AG (Lake Zürich-Walensee Company) to form the Dampfbootgesellschaft für den Zürichsee (Steamboat Company for Lake Zürich). Shortly before the commissioning of the Lake Zürich left bank railway (Linksufrige Zürichseebahn), the NOB took over the entire shipping fleet in 1875. The NOB curtailed operations immediately so rival companies formed. When the Zürich–Meilen–Rapperswil railway started operation in 1894, the existing fleet of six ships: Helvetia, Concordia, Lukmanier, St. Gotthard, Taube and Schwalbe was reduced.

With the nationalisation of the NOB in 1903, shipping operations were outsourced. All public shipping services were taken over by the Zürichsee-Schifffahrtsgesellschaft (Lake Zürich Navigation Company; ZDG) in 1902. The paddle-wheel and screw steamers taken over from the NOB were replaced by more modern ships, with the exception of the Helvetia.

A train ferry operated on Lake Zurich only for a short time. The NOB put an unnamed train ferry built by Escher, Wyss & Cie. into operation in 1885. The traffic from the left bank transshipment port of Wollishofen to the right bank Uetikon was used practically exclusively for traffic to/from the local CU Chemie Uetikon chemical factory. Operations were discontinued with the opening of the Zürich–Meilen–Rapperswil railway in the autumn of 1894.

Route network

Postcard with route network of the NOB
Entry of a train into Bassersdorf station shortly after the turn of the century
No.RailwaySectionOpeningDuplicatedRemarksLength
1.Zürich–Turgi –Aarau –WöschnauZürichBaden9 Aug. 18471861Built by the Swiss Northern Railway (SNB), opened on 1 July 185349.551 km
Baden–Turgi29 Sept 1856
Turgi–Brugg AG1862
Brugg AG–Aarau15 May 1858
Aarau–Wöschnau16 July 1872Connecting to the Central Railway (SCB) in Wöschnau
2.Zürich–Winterthur –RomanshornZürich–Oerlikon26 June 185630 May 1860Planned by the Zürich-Lake Constance Railway (Zürich-Bodenseebahn), opened on 1 July 185382.538 km
Oerlikon–Wallisellen27 Dec. 1855
Wallisellen–Effretikon1861
Effretikon–Winterthur1862[lower-alpha 3]
Winterthur–Romanshorn16 May 1855
3.Lake LineRomanshorn–Rorschach15 Oct. 1869Rorschach Hafen–Rorschach: parallel track to the United Swiss Railways (Vereinigte Schweizerbahnen; VSB)33.292 km
Romanshorn–Kreuzlingen[lower-alpha 2]–national border(–Konstanz)1 July 1871
4.Rheinfall railway (Winterthur–NeuhausenSchaffhausen)16 April 1857Planned by the Rheinfallbahn, opened on 4 Nov. 185630.380 km
5.Turgi–Koblenz–national border (–Waldshut)18 Aug. 1859Property of the Grand Duchy of Baden State Railway (BadStB) from the middle of the Rhine Bridge15.509 km
6.Lake Zürich left-bank railway (Zürich–Ziegelbrücke)Zürich–Wiedikon20 Sept. 187527 May 189755.824 km
Wiedikon–Thalwil1 June 1896
Thalwil–Ziegelbrücke
7.Ziegelbrücke–LinthalZiegelbrücke–NäfelsNäfels–Glarus line owned by the VSB, shared by NOB19.688 km
GlarusLinthal1 June 1879
8.Winterthur–Bülach–Eglisau–KoblenzWinterthur–Bülach1 Aug. 187647/170 km
Bülach–Eglisau1 June 1897[lower-alpha 4]Part of the Zürich–Bülach–Schaffhausen line
Eglisau–Koblenz
9.(Zürich-) Oerlikon–Oberglatt–Bülach1 May 1865Built by the Bülach-Regensberg-Bahn (BR), opened on 1 Jan. 187715.945 km
10.Wehntal RailwayOberglattDielsdorf10.750 km
Dielsdorf–Niederweningen12 Aug. 1891[lower-alpha 5]
11.Bülach–Baden railway (NiederglattOtelfingenWettingen)1 Oct. 187718.293 km
12.Winterthur–Etzwilen –Singen17 July 1875Built by Swiss National Railway (SNB), taken over on 1 Oct. 188043.961 km
13.Etzwilen–Emmishofen–Konstanz and Emmishofen[lower-alpha 2]–Kreuzlingen[lower-alpha 2]30.099 km
14.Effretikon–Kloten–Oerlikon–Seebach–Otelfingen (–Wettingen)15 Oct. 1877Built by the National Railway (parallel with the Otelfingen–Wettingen line of the NOB), taken over by NOB on 1 June 1880; second track on Otelfingen–Wettingen line dismantled in 1882.27.207 km
15.Wettingen–Lenzburg–SuhrWettingen–Baden OberstadtBuilt by the National Railway, taken over on 1 June 188023.249 km
Baden Oberstadt–Suhr6 Sept. 1877
16.Suhr–AarauBuilt by the National Railway, taken over on 1 June 1880 by the NOB together with the SCB1.752 km
17.Sulgen–Gossau railway (SulgenGossau)1 Feb. 1876Built by the Bischofszellerbahn (SG), taken over on 1 Aug. 188522.670 km
18.Effretikon–Wetzikon–Hinwil17 Aug. 1876Built by the Effretikon–Pfäffikon–Hinwil Railway Company (EH), taken over on 1 Jan. 188622.157 km
19.Zürich Altstetten–Kollermühle–Zug and Kollermühle–Untergrund[lower-alpha 6](–Lucerne)1 June 1864Built by the Zürich–Zug–Lucerne Railway (ZZL), opened on 1 Jan. 189262.550 km
20.Lake Zürich right-bank railway line (Zürich–Rapperswil)Stadelhofen–Rapperswil15 March 1894[lower-alpha 5]34.359 km
Zürich–Stadelhofen1 Oct. 1894[lower-alpha 5]
21.Etzwilen–SchaffhausenEtzwilen–Feuerthalen1 Nov. 1894[lower-alpha 5]16.248 km
Feuerthalen–Schaffhausen2 April 1895[lower-alpha 5]
22.(Bülach-) Eglisau–Neuhausen (-Schaffhausen)1 June 1897[lower-alpha 5]Running through German territory between Rafz and Neuhausen16.248 km
23.Thalwil–Zug1 June 1897[lower-alpha 5]The Zug–Arth-Goldau extension, which was opened simultaneously, belonged to the Gotthard Railway (GB).17.049 km
Total (1901)94.202 km (14%)697.453 km
Routes shared with other railways:
1.Bözberg Railway (BöB)PrattelnStein-Säckingen2 Aug. 187524 March 1895NOB and SCB (operated by the NOB)47.970 km
Stein-Säckingen–Brugg AG
Stein-Säckingen–Koblenz1 Aug. 1892[lower-alpha 5]25.501 km
Total (190)21.40 km (29%)73.471 km
2.Aargau Southern Railway (ASB) RupperswilHendschikenWohlenImmensee and Brugg AG–Hendschiken1874 bis 1882NOB and SCB (operated by the SCB)57.472 km
3.Wohlen–Bremgarten Railway (WB)1 Sept. 1876NOB, SCB and Bremgarten municipality (operated by the SCB)6.620 km

Assumed lines

Railway companySectionOpeningLengthRemarksParticipation of NOBTakeover date
Swiss Northern Railway (SNB)Zürich–Baden railway9 August 184722.53 km1 July 1853
Zürich-Bodenseebahn (ZBB)Zürich–Winterthur –Romanshorn(18 May 1855)82.54 kmTaken over before start of operation1 July 1853
Rheinfall RailwayWinterthur–Schaffhausen(16 April 1857)30.38 kmTaken over before start of operation4 November 1856
Bülach-Regensberg-Bahn (BR)Oerlikon–Oberglatt–Bülach/Dielsdorf1 May 186520.30 kmOperated by the NOBCHF 0.6 m bonds (33%)1 January 1877
Bischofszellerbahn (SG)Sulgen–Gossau1 February 187622.67 kmOperated by the NOBCHF 03 m shares (19%)1 August 1885
Effretikon-Wetzikon-Hinwil-Bahn (EH)Effretikon–Hinwil17 August 187622.67 kmOperated by the NOB, bankrupt in 1885CHF 0.5 m shares (20%)1 January 1886
Zürich–Zug–Lucerne Railway (ZZL)Zürich Altstätten–Kollermühle–Zug/ –Untergrund[lower-alpha 6] (–Lucerne)1 June 186462.55 kmOperated by the NOBCHF 6 m shares (50%)1 January 1892

References

Notes

  1. Emmishofen station now called Kreuzlingen.
  2. The former Kreuzlingen station is now called Kreuzlingen Hafen
  3. Since the opening of the National Railway Effretikon–Wettingen line on 15 October 1877 a parallel track to its double track. Third track dismantled in 1880.
  4. Double-track route opened simultaneously with the Eglisau–Neuhausen line
  5. Moratorium line; the obligation to construct it was postponed in 1878
  6. The former Untergrund crossing loop is now called Gütsch.

Footnotes

  1. Schleich 1894, pp. 121 ff.
  2. "Bundeslbeschluss betreffend Fristverlängerung für die Eisenbahnen: aargauische Südbahn, Glarus–Linththal, Thalweil–Zug, Etzweilen–Schaffhausen, Bülach–Schaffhausen, Koblenz–Stein, rechtsufrige Zürichseebahn, Dielstorf–Niederweningen". Federal Gazette (in German). 29 (4): 753–754. 1877.
  3. "Eisenbahnunfall bei Seebach". Schweizerische Bauzeitung (in German). 5 (2): 11. 1985.
  4. "Bericht des Bundesrates an die Bundesversammlung über seine Geschäftsführung im Jahre 1889" (PDF, 0.4 MB). Schweizerisches Bundesblatt (in German): 411. 1 March 1899. Retrieved 29 January 2019.
  5. "Bericht des Bundesrates an die Bundesversammlung zum Begnadigungsgesuche des wegen fahrlässiger Eisenbahngefährdung verurteilten Heinrich Metzger, gewesenen Lokomotivführers der schweizerischen Nordostbahn, in Seebach bei Zürich" (PDF, 0.4 MB). Schweizerisches Bundesblatt (in German): 885. 21 June 1902. Retrieved 29 January 2019.
  6. Bernet, Walter (11 January 2014). "Zum Auftakt eine Katastrophe". Neue Zürcher Zeitung (in German). Retrieved 29 January 2019.

Sources

  • Bärtschi, Hans-Peter (30 November 2011). "Schweizerische Nordostbahn (NOB)". Historisches Lexikon der Schweiz (in German). Retrieved 28 January 2019.
  • Bärtschi, Hans-Peter; Ramsauer, Adrian; Hauswirth, Jürg (2005). Die Bodenseebahn 1855–2005. Romanshorn–Winterthur–Zürich (in German). Lucerne: Minirex. ISBN 3-907014-18-9.
  • Dietler (1917). "Schweizerische Nordostbahn". Röll: Enzyklopädie des Eisenbahnwesens (in German). Retrieved 28 January 2019.
  • Frey, Thomas; Schiedt, Hans-Ulrich. "Schweizerische Nordostbahn". bahndaten.ch. Daten zu den Schweizer Eisenbahnen 1847–1920 (in German). ViaStoria. Retrieved 28 January 2019.
  • Hunziker, Fritz (6 April 1952). "Von der "Minerva" bis zur "Linth"" (PDF). Neue Zürcher Zeitung (in German). Retrieved 28 January 2019.
  • Luz, Alfred (1932). Die Anfänge der Schweizerischen Nordostbahn bis zur Vollendung des Stammnetzes (1852–1859) (in German). Zürich: Hans A. Gutzwiller AG.
  • Reimann, Lukas (1 July 2009). Geschichte der Schifffahrt in der Schweiz (in German).
  • Schleich, H. (1894). "Die bauliche Entwicklung des Bahnhofes Winterthur". Schweizerische Bauzeitung (in German) (23/24): 121 ff. ISSN 0036-7524.CS1 maint: ref=harv (link)
  • Wägli, Hans G. (2010). Schienennetz Schweiz und Bahnprofil Schweiz CH+ (in German). Zürich: AS Verlag. ISBN 978-3-909111-74-9.CS1 maint: ref=harv (link)
  • Weissenbach, Plazid (1913). Das Eisenbahnwesen der Schweiz (PDF 14.8 MB) (in German). Retrieved 28 January 2019.
  • Ziegler, Peter (18 December 2013). "Zürichsee". Historisches Lexikon der Schweiz (in German). Retrieved 28 January 2019.
  • "Die Geschichte der Personenschifffahrt auf dem Bodensee". Bodenseeschifffahrt.de (in German). Florian Scholz. 26 February 2014. Retrieved 28 January 2019.
  • "Schifffahrt". Dem Rhein entlang (in German). Maturitätsarbeit an der Kantonsschule Baden. 26 November 2006. Retrieved 28 January 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.