Thacker Pass lithium deposit
The Thacker Pass lithium deposit, previously called the Kings Valley lithium deposit, is a lithium clay mining development project located in Humboldt County, Nevada.[2][3] The project is located 21 miles (34 km) west-northwest of Orovada, Nevada within the McDermitt Caldera,[4][5] and overlaps with 2866 acres of big sagebrush habitat, as well as known golden eagle breeding sites.[6]
Location | |
---|---|
Thacker Pass lithium | |
Nevada | |
Country | United States |
Coordinates | 41°42′30″N 118°03′43″W[1] |
Production | |
Products | Lithium |
History | |
Opened | not yet operational |
Owner | |
Company | Lithium Americas Corp. |
Website | Thacker Pass website |
The Thacker Pass lithium project has Proven and Probable Reserves of 179 million tonnes of lithium ore grading 0.33% lithium, being 3.14 million tonnes of Lithium Carbonate Equivalent (LCE).[7][8] As of 2017, the Thacker Pass hectorite deposit was the most significant lithium-clay resource discovered in the U.S.[4] Unlike more conventional brine mining, hectorite clay requires sulfuric acid treatment to separate lithium salts from associated minerals.
In August 2019 Lithium Americas lodged a Plan of Operations for its proposed mining project with the Bureau of Land Management, the federal mining regulator.[9] In January 2020 the company announced the publication of a Notice of Intent to prepare an Environmental Impact Statement for the Thacker Pass lithium project.[10]
On January 15, 2021, BLM issued their Record of Decision[11] in which the plan set forth in the Environmental Impact Statement was approved following public input. Protestors began occupying the site on the same day.[12]
References
- Final Environmental Assessment DOI-BLM-NV-W010-2013-0046-EA Western Lithium Corporation Kings Valley Clay Mine (Report). March 2014. Retrieved January 13, 2019.
- "Kings Valley". United States Geological Survey.
- "Global lithium resources" (PDF). uchile.cl. 2012. Retrieved 2013-07-02.
- Bradley, Dwight C.; Stillings, Lisa L.; Jaskula, Brian W.; Munk, LeeAnn; McCauley, Andrew D. (2017). Lithium, Chapter K of Critical Mineral Resources of the United States—Economic and Environmental Geology and Prospects for Future Supply (PDF) (Report). United States Geological Survey.
- "Public Input Sought for Clay Mine". Reno Gazette-Journal. January 2, 2014.
- https://eplanning.blm.gov/public_projects/1503166/200352542/20030633/250036832/Thacker%20Pass_FEIS_Chapters1-6_508.pdf
- Fourie, Louis F.; Peldiak, Daniel (1 May 2018). "Independent Technical Report for the Thacker Pass Project, Humboldt County, Nevada, USA". U.S. Securities and Exchange Commission. Burnaby, BC: Advisian. Retrieved 24 January 2020.
- Ehsani, Reza; Fourie, Louis; Hutson, Andrew; Peldiak, Daniel; Spiering, Rob (1 August 2018). "Technical Report on the PreFeasibility Study for the Thacker Pass Project, Humboldt County, Nevada, USA" (pdf). Lithium Americas. Burnaby, BC: Advisian. Retrieved 24 January 2020.
- Cook, Michelle (10 October 2019). "$1.3 billion lithium mining project takes shape in rural Northern Nevada". The Humboldt Sun. Winnemucca, NV. Retrieved 3 May 2020.
- Cook, Michelle (31 January 2020). "$1.3 billion Lithium Nevada project on track for 2020 milestones". Nevada News Group. Retrieved 3 May 2020.
- https://www.blm.gov/press-release/humboldt-river-field-office-issues-record-decision-thacker-pass-lithium-mine
- https://www.protectthackerpass.org/join-the-blockade/