Vajont Dam

The Vajont Dam (or Vaiont Dam)[5] is a disused dam in northern Italy. It is one of the tallest dams in the world, with a height of 262 m (287 yards).[6] It is situated in the valley of the Vajont River under Monte Toc, in the municipality of Erto e Casso, 100 kilometres (54 nmi; 62 mi) north of Venice.

Vajont Dam
Vajont Dam 2002
Location of Vajont Dam in Italy
Official nameItalian: Diga del Vajont
LocationItaly
Coordinates46°16′02″N 12°19′44″E
Construction began1956[1]
Designed byCarlo Semenza
Owner(s)ENEL
Operator(s)SADE – Società Adriatica di Elettricità (today part of Edison)
Dam and spillways
Type of damarch dam
ImpoundsVajont River
Height262 metres (287 yd)
Length160 metres (170 yd) (chord)[1]
Width (crest)3.40 metres (3.72 yd; 11.2 ft).[2]
Width (base)27 metres (30 yd; 89 ft)
Reservoir
CreatesLago del Vajont
Total capacity168,715 thousand cubic metres (220,671×10^3 cu yd)
Power Station
Turbines4[3]
The Vajont Dam as seen from the village of Longarone in 2005, showing approximately the top 60–70 metres (66–77 yd) of concrete. The wall of water that overtopped the dam by 250 metres (270 yd)[1] and destroyed this village and all nearby villages on 9 October 1963 would have obscured virtually all of the blue sky in this photo.[4]

The dam was conceived in the 1920s and eventually built between 1957 and 1960 by Società Adriatica di Elettricità (SADE), at the time the electricity supply and distribution monopoly in northeastern Italy. In 1962 the dam was nationalized and came under the control of ENEL as part of the Italian Ministry for Public Works. The engineer was Carlo Semenza (1893–1961).

On 9 October 1963, during initial filling, a landslide caused a megatsunami in the lake in which 50 million cubic metres of water overtopped the dam in a wave of 250 metres (270 yd),[1] leading to the complete destruction of several villages and towns, and estimated between 1,900 and 2,500 deaths. Although the dam itself remained almost intact and two thirds of the water was retained behind it, the landslide was much larger than expected and the impact brought massive flooding and destruction to the Piave Valley below.

This event occurred after the company and the Italian government concealed reports and dismissed evidence that Monte Toc, on the southern side of the basin, was geologically unstable. They had disregarded numerous warnings, signs of danger, and negative appraisals, and the eventual attempts to safely control the landslide by lowering the lake's level came when the landslide was almost imminent.

Construction

The dam was built by SADE, the electricity supply and distribution monopoly in north-eastern Italy. The owner, Giuseppe Volpi di Misurata, had been Mussolini's Minister of Finances for several years. The 'tallest dam in the world', across the Vajont Gorge, was conceived in the 1920s to control and harness the Piave, Mae, and Boite rivers, and to meet the growing demand for power generation and industrialization. Not until the confusion after Mussolini's fall during World War II was the project authorized, on 15 October 1943.[7]

The dam wall had a volume of 360,000 m3 (470,000 cu yd) and held up to 168,715,000 m3 (220,671,000 cu yd) of water. The dam and basin were intended to be at the centre of a complex system of water management in which water would have been channeled from nearby valleys and artificial basins located at higher levels. Tens of kilometres of concrete pipes and pipe-bridges across valleys were planned.

In the 1950s, SADE's monopoly was confirmed by post-fascist governments, and it bought the land despite opposition by the communities of Erto and Casso in the valley, which was overcome with government and police support.[citation needed] SADE stated that the geology of the gorge had been studied, including analysis of ancient landslides, and that the mountain was believed to be sufficiently stable.

Construction work started in 1957, but by 1959 shifts and fractures were noticed while building a new road on the side of Monte Toc. This led to new studies in which three experts separately told SADE that the entire side of Monte Toc was unstable and would likely collapse into the basin if the filling were completed.[8] All three were ignored by SADE. Construction was completed in October 1959, and in February 1960, SADE was authorised to start filling the basin. In 1962 the dam was nationalized and came under the control of ENEL as part of the Italian Ministry for Public Works.

Early signs of disaster

On 22 March 1959, during construction of the Vajont Dam, a landslide at the nearby Pontesei Dam created a 20-metre-high (22 yd) wave that killed one person.[9]

Throughout the summer of 1960, minor landslides and earth movements were noticed. However, instead of heeding these warning signs, the Italian government chose to sue the handful of journalists reporting the problems for "undermining the social order".

On 4 November 1960, with the water level in the reservoir at about 190 metres (210 yd) of the planned 262 metres (287 yd), a landslide of about 800,000 m3 (1 million cu yd) collapsed into the lake. SADE stopped the filling, lowered the water level by about 50 metres (55 yd), and started to build an artificial gallery in the basin in front of Monte Toc to keep the basin usable even if additional landslides (which were expected) divided it into two parts.[10]

In October 1961, after the completion of the gallery, SADE resumed filling the narrow reservoir under controlled monitoring. In April and May 1962, with the basin water level at 215 metres (235 yd), the people of Erto and Casso reported five "grade five" Mercalli intensity scale earthquakes. SADE downplayed the importance of these quakes.[11] SADE was then authorized to fill the reservoir to the maximum level.

In July 1962, SADE's own engineers reported the results of model-based experiments on the effects of further landslides from Monte Toc into the lake. The tests indicated that a wave generated by a landslide could top the crest of the dam if the water level was 20 metres (66 ft) or less from the dam crest. It was therefore decided that a level 25 metres (27 yd) below the crest would prevent any displacement wave from over-topping the dam. However, a decision was made to fill the basin beyond that, because the engineers thought they could control the rate of the landslide by controlling the level of water in the reservoir.

In March 1963, the dam was transferred to the newly constituted government service for electricity, ENEL. During the following summer, with the basin almost completely filled, slides, shakes, and movements of the ground were continuously reported by the alarmed population. On 15 September, the entire side of the mountain slid by 22 centimetres (8.7 in). On 26 September, ENEL decided to slowly empty the basin to 240 metres (790 ft), but in early October the collapse of the mountain's south side looked unavoidable: in one day it moved almost 1 metre (3 ft).

The tests of the hydraulic model of the Vajont tank

The hydraulic model, during the first series of tests.

After the discovery of the landslide on the northern slopes of Monte Toc, it was decided to deepen the studies on the following effects:

  1. dynamic actions on the dam;
  2. wave effects in the reservoir and possible dangers for nearby locations, with particular attention to the town of Erto;
  3. Hypothesis of a partial breakage of the dam and consequent examination of the rout wave and its propagation along the last stretch of the Vajont and along the Piave, up to Soverzene and beyond.

The study of point 1 was performed at the I.S.M.E.S. (Experimental Institute for Models and Structures) of Bergamo, while for the others the SADE decided to build a physical-hydraulic model of the basin, in which to perform some experiments on the effects of a landslide fall in a reservoir.

The 1: 200 scale model of the basin, which can still be visited today, was set up at the SADE hydroelectric plant in Nove (loc. Borgo Botteon di Vittorio Veneto), and became the C.I.M. (Hydraulic Models Centre). The experiments were entrusted to professors Ghetti and Marzolo, university professors of the Institute of Hydraulics and Hydraulic Constructions of the University of Padua, and were carried out with funding of SADE, under the control of the study office of the company itself.

The study aimed to verify the hydraulic effects on the dam and on the banks of the landslide reservoir, and was therefore directed in this sense rather than reproducing the natural phenomenon of the landslide. The experiments were carried out in two different series (August-September 1961 and January-April 1962), of which the first served substantially to refine the model.

The first set of experiments

The first series of 5 experiments began on August 30, 1961 with a sliding surface of the flat landslide inclined by 30°, consisting of a wooden plank covered with a sheet. The sliding mass was simulated with gravel, held in place by flexible metal nets, which were initially held in position by ropes that were then suddenly released. At the beginning of September, another 4 tests were carried out intended for orientation purposes. The first always with a 30° inclined plane, the following 3 with a 42° inclined plane. Having found it impossible to reproduce the natural geological phenomenon of the landslide in the model, the model was elaborated by modifying the movement surface of the landslide, which was replaced with a masonry one (the relative profiles were elaborated by Semenza, who also used the surveys that had already been carried out and that had provided sufficient elements of judgment in this sense), to make it possible to vary the speed of the landslide fall into the reservoir (made difficult by the new "back" shape of the movement surface). To simulate the compactness of the moving material (which in the model remained the gravel) rigid sectors were inserted which were towed by ropes pulled by a tractor.

The second set of experiments

In these 17 experiments, conducted from January 3, 1962 to April 24, 1962, the "collapsing" material was still gravel, this time held in place by hemp nets and cords. Starting from the Muller hypothesis relating to the different characteristics of the mass moving between the downstream part of the Massalezza stream (west) and the upstream part of the same (east), all the experiments were performed by making those two hypothetical parts of the landslide descend separately. In the model, however, the two landslides were initially made to descend at different times, so that their effects were totally separate and, subsequently, when the wave produced by the first came back, so as to obtain a total increase in the water of the even greater lake.

The final Ghetti report

The total increase of the water in the tank (measured by means of special instruments) was broken down into "static increase", which was the non-transient effect of increasing the level of the water left in the tank after the landslide due to the immersion of the landslide in the tank (once the state of rest is reached again), and in "dynamic boost", due to the temporary wave motion produced by the landslide. The static boost depended on the volume of the landslide that remained immersed in the tank, while the dynamic boost depended almost exclusively on the speed of the landslide fall (while it was negligibly linked to the volume of the same).

Based on this simulation (following the disaster object of criticism, as considered approximate by some) it was determined that by placing a reservoir limit at an altitude of 700 metres (770 yd) there would be no damage above 730 metres (800 yd) a.s.l. along the banks of the reservoir, while a minimum quantity of water would have exceeded the edge of the dam (722.5 metres (790.1 yd)) causing negligible damage downstream of the same.

With the reported experiences, carried out on a 1:200 scale model of the Vajont lake-reservoir, we tried to provide an evaluation of the effects that will be caused by a landslide, which is possible to occur on the left bank upstream of the dam. . Given that the extreme limit downstream of the landslide is more than 75 m from the embankment of the dam, and that the formation of this embankment is of compact and consistent rock and well distinct, even geologically, from the aforementioned mass, it is absolutely not to be fear of any static perturbation to the dam with the occurrence of the landslide, and therefore only the effects of the wave rise in the lake and in the overflow on the dam crest as a consequence of the fall are to be considered.

INSTITUTE OF HYDRAULICS AND HYDRAULIC CONSTRUCTIONS OF THE UNIVERSITY OF PADUA MODEL CENTER "E. SCIMEMI"

EXAMINATION ON THE HYDRAULIC MODEL OF THE EFFECTS OF A POSSIBLE LANDSLIDE IN THE VAJONT LAKE TANK
[...] The forecasts on the modalities of the landslide event are very uncertain from a geological point of view. Partial falls of limited extent occurred in the last months of 1960 in the lower part of the moving bank in conjunction with the initial, and still partial, filling of the reservoir. The landslide formation extends over a total front of 1.8 kilometres (0.97 nmi; 1.1 mi), from an altitude of 600 metres (660 yd) to an altitude of 1,200 metres (1,300 yd) asl (maximum height of the reservoir lake-reservoir 722.50 metres (790.14 yd) a.s.l.). The geological examination leads to the recognition of a presumable conchoidal flow surface, on which the landslide mass, consisting mainly of incoherent material and groundwater debris, reaches a thickness of 200 metres (220 yd) in the central part (astride the shaft of the Massalezza stream). The slope of the slope is steeper in the lower part overlooking the lake; a collapse of this part would probably have been followed by the steepening of the upper mass. It is to be considered that any descent of the landslide is unlikely to occur simultaneously on the entire front; on the other hand, the hypothesis that one or the other of the two areas located upstream or downstream of the Massalezza stream will descend first, and that this steep slope will be followed, at a more or less short interval, by that of the remaining area. [...]
[...] These data seem sufficiently indicative of the extent that the wave phenomenon can present even in the most unfavorable forecasts of the fall of the landslide. It should be noted that the rise found near the dam is always higher than that which occurs in the more distant areas along the shores of the lake. Moving on to consider the effects of the landslide that occurs in the lake that is not completely encased, we have from the evidence that already with the reservoir brought to an altitude of 700 m s.l.m. the most unfavorable event, namely the fall of the valley area in 1 min. following a previous fall in the upstream area, it barely causes, with a 27 metres (30 yd) rise. Near the dam (and a maximum of 31 metres (34 yd) at 430 metres (470 yd) from it) an overflow just over 2,000 cubic metres (2,600 cu yd) / s. Starting from the reservoir altitude 670 metres (730 yd) a.s.l. even with the fastest landslide, the rise is very limited and well below the overflow ridge.
Therefore, it seems to be possible to conclude that, starting from the reservoir to the maximum flooded, the descent of the expected landslide mass only in catastrophic conditions, i.e. occurring in the exceptionally short time of 1-1.30 minutes, could produce an overflow point of the order of 30,000 cubic metres (39,000 cu yd) / s, and a wave rise of 27.5 metres (30.1 yd; 90 ft). As soon as this time is doubled, the phenomenon is attenuated below 14,000 cubic metres (18,000 cu yd) / s of overflow and 14 metres (15 yd; 46 ft) of elevation.
By decreasing the altitude of the initial reservoir, these overflow and overflow effects are rapidly reduced, and already the altitude of 700 metres (770 yd) a.s.l. can be considered absolutely certain with regard to even the most foreseeable catastrophic landslide event. [...]

:[...] It will in any case be opportune, in the foreseen continuation of the research, to examine on the suitably prolonged model the effects in the Vajont bed and at the confluence in the Piave of the passage of flood waves of an entity equal to that indicated above for possible dam. In this way there will be more certain indications on the possibility of allowing even greater reservoirs in the lake-reservoir, without danger of damage downstream of the dam in the event of a landslide [...]

Padua 3 July 1962
THE RESEARCH DIRECTOR
(Prof. Ing. Augusto Ghetti) [12]

Landslide and wave

Vajont Landslide
View of the village of Longarone, which was below the dam, showing the extent of the damage after the tidal wave had passed through
Native name Italian: Disastro del Vajont
DateOctober 9, 1963 (1963-10-09)
Time22:39 (CET)
Coordinates46°16′02″N 12°19′44″E
TypeDam failure
CauseUnderestimated speed and mass of landslide of Monte Toc
Casualties
1,900-2,500 fatalities (estimated)
Deaths1,917
Missing1,300
Property damage500,000,000,000 Lira (1963)
ChargesManslaughter and causing the disaster
TrialL'Aquila
The bell tower that remained standing at Longarone. The rest of the church building was swept away, as were almost all of the other structures in the village.

On 9 October 1963, engineers saw trees falling and rocks rolling down into the lake where the predicted landslide would take place. Before this, the alarming rate of movement of the landslide had not slowed as a result of lowering the water, although the water had been lowered to what SADE believed was a safe level to contain the displacement wave should a catastrophic landslide occur. With a major landslide now imminent, engineers gathered on top of the dam that evening to witness the tsunami.

At 10:39 pm, a massive landslide of about 260 million m3 (340 million cu yd) of forest, earth, and rock fell into the reservoir at up to 110 kilometres per hour (31 m/s; 59 kn; 68 mph) (another source gives 25 metres per second (90 km/h; 49 kn; 56 mph)[13]), completely filling the narrow reservoir behind the dam. The landslide was complete in just 45 seconds, much faster than predicted, and the resulting displacement of water caused 500 million m3 (650 million cu yd) of water to overtop the dam in a 250-metre-high (270 yd; 820 ft) wave.[1][4]

At 22:39 on 9 October 1963, however, on the flank of Italian: Monte Toc (note that the name of this mountain, in Friulian, is the abbreviation of "patoc", meaning "rotten", "soggy"), a landslide 2 km (1.1 nmi; 1.2 mi) long of over 270 million cubic metres (350×10^6 cu yd) of rocks and earth detached itself. In about 20 seconds the landslide reached the valley, generating a seismic shock and filling the artificial basin. [14]

Overview of the Vajont Valley shortly after the disaster of 9 October 1963. Note the 260 million cubic metres (340×10^6 cu yd) landslide which broke off from Monte Toc and fell into the artificial basin.

The impact with the water generated three waves: one went upwards, touched the houses of Casso, fell back on the landslide and went to dig the basin of the pond of Massalezza; another headed towards the shores of the lake and, through a washout action of the same, destroyed some localities in the municipality of Erto e Casso, and the third (about 50 million cubic metres (65×10^6 cu yd) of water) climbed over the edge of the dam, which remained intact except for the crowning path crossed by the ring road that led to the left side of the Vajont, and fell into the narrow valley below.

The approximately 25 million cubic metres (33×10^6 cu yd) of water that managed to climb over the work reached the stony shore of the Piave valley and removed substantial debris, which poured into the southern sector of Longarone causing the almost complete destruction of the town ( only the town hall and the houses north of it were saved) and other neighboring towns, and the death, overall, of about 2,000 people (official data speak of 1917 victims, but it is not possible to determine with certainty the number). It has been estimated that the shock wave due to the displacement of air was even double the intensity generated by the atomic bomb dropped on Hiroshima, thus half of the victims killed who were found outdoors were dismembered and pulverized, and nothing of them was found.[15]

The firefighters who departed from Belluno, after receiving reports about the raising of the level of the Piave, could not reach the place, since from a certain point onwards the road, coming from the valley, had been completely ripped off; Longarone was then reached by the firefighters who left Pieve di Cadore, who were the first to realize what had happened and be able to communicate it. At 5:30 on the morning of 10 October 1963, the first soldiers of the Italian Army arrived on the spot to bring relief and recover the dead. Among the soldiers involved there were above all Alpini, some of which belonged to the combat engineers, who also dug by hand to look for the bodies of the missing. These also found some safes of the banks of the country, no longer able to be opened with the normal keys as they were very damaged.[16] The Firefighters from 46 Provincial Commands also participated en masse in the rescue, with the use of 850 men, including divers, land and helicopter teams, and a large number of vehicles and equipment. The Nucleo Sommozzatori of Genoa, with 8 personnel, was used, in particular, in the basin in front of the Busche Dam, for dredging to search for bodies and drums of toxic substances (61 cyanide drums), with subsequent patrol by immersion and final removal of sludge when the basin is dry. Of the approximately 2,000 fatalities, only 1500 bodies have been summarily recovered and recomposed, half of which impossible to recognize. [14]

The flooding in the Piave Valley from the huge wave destroyed the villages of Longarone, Pirago, Rivalta, Villanova and Faè, killing around 2,000 people and turning the land below the dam into a flat plain of mud[17] with an impact crater 60 metres (66 yd) deep and 80 metres (87 yd) wide. Many small villages near the landslide along the lakefront also suffered damage from a giant displacement wave. Villages in the territory of Erto e Casso and the village of Codissago, near Castellavazzo, were largely wrecked.[18]

Estimates of the dead range from 1,900 to 2,500 people, and about 350 families lost all members. Most of the survivors had lost relatives and friends along with their homes and belongings.[19]

The dam was largely undamaged. The top 1 metre (3.3 ft) or so of masonry was washed away, but the basic structure remained intact and still exists today.

Causes and responsibility

Immediately after the disaster, the government (which at the time owned the dam), politicians and public authorities insisted on attributing the tragedy to an unexpected and unavoidable natural event.

The debate in the newspapers was heavily influenced by politics. The paper l'Unità, the mouthpiece of the Partito Comunista Italiano (PCI), was the first to denounce the actions of the management and government, as it had previously carried a number of articles by Tina Merlin addressing the behaviour of the SADE management in the Vajont project and elsewhere. Indro Montanelli, then the most influential Italian journalist and a vocal anti-communist, attacked l'Unità and denied any human responsibility; l'Unità and the PCI were dubbed "jackals, speculating on pain and on the dead" in many articles by the Domenica del Corriere and a national campaign poster paid for by Democrazia Cristiana, the party of prime minister Giovanni Leone. They attributed the catastrophe only to natural causes and God's will.[20]

The campaign accused the PCI of sending agitprops into the refugee communities, as relief personnel; most of them were partisans from Emilia Romagna who fought on Mount Toc in the Second World War and often had friends in the stricken area.[21]

Democrazia Cristiana accused the Communist Party of "political profiteering" from the tragedy. Leone promised to bring justice to the people killed in the disaster. A few months after he lost the premiership, he became the head of SADE's team of lawyers, who significantly reduced the amount of compensation for the survivors and ruled out payment for at least 600 victims.[22]

The Democrazia Cristiana's newspaper, La Discussione,[23] called the disaster "a mysterious act of God's love", in an article that drew sharp criticism from l'Unità.[24]

Apart from journalistic attacks and the attempted cover-up from news sources aligned with the government, there had been proven flaws in the geological assessments, and disregard of warnings about the likelihood of a disaster by SADE, ENEL and the government.

The trial was moved to L'Aquila, in Abruzzo, by the judges who heard the preliminary trial, thus preventing public participation, and resulted in lenient sentencing for a handful of the SADE and ENEL engineers. One SADE engineer (Mario Pancini) committed suicide in 1968. The government never sued SADE for damage compensation.

Subsequent engineering analysis has focused on the cause of the landslide, and there is ongoing debate about the contribution of rainfall, dam level changes and earthquakes as triggers of the landslide, as well as differing views about whether it was an old landslide that slipped further or a completely new one.[25]

There were a number of problems with the choice of site for the dam and reservoir: the canyon was steep sided, the river had undercut its banks, and the limestone and claystone rocks that made up the walls of the canyon were inter-bedded with the slippery clay-like Lias and Dogger Jurassic-period horizons and the Cretaceous-period Malm horizon, all of which were inclined towards the axis of the canyon. In addition, the limestone layers contained many solution caverns that became only more saturated because of rains in September.[26]

Prior to the landslide that caused the overtopping flood, the creep of the regolith had been 1.01 centimetres (0.40 in) per week. In September, this creep reached 25.4 centimetres (10 in) per day until finally, the day before the landslide, the creep was measured at 1 metre (3.3 ft).[26]

Reconstruction

The area of the 1963 landslide on Monte Toc, taken in 2005

Most of the survivors were moved into a newly built village, Vajont, 50 km (31 mi) south-east on the Tagliamento River plain. Those who insisted on returning to their mountain life in Erto e Casso were strongly discouraged. Longarone and other villages in the Piave Valley were rebuilt with modern houses and farms.

The government used the disaster to promote the industrialization of the north-east of Italy. Survivors were entitled to 'business start-up' loans, public subsidies and ten years tax exemption, all of which they could 'sell on' to major companies from the Venice region. These concessions were then converted into millions of lira for industrial plants elsewhere. Among the corporations were Zanussi (now owned by Electrolux), Ceramica Dolomite (now owned by American Standard), Confezioni SanRemo, and SAVIC (now owned by Italcementi).[27]

Compensation measures did not clearly differentiate between victims and people who lived nearby; thus much of the compensation went to people who had suffered little damage, creating a negative public image.

A pumping station was installed in the dam basin to keep the lake at a constant level, and the bypass gallery was lengthened beyond the dam to let the water flow down to the Piave Valley. The dam wall is still in place and maintained, but there are no plans to exploit it. The dry basin, filled with landslip, has been open to visitors since 2002.

The dam today and memorials

In recent years there has been a revival of interest both by researchers with specialist interest, and sightseers. The dam, now owned by ENEL, was partially opened to the public in 2002 with guided tours and access to the walkway along the top and other locations. In September 2006 an annual non-competitive track event, called "Paths of Remembrance", was inaugurated, which allows participants to access some locations inside the mountain.

On 12 February 2008, in launching the International Year of Planet Earth, UNESCO cited the Vajont Dam tragedy as one of five "cautionary tales" caused by "the failure of engineers and geologists".[28]

For 2013, on the occasion of the fiftieth anniversary of the disaster, the region of Venice set aside one million euros for safety works and recovery of tunnels inside the mountain which were part of the Colomber Road (the old national road 251).

The memorial church in Longarone—constructed over the strong opposition of the surviving parish priest—is a late masterpiece of the famous architect Giovanni Michelucci.

In the media

After the initial worldwide reporting,[29] the tragedy became regarded as part of the price of economic growth in the 1950s and 1960s.

Interest was rejuvenated by a 1997 television program by Marco Paolini and Gabriele Vacis, Il racconto del Vajont.

In 2001, a docudrama about the disaster was released. A joint production of Italian and French companies, it was titled Vajont—La diga del disonore ("Vajont—The Dam of Dishonour") in Italy, and La Folie des hommes ("The Madness of Men") in France. It stars Michel Serrault and Daniel Auteuil.

The tragedy was included in the 2008 documentary series Disasters of the Century.[30]

The TV show Seconds from Disaster featured the event in episode two, "Mountain Tsunami," of its fifth season in 2012.[3][31]

In 2013, the eleventh stage of the Giro d'Italia finished in Vajont to commemorate the fiftieth anniversary of the disaster.[32]

See also

References

  1. Petley, Dave (11 December 2008). "The Vaiont (Vajont) landslide of 1963". The Landslide Blog. Archived from the original on 14 January 2016. Retrieved 5 December 2019.
  2. "The Malpasset Dam Disaster – could the Var suffer again? – Riviera Reporter". www.rivierareporter.com. Retrieved 23 April 2018.
  3. "Seconds from Disaster, Schedule, Video, Photos, Facts and More – National Geographic Channel: Episode Guide – Series 5 – National Geographic Channel".
  4. "The Vajont Dam Disaster – TeLL-Net Kick-off Assembly Kobe Japan 19–20 January 2006" (PDF). 20 January 2006. Archived from the original (PDF) on 27 March 2009. Retrieved 5 December 2019.
  5. "Vaiont Dam photos and virtual field trip". University of Wisconsin. Retrieved 1 July 2009.
  6. "Capolavoro d'ingegneria nel posto sbagliato". La Repubblica. Retrieved 19 September 2014.
  7. 1 Verbale del voto n. 692 del Consiglio superiore dei lavori pubblici relativo all'esposto della Sade, del 10 novembre 1944, sulla derivazione delle acque (5 agosto 1946), p. 1, in Senate Archives (ASSR), Vajont (IV leg.), 6.1.
  8. T. Merlin, Sulla pelle viva, Cierre Edizioni, Verona, 1993, pp. 59 and 73.
  9. See:
    • "Release of 50,000,000 cubic metres (1.8×109 cu ft) of water at the Vajont Dam [on] 9 October 1963 [in] Erto e Casso (PN), Italy," French Ministry for Sustainable Development, November 2010, pp. 1–2. Available at: ARIA
    • Lago di Pontesei in Italian Wikipedia (in Italian)
  10. A. De Nardi, Il bacino del Vajont e la frana del M. Toc, 1965, p. 27.
  11. T. Merlin, ibidem, p. 102.
  12. Claudio Datei (2005). Vajont la storia idraulica (2 ed.). Padua: International bookshop Cortina. pp. 119–130.
  13. eng-resources.uncc.edu/failurecasestudies/dam-failure-cases/vaiont-dam/
  14. "Today the forty-fifth anniversary - Vajont, the wall of water that killed Longarone". La Stampa. 9 October 2008. Archived from the original on 30 September 2012. Retrieved 9 October 2010.
  15. "Quell'onda that swept two thousand lives". Messaggero Veneto. 2017. Archived from the original on 21 September 2019.
  16. Davide Pasquali (6 November 2011). "Vajont, the memory of the bolzanini-alpini: "Hands in the mud to free the bodies "". Alto Adige. Gruppo Editoriale L'Espresso SpA. Archived from the original on 26 April 2016. Retrieved 9 April 2016.
  17. "Vajont, il muro d'acqua che ha ucciso Longarone". La Stampa. 9 October 2008. Retrieved 29 October 2012.
  18. 3 Relazione statistica dell'Amministrazione provinciale di Udine sulla situazione dei nuclei familiari del comune di Erto e Casso (13 gennaio 1964), in Senate Archives (ASSR), Vajont (IV leg.), 9.3.
  19. 4 Longarone anno zero (1963), in Senate Archives (ASSR), Vajont (IV leg.), 7.4.
  20. "Mattolinimusic.com". Mattolinimusic.com. Retrieved 29 October 2012.
  21. "La rabbia e la speranza". Tinamerlin.it. Retrieved 29 October 2012.
  22. "Vajont, Due Volte Tragedia". Sopravvissutivajont.org. 9 October 2002. Retrieved 29 October 2012.
  23. La Discussione at Italian Wiki (temp ref)
  24. L'Unità, 24 October 1963
  25. David Petley. "Landslide information: The Vajont (Vaiont) Landslide, 2001". Land-man.net. Retrieved 1 January 2008.
  26. M. Dane Picard, Mountains and Minerals, Rivers and Rocks: A geologist's notes from the field, Pub. Chapman & Hall (1993)
  27. L. Vastano, Vajont, l'onda lunga, Salani Editore, Varese, 2008, pp. 80–3.
  28. "Five Cautionary Tales and Five Good News Stories". International Year of Planet Earth – Global Launch Event. Latest Science Web News-lswn.it. 11 February 2008. ISSN 1827-8922. Retrieved 1 January 2009.
  29. Towns wiped out in night of horror (Newsreel). MCA/Universal Pictures. 14 October 1963. National Archives Identifier 2050680. Retrieved 7 October 2013.
  30. History Television, Vajont Dam Collapse. Retrieved January 2008.
  31. "Mega Disasters – Mountain Tsunami". 7 June 2015.
  32. Cycling News, Giro d'Italia 2013 Stage 11

Bibliography

Video materials

Video on YouTube of 3D simulation of the wave generated by the Vajont rockslide.