The Brandon Shores Generating Station is an electric generating station located on Fort Smallwood Road north of Orchard Beach in Anne Arundel County, Maryland, near Glen Burnie, and is operated by Raven Power Holdings, Inc. Brandon Shores consists of two Babcock & Wilcox coal-fired boilers and two General Electric steam turbines with a combined nominal generating capacity of 1370 MWe.[1] Unit 1 went into operation in May 1984 and Unit 2 in May 1991.[2]

Brandon Shores Generating Station
Brandon Shores Generating Station viewed from the south
CountryUnited States
LocationAnne Arundel County, Maryland
Coordinates39°10′53″N 76°32′16″W
StatusOperational
Commission dateUnit 1: May, 1984
Unit 2: May, 1991
Owner(s)Talen Energy
Thermal power station
Primary fuelBituminous coal
Cooling sourceChesapeake Bay
Power generation
Units operational2
Nameplate capacity1370 MWe
External links
WebsiteBrandon Shores Plant
CommonsRelated media on Commons

The station shares a 483-acre (195 ha) site adjacent to the Patapsco River with the Herbert A. Wagner Generating Station. The Brandon Shores plant dominates the site with its 700-foot (210 m) exhaust and 400-foot (120 m) flue-gas desulfurization (FGD) system stacks. Talen Energy will convert the coal-fired units to alternative fuels by 2025.[3]

Coal delivery

The Brandon Shores and Wagner Generating Stations consume approximately 4.8 million tons of coal annually.[2] Coal for both stations is delivered by barge. Although there is a railroad spur into the site, it is unused and would require improvements to restore it to an operational state.

Environmental violations

Constellation Energy disposed fly ash from Brandon Shores at a former sand and gravel mine in Gambrills, Maryland during 1996 to 2007. The ash contaminated groundwater with heavy metals.[4] The Maryland Department of the Environment issued a fine of $1 million to Constellation. Nearby residents filed a lawsuit against Constellation and in 2008 the company settled the case for $54 million.[5][6]

Renovation

In order to meet Maryland requirements for reductions of nitrogen oxides, sulfur dioxide and mercury, the plant was substantially renovated between 2007 and 2010. A new 400 feet (120 m) twin FGD stack was built to replace the existing 700 feet (210 m) stacks, which have been capped and are inoperative. Flue gas from the boilers is routed through the emissions control system that sprays the exhaust with a limestone slurry and collects gypsum for use in wallboard and fly ash for use in concrete. The system uses treated municipal wastewater[7] from the Anne Arundel County Cox Creek wastewater treatment plant as the source of water for making the limestone slurry.[2]

2012 sale

The plant was originally constructed by a predecessor company of Constellation Energy, which was purchased by Exelon in 2012. On August 9, 2012, Exelon announced that it had reached an agreement for the sale of the Charles P. Crane, Brandon Shores, and Herbert A. Wagner Generating Stations to Raven Power Holdings LLC, a newly formed portfolio company of Riverstone Holdings LLC, for approximately $400 million.[8] Exelon had committed to divest the plants as condition for regulatory approval of its merger with Constellation Energy to alleviate concerns regarding potential market power in the regional wholesale electricity market. The sale was completed on November 30, 2012.

Scheduled closure

On November 10, 2020 Talen Energy (parent company of Raven Power) announced that it will stop burning coal at the Brandon Shores and Wagner plants by the end of 2025. The plants will be converted to use alternative fuel sources.[3]

Dispatch of electricity

The electrical output of Brandon Shores Generating Station is dispatched by the PJM Interconnection regional transmission organization.

See also

References

  1. "Existing Electric Generating Units in the United States, 2006" (Excel). Energy Information Administration, U.S. Department of Energy. 2006. Retrieved 2008-07-14.
  2. "Environmental Review of Proposed Air Pollution Control Project at Brandon Shores" (PDF). Maryland Department of Natural Resources. February 5, 2007. Archived from the original (pdf) on March 7, 2013. Retrieved 2008-12-30.
  3. Pacella, Rachael (2020-11-11). "Owner of Brandon Shores and Wagner power plants in Pasadena will stop burning coal by end of 2025". The Baltimore Sun.
  4. Johnson, Jeffrey W. (2009-02-23). "The Foul Side Of 'Clean Coal'". Chemical & Engineering News. Vol. 87 no. 8. Washington, DC: American Chemical Society.
  5. Wheeler, Tim (2009-09-07). "Coal Ash Dump in City Fought". The Baltimore Sun.
  6. Cho, Hanah (2008-11-01). "Constellation, Gambrills residents settle fly-ash suit". The Baltimore Sun.
  7. Peltier, Robert (2010-10-01). "Top Plant: Brandon Shores Generating Station, Pasadena, Maryland". Power Magazine. Vol. 154 no. 10. pp. 30–32. ISSN 0032-5929.
  8. "Exelon Agrees to Sell Three Maryland Coal Plants to Raven Power Holdings LLC" (Press release). Exelon. Aug 9, 2012. Retrieved 2012-08-13.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.