Bullcroft Colliery was a coal mine situated by the village of Carcroft north of Doncaster. The Bullcroft Colliery Company was formed in April 1908 and sinking of the shafts commenced immediately. In January 1909, at a depth of 100 feet (30 m), a water course yielding over 1,000 US gallons (3,800 L) per minute was struck, it was capped back and sinking continued but only a month later, at 180 feet (55 m), another water course, big enough to be described as a "subterranean river", was struck - too much for the steam operated pumps to cope with. Electric pumps were brought in to cope with the flow but even with a capability of 6,250 US gallons (23,700 L) per minute they couldn't cope and sinking was stopped so the full situation could be assessed.[2]

Bullcroft Colliery
Trackbed of the former Bullcroft Colliery branch line near Toll Bar
Location
Bullcroft Colliery
LocationCarcroft
CountySouth Yorkshire
CountryEngland
Coordinates53.581932°N 1.186288°W / 53.581932; -1.186288
Production
ProductsCoal
Production700,000 tonnes (770,000 tons)
Financial year19301931[1]
History
Opened1908 (coaling began in 1911)
Closed1970 (1970)
Owner
CompanyBullcroft Main Colliery Ltd
Doncaster Amalgamated Collieries Ltd
British Coal

It was decided to withdraw the pumps and freeze the ground. Commencing January 1910 the first freeze was unsuccessful and a second, after the shafts had iron "tubbing" installed, commenced in February 1911. This was successful, and sinking recommenced finally reaching the coal measures in December 1911 at 657 yards (601 m) below the surface.[3]

Before the colliery company arrived, the nearby settlement of Carcroft consisted of only 50 houses. By 1910, an additional 400 houses had been erected to cope with the influx of miners and their families.[2]

Between 1908 and 1940 the company traded as Bullcroft Main Colliery Ltd. It merged with five other collieries (Brodsworth, Hickleton, Markham Main and Yorkshire Main) in 1940 to form the Doncaster Amalgamated Collieries Ltd. In 1947, the enterprise was nationalised into British Coal.[4][5]

The colliery worked normally until 1968 when it was joined to Brodsworth Colliery by a 550-yard (500 m) drift and a 1,800-yard (1,600 m) long conveyor made it possible that Bullcroft coal could be brought up at Brodsworth for washing etc.

The collieries officially merged in 1970, with the final shift clocking off on 25 September of that year.[1] As the last remaining seam could be reached via the Brodsworth Colliery, the Bullcroft shafts were filled, using spoil from pit heaps and capped. Bullcroft Colliery kept its landsale depot to deal with concessionary coal and retained a locomotive to work it for about a year afterwards.

The colliery was served by a branch off the Hull and Barnsley and Great Central Joint Railway and a connection to the West Riding and Grimsby Railway.[6]

The colliery had its own football team, which competed in the FA Cup on numerous occasions.

The 76 acres (31 ha) of land[7] that the colliery occupied above ground is now used as a community parkland. There was a proposal in 2013 to sift the spoil for usable coal.[8] However, the price of coal fell soon afterwards and the plan was abandoned. The local community want the area to be landscaped and the spoil tip removed as has happened at other neighbouring collieries such as Askern, Bentley and Brodsworth.[9]

Accidents

  • 13 January 1937 - Kenneth Oliver, 14, was killed in accident whilst he was uncoupling tubs from the internal conveyor system. Oliver was under adult supervision, but his death lead to questions being raised in Parliament about boys working in mines.[10]
  • 19 October 1941 - six men died whilst trying to deal with problems within the mine. An ignition of gas just after 3:00 am caused an explosion and killed the men outright. They were about 430 feet (130 m) distant from the shaft bottom and all, bar one, had been members of the mine rescue team.[11]

References

  1. Tuffrey, Peter (9 October 2018). "Bully For the Boys". The Yorkshire Post. Picture Past. p. 11. ISSN 0963-1496.
  2. Tuffrey, Peter (9 October 2018). "Bully For the Boys". The Yorkshire Post. Picture Past. p. 10. ISSN 0963-1496.
  3. "How coal was discovered underground despite war, delays and disappointments". The Sheffield Star. 7 July 2011. Archived from the original on 10 October 2018. Retrieved 9 October 2018.
  4. "Bullcroft Main Collieries Ltd". www.dmm.org.uk. Retrieved 9 October 2018.
  5. "Doncaster Amalgamated Collieries Ltd". www.dmm.org.uk. Retrieved 9 October 2018.
  6. "Bullcroft Main Colliery - Northern Mine Research Society". nmrs.org.uk. Retrieved 9 October 2018.
  7. "Closed pit may be worked again". The Yorkshire Post. 10 January 2007. ProQuest 335421201.
  8. "Colliery waste 'could be mined'". BBC News. 31 October 2013. Retrieved 9 October 2018.
  9. Kessen, David (21 May 2018). "'It's been 50 years - now sort out our Doncaster village's old slag heap'". Doncaster Free Press. Retrieved 9 October 2018.
  10. "Bullcroft Colliery, Doncaster: Accident". api.parliament.uk. Retrieved 9 October 2018.
  11. "Rescue Workers Lose Their Lives". dmm.org.uk. Retrieved 9 October 2018.
  • Colliery Company records. (NCB Archives)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.