Ftelia railway station
Feres railway station (Greek: Σιδηροδρομικός Σταθμός Διλόφου, romanized: Sidirodromikós stathmós Ftelia) is a railway station situated halfway between Dikaia and Ormenio that serves the nearby village of Ptelea, Evros, in Eastern Macedonia and Thrace, Greece. Located 2.3 kilometres (1.4 mi) north of the center of Ptelea, the station opened by the Chemins de fer Orientaux, (now part of OSE). Today TrainOSE operates just 4 daily Regional trains[2] to Alexandroupoli. The station is unstaffed[3] however there are waiting rooms available. It is one of the northernmost operational railway station in Greece and 500m from the boulder with Bulgaria. The station is the last stop before arriving at Ormenio.[4]
| |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Ptelea Evros Greece | ||||||||||
Coordinates | 41°43′03″N 26°15′13″E | ||||||||||
Owned by | OSE | ||||||||||
Line(s) | Alexandroupoli–Svilengrad railway[1] | ||||||||||
Platforms | 2 | ||||||||||
Tracks | 2 | ||||||||||
Train operators | TrainOSE | ||||||||||
Construction | |||||||||||
Structure type | at-grade | ||||||||||
Platform levels | 1 | ||||||||||
Parking | No | ||||||||||
Bicycle facilities | No | ||||||||||
Disabled access | |||||||||||
Other information | |||||||||||
Status | Unstaffed | ||||||||||
Website | http://www.ose.gr/en/ | ||||||||||
Electrified | No | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Ftelia Location within Greece |
History
The station lies on the line, built by the Chemins de fer Orientaux (CO), from Istanbul to Vienna. The railway reached Ftelia in 1873, when the line from Istanbul to Edirne and Bulgaria was opened.[5] When the railway was built it was all within the Ottoman Empire.
During World War I the railway was an important link as the Ottoman Empire, Bulgaria and Austria-Hungary were all Central Allies. Following the defeat of the Ottoman Empire, its remaining imperial possessions were divided. The sections from Alexandroupoli to Svilengrad, except for a short section of about 10 kilometres (6.2 mi)[6] in Turkey serving Edirne Karaagaç station and for 3 kilometres (1.9 mi) between the Greek border and Svilengrad station in Bulgaria[7] come under the control of the French-Hellenic Railway Company (CFFH), a subsidiary of the CO, when the CFFH was incorporated in July 1929.
Under the Treaty of Lausanne of 1923, a new border between Greece and Turkey was established at the Evros river, just east of Ftelia railway station, which had the result that the railway from Istanbul to Bulgaria entered Greece at Pythio, then re-entered Turkey at Edirne (Karaağaç railway station), re-entered Greece at Marasia, and finally entered Bulgaria between Ormenio and Svilengrad. This arrangement continued until 1971, when two new lines were opened. In Turkey, the Edirne Cut-off was opened to allow trains from Istanbul to Bulgaria to run through Edirne entirely on Turkish territory, so that trains such as the Orient Express no longer passed through Feres. In Greece, a line was opened to allow trains from Pythio to Bulgaria to stay on Greek territory and avoid Edirne. In 1954 the CFFH was absorbed by the Hellenic State Railways. In 1971, the Hellenic State Railways was reorganised into the OSE [8] taking over responsibilities for most for Greece’s rail infrastructure.
In the 1990s, OSE introduced the InterCity service to the Alexandroupoli–Svilengrad line[9] Which reduced travel times across the whole line.
In 2020 it was announced that section of line between Pythio and Ormenio was to be upgraded, at a cost of €1.4 million as part of an ambitious integrated intergovernmental transport plan which will see this, and 39 other transport sector projects be built, with financing from the European Commission with a total of €117 million.[10] The package of measures aims to build or improve transport connections and connectivity across Europe, with a focus on sustainable transport. The project for the Pythian-Ormenio section envisions upgrading the existing line infrastructure and trackbed, doubling of the track as well as the installation of electrification signalling (ETCS Level 1) along the entire stretch, with the aim of improving freight transport with Bulgaria and Turkey.[11]
Facilities
The station building has recently been repainted, however, the waiting rooms are barely more than brick shelters and the station remains little more than an unstaffed halt, with no facilities.
Services
As of 2020, the station is only served by two daily pairs of regional trains Alexandroupoli–Ormenio.[12] There are currently no services to Svilengrad.
line layout
L Ground/Concourse |
Exits | |
Level Ε1 |
||
Platform 1 | Intercity towards Ormenio ← | |
Platform 2 | Intercity towards Alexandroupoli (Dikaia) → |
References
- "OSE - 2017 Network Statement Annexes".
- https://tickets.trainose.gr/dromologia/
- https://www.evros-news.gr/2017/05/12/πύθιο-παρατημένος-καταστρέφεται-ο-πρ/
- Δ. Μυρτσίδης (20 Ιουνίου 2012). "Το σιδηροδρομικό δίκτυο του Έβρου". Σιδηροδρομικά Νέα. Retrieved 2016-03-30. Check date values in:
|date=
(help) - "Trains of Turkey website". Archived from the original on 2016-03-31. Retrieved 2020-01-03.
- Modern measurement done on www.Openstreetmap.com indicate 10.2 km
- Le Journal des chemins de fer, des mines et des TP, Paris, 29 March 1930 (in French)
- Law 674/1971, Government Gazette A-192/1970
- https://www.radioevros.gr/epeidi-ta-traina-einai-gemata-anthrwpous-kai-istories-kai-oxi-mono-eisitiria-kai-arithmous/
- "Αναβαθμίζεται η σιδηροδρομική γραμμή Ορμενίου - Πυθίου". v4.deltatv.gr. Retrieved 5 January 2020.
- "Upgrading of Ormenio – Alexandroupoli / Frontier with Bulgaria – ΕΡΓΟΣΕ". ergose.gr. Retrieved 5 January 2020.
- "Search schedule Ormenio - Dikaia". TrainOSE. Retrieved 26 June 2020.