Göttingen station

Göttingen railway station, known in German as Bahnhof Göttingen, is an InterCityExpress stop on Germany's domestic long-distance rail network and the only passenger station of the city of Göttingen. Built in 1854 as the terminus of the Hanoverian Southern Railway, the station lies west of the medieval town centre. The station today has four platform islands each with two through tracks. In addition there is a through track for goods traffic between the station building and the platforms.

Göttingen
Through station
Station building and station forecourt
LocationBahnhofsplatz 1, Göttingen, Lower Saxony
Germany
Coordinates51°32′12″N 9°55′37″E
Owned byDeutsche Bahn
Operated byDB Station&Service
Line(s)
Platforms8
Construction
ArchitectConrad Wilhelm Hase
Architectural styleHannoverian Rundbogenstil
Other information
Station code2218
DS100 codeHG
IBNR8000128
Category2[1]
Websitewww.bahnhof.de
History
Opened1854 (1854)
Services
Preceding station   DB Fernverkehr   Following station
ICE 12
ICE 13
ICE 20
towards Basel SBB
ICE 22
towards Stuttgart
ICE 25
via Hannover - Fulda - Würzburg - Nürnberg
towards Munich
ICE 26
towards Karlsruhe
Preceding station   Cantus Verkehrsgesellschaft   Following station
TerminusRB 7
Bebra–Fulda railway
Frederick William Northern Railway
Friedland
toward Fulda
Friedland
toward Kassel Hbf
RB 8Terminus
Preceding station   DB Regio Nord   Following station
Nörten-Hardenberg
toward Nordhausen
RB 80Terminus
Nörtheim
toward Bad Harzburg
RB 82Terminus
Preceding station   DB Regio Südost   Following station
TerminusRE 1
via Mühlhausen - Erfurt - Jena - Gera
Preceding station   Metronom   Following station
Nörten-Hardenberg
toward Uelzen
RE 2Terminus
Preceding station   NordWestBahn   Following station
toward Ottbergen
RB 85
Oberweser-Bahn
Terminus
Location
Göttingen
Location within Lower Saxony
Göttingen
Location within Europe
Göttingen
Göttingen (Europe)
Aerial view

History

As part of the planning for the construction of the Hanoverian Southern Railway, the municipal council of the city of Göttingen decided in 1851 to request for the construction of a station west of its centre. During the followed three years there were sometimes heated discussions among citizens and in particular the affected landowners,[2] until the groundbreaking ceremony in 1853. The planning was undertaken by Adolph Funk, Conrad Wilhelm Hase and Julius Rasch and construction was managed by Emil Hackländer. The design of the station followed the example of the Hannover Central Station (Central-Bahnhof) completed in 1847 in the Hanoverian Rundbogenstil ("round-arch" style) in natural stone. Operations commenced with carnival-like opening celebrations on 31 July 1854.[2]

The section of the Hanoverian Southern Railway between Alfeld–and Göttingen was opened in 1854. It was extended to Kassel over the former Dransfeld ramp (Dransfelder rampe) in 1856. The Bebra–Göttingen railway was built from Göttingen to Friedland in 1867. The line was extended to Bebra in 1875 and 1876, creating a connection to Kassel via Eichenberg. The station building in Göttingen was built between 1856 and 1887 and rebuilt several times. The station forecourt was rebuilt at the beginning of the 20th century. In the summer palms were now placed in front of the station; these shaped the image of the station until the Second World War.

The station facilities were rebuilt again from was about 1910 until the 1920s. In particular, the tracks were raised south of the station (which in the southern section involved the relocation of the line to Eichenberg) and the building of an underpass for Groner Chaussee (now Groner Landstrasse), as the railway crossing was congested by the increasing traffic and it has also been decided to build a tram line. The entrance building was rebuilt and given extensions. In the course of this rebuilding, the Garte Valley Railway (Gartetalbahn), a 750mm narrow gauge railway to Duderstadt that had previously ended at the station, was cut back to run to end at its own station about 400 metres further south; this line was closed in 1959.

View from the forecourt

The station was largely destroyed by bombing during the Second World War. The station and the station hall were rebuilt in the postwar period in a simplified form with a redesigned facade. Göttingen was connected to the electrified rail network in 1963. In the 1960s, the station forecourt was rebuilt again and aligned for the requirements of motor traffic. The buses that previously stopped almost directly in front of the station have since operated from a central bus station to the south of the station building and a car parking area was built in front of the station. The first railway to Kassel, the section of the Hanoverian Southern Railway that ran via Dransfeld, was closed in May 1980.

During the construction of the high-speed line a western entrance was built.
Plastic moulded head of a young man; detail on the facade of the station building
Information panel for renovation: "Completion: 31 December 2010"
photo from September 2011

During the construction of the Hanover–Würzburg high-speed railway between 1984 and 1989, the station was extensively remodelled. It was extended to the west to a new platform serving tracks 10 and 11, the previous platform C (serving tracks 8 and 9) was demolished and rebuilt in the style of the new platform adjacent. Several buildings of the former workshop were demolished to build a new western entrance, including a passenger train servicing facility, which was re-erected elsewhere.[3] The 400 m long platform C went into operation at the winter 1988/89 timetable change.[4]

In 1981, it had been planned that the new line would have three tracks through the station area: apart from the two main tracks of the new line (the southern edge of platform C and the northern edge of platform D) it would have a track overtaking passenger trains (the southern edge of platform D).[5] The original platform C was only used by services running to Bodenfelde.

The first plans for the new line in Lower Saxony, submitted in 1971, provided for a route though the Weser Uplands via Holzminden. After protests in the state and various studies and reports, the current route via Göttingen was adopted in 1976.[6] The first of the two platforms for the new line was completed in September 1987.[7] A total of 4.0 km of the tracks were adapted in the western part of the station area. The station area was a separate zoning section of the new line (no. 3.8 from km 98.750 to 101.000). The regional planning process in this area was completed on 30 September 1977.[8]

Trains can run on the tracks of the new lines through the station at up to 120 km/h,[5] the subsequent curve past the marshalling yard can be run at 200 km/h. The cruising speed through the station was chosen because all the passenger trains would stop in Göttingen anyway and this speed was considered sufficient for freight trains.[8]

With a total of 172 scheduled long-distance services arrivals and departures per day, the station held 18th place in the Deutsche Bundesbahn network in the timetable for summer 1989.[9]

The station forecourt was rebuilt in the 1990s. On the street outside the station there is a bus station along with a pergola. To accommodate the growing number of parked bicycles, a bicycle parking station was opened next to the station building. Nevertheless, the forecourt is still crammed with bikes.

The station was renovated in three stages for Expo 2000 in Hanover in the late 1990s. First began the extension of the subway tunnel in the area of the old platforms A and B (tracks 4/5 and 6/7) and the provision of additional space for retail in this tunnel. The old platforms were also redeveloped, with the focus on the entrance area with a partially glazed roof. The newly built platform lifts were boarded up for months due to the lack of a Federal Railway Authority (Eisenbahn-Bundesamt) approval. In the third phase of the rebuilding, the part of the station building next to the tracks were rebuilt with toilets and luggage lockers. Simultaneously, the three through tracks between the station building and platform A were reduced to one track.

The extensive renovation work was completed at the end of 2006 in the last phase, which included the complete renovation of the station entrance hall. The new shopping area was occupied by, among other things, a branch of a fast-food chain. The €13.8 million renovation was completed in late March 2007.[10]

As part of the economic stimulus program, the entrance building was renovated to reduce energy use by DB Station&Service in 2010/2011.[11] In the autumn of 2012, the bicycle parking facilities were completely renewed and considerably expanded.[12] It is still planned to renew the dynamic passenger information systems to improve the quality of information on city buses and regional trains.[13]

Train services

View from the new platform C of the lower platform B and A
Cycles in the station forecourt

The station is served by the following services in the 2019 timetable.[14]

Long-distance services

LineRouteInterval
ICE 11 Hamburg-Altona Hannover Göttingen Fulda Frankfurt Stuttgart MunichIndividual services at night
ICE 11 Berlin Magdeburg Braunschweig Göttingen Kassel-Wilhelmshöhe Würzburg MunichOne train per week night
ICE 12 Berlin Ostbahnhof – Braunschweig Göttingen – Kassel-Wilhelmshöhe – Frankfurt – Mannheim Freiburg Basel (– Bern Interlaken Ost)Every two hours
ICE 13 Berlin Ostbahnhof Braunschweig Göttingen Kassel-Wilhelmshöhe Frankfurt Süd Frankfurt AirportEvery two hours
ICE 20 (Kiel –) Hamburg – Hannover Göttingen – Kassel-Wilhelmshöhe – Frankfurt – Mannheim – Karlsruhe – Freiburg – Basel Zürich (– Chur)Every two hours
ICE 22 (Kiel –) Hamburg – Hannover Göttingen – Kassel-Wilhelmshöhe – Frankfurt Frankfurt Airport Mannheim – (Heidelberg –) StuttgartEvery two hours
ICE 25 (Lübeck –) Hamburg – / Bremen – Hannover Göttingen – Kassel-Wilhelmshöhe Fulda Würzburg Nuremberg Ingolstadt / Augsburg – München (– Garmisch-Partenkirchen)Hourly
ICE 26 (Binz –) Stralsund Rostock – Hamburg – Hannover Göttingen – Kassel-Wilhelmshöhe Gießen – Frankfurt – Heidelberg – KarlsruheEvery two hours
ICE 91 Hamburg – Hannover Göttingen – Kassel-Wilhelmshöhe – Fulda – Würzburg – Nürnberg Regensburg Plattling Passau Wels Linz St. Pölten ViennaOne train pair
IC 26 Westerland – Hamburg – Hannover Göttingen – Kassel-Wilhelmshöhe – Fulda – Würzburg – Augsburg Oberstdorf / BerchtesgadenIndividual services

Regional services

LineOperatorRouteIntervalRailway
RE 1 (TH) DB Regio Göttingen Leinefelde Gotha Erfurt Jena Gera Gößnitz Glauchau (Sachs)/Elsterberg Every two hours Göttingen–Bebra railway
RE 2 Metronom Eisenbahngesellschaft Göttingen Northeim Kreiensen  Alfeld (Leine) Elze – Hannover (– Celle Uelzen) Hourly Hanoverian Southern Railway
RB 7 (HE) Cantus Verkehrsgesellschaft Göttingen Eichenberg Eschwege – Bebra Hourly Göttingen–Bebra railway
RB 8 (HE) Cantus Verkehrsgesellschaft Göttingen Eichenberg Witzenhausen Hannoversch Münden – Kassel Hourly Halle–Hann. Münden railway
RB 80 DB Regio Göttingen Nörten-Hardenberg Northeim  Katlenburg Wulften Hattorf Herzberg – Barbis Bad Sachsa Walkenried Ellrich Niedersachswerfen – Nordhausen Every two hours South Harz Railway
RB 82 DB Regio Göttingen – Nörten-Hardenberg – Northeim – Kreiensen Seesen – Langelsheim Goslar Bad Harzburg Every two hours
RB 85 NordWestBahn Göttingen Lenglern Adelebsen Bodenfelde Bad Karlshafen Lauenförde – Ottbergen Paderborn Hourly Göttingen–Bodenfelde railway
RB 86 DB Regio Göttingen – Nörten-Hardenberg – Northeim Einbeck-Salzderhelden – Einbeck Mitte Individual services Ilme Railway

Locomotive shed

On the opposite side of the station, this historical industrial monument now accommodates a large multiplex cinema and multipurpose hall for conferences and events with 5,400 m ² of meeting space and 3,000 m ² of lobby area. A locomotive overhaul centre was set up here in 1855. The continuation of the route from Hannoversch Munden over the Dransfelder Incline required stronger locomotives for the steep gradients: these were stored and repaired in the Göttingen works. The buildings of the locomotive depot date from 1917. After 1976 the works were closed, the area lay vacant for two decades and although listed in 1981 by the Niedersächsische Institut für Baudenkmalpflege at first no profitable re-use was adopted. In 1993 plans for re-use led to the multiplex cinema opening in the northern part of the plant in 1996, the meeting hall in the southern end opened in December 1998.

Gartetalbahn

Between 1897 and 1959 somewhat southeast of Göttingen Station was a station of 750 mm narrow-gauge railway, the Gartetalbahn to Rittmarshausen and Duderstadt.

Notes

  1. "Stationspreisliste 2021" [Station price list 2021] (PDF) (in German). DB Station&Service. 16 November 2020. Retrieved 3 December 2020.
  2. Peter Schurmann (2002). Ernst Böhme (ed.). Göttingen – Geschichte einer Universitätsstadt (in German). 2. Vandenhoeck & Ruprecht. p. 130. ISBN 3-525-36197-1.
  3. Hans-Joachim Gnest; Peter Leiste. "Neubaustrecke Hannover–Würzburg: Inbetriebnahme zwischen Nörten-Hardenberg und Göttingen". Die Bundesbahn (in German). 10 (Yearbook 1990): 941–944.
  4. "Jahresrückblick 1988". Die Bundesbahn (in German). 65 (1): 61. 1989. ISSN 0007-5876.
  5. Norbert Klein; Peter Leiste (1981). "Stand der Planungs- und Bauarbeiten im Abschnitt Edesheim–Göttingen der Neubaustrecke Hannover–Würzburg". Die Bundesbahn (in German). 57 (10): 789–794. ISSN 0007-5876.
  6. Walter Engels; Peter Nußberger; Helmut Weber (1987). "Planung und Realisierung der Neubaustrecke Hannover–Würzburg". In Knut Reimers; Wilhelm Linkerhägner (eds.). Wege in die Zukunft. Neubau- und Ausbaustrecken der DB (in German). Darmstadt: Hestra Verlag. pp. 97–104. ISBN 3-7771-0200-8.
  7. Projektgruppe der NBS Hannover der Bahnbauzentrale (ed.). Neubaustrecke Hannover–Würzburg: Der Abschnitt Northeim – Göttingen (in German). Deutsche Bundesbahn. pp. 30 f. (Brochure, 44 A4 pages with status of May 1988)
  8. Projektgruppe Hannover–Würzburg (Nord), ed. (c. 1979). Neubaustrecke Hannover–Würzburg: Göttingen (in German). Hannover: Deutsche Bundesbahn. (folding card, 12 pages, A6)
  9. Ralph Seidel (2005). Der Einfluss veränderter Rahmenbedingungen auf Netzgestalt und Frequenzen im Schienenpersonenfernverkehr Deutschlands. Dissertation of the University of Leipzig (in German). Leipzig. p. 46.
  10. "Bahnhof Göttingen nach Umbau feierlich eröffnet" (in German). www.bahnfahren.info. Retrieved 10 April 2014.
  11. Information on the rehabilitation (German)
  12. "Orion bietet Platz für 1600 Fahrräder". Göttinger Tageblatt (in German). 30 July 2012.
  13. Ulrich Schubert (21 August 2013). Verlagsgesellschaft Madsack GmbH; Co. KG (eds.). "Göttingen hat "Bahnhof des Jahres 2013" - Das sagt die Jury". Göttinger Tageblatt (in German).
  14. Timetables for Göttingen station

References

  • Jens-Uwe Brinkmann (1998). Auf Schienen durch die Zeit. Der Göttinger Bahnhof von der Hannoverschen Südbahn bis zum Ende des Dampfzeitalters (in German). Göttingen. ISBN 3-929181-42-8.
  • Günther Siedbürger (1995). "Die Lokhalle und ihre Eisenbahner -Uwe Brinkmann". Auf Schienen durch die Zeit. Der Göttinger Bahnhof von der Hannoverschen Südbahn bis zum Ende des Dampfzeitalters (in German). Göttingen. ISBN 3-926920-14-9.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.