Gemini 2

Gemini 2 (Gemini-Titan 2; GT-2)[2] was the second spaceflight of the American human spaceflight program Project Gemini, and was launched and recovered on January 19, 1965. Gemini 2, like Gemini 1, was an uncrewed mission intended as a test flight of the Gemini spacecraft. Unlike Gemini 1, which was placed into orbit, Gemini 2 made a suborbital flight, primarily intended to test the spacecraft's heat shield. It was launched on a Titan II GLV rocket. The spacecraft used for the Gemini 2 mission was later refurbished into the Gemini B configuration, and was subsequently launched on another suborbital flight, along with OPS 0855, as a test for the US Air Force Manned Orbital Laboratory. Gemini spacecraft no. 2 was the first craft to make more than one spaceflight since the X-15, and the only one until Space Shuttle Columbia flew its second mission in 1981.

Gemini 2
The atmospheric re-entry of Gemini 2 viewed through a pilot's window
Mission typeTest flight
OperatorNASA[1]
Mission duration18 minutes, 16 seconds
Range3,422.4 kilometers (1,847.9 nmi)
Apogee171.1 kilometers (92.4 nmi)
Spacecraft properties
SpacecraftGemini SC2
ManufacturerMcDonnell
Start of mission
Launch dateJanuary 19, 1965, 14:03:59.861 (1965-01-19UTC14:03:59Z) UTC
RocketTitan II GLV, s/n 62-12557
Launch siteCape Kennedy LC-19
End of mission
Recovered byUSS Lake Champlain
Landing dateJanuary 19, 1965, 14:22:14 (1965-01-19UTC14:22:15Z) UTC
Landing site16°36′N 49°46′W
 

Mission history

GLV

The Titan II/Gemini launch vehicle was dismantled to protect it from two hurricanes in August and September 1964. The second stage of the vehicle was taken down and stored in a hangar on August 26, 1964 in preparation for Hurricane Cleo, and the entire launch vehicle was subsequently dismantled and removed from Cape Kennedy Air Force Station's Launch Complex 19 in early September before Hurricane Dora passed over Cape Kennedy on September 9. The Gemini launch vehicle was erected for the final time on 12 September 1964.

The prime and backup crews for Gemini 3, John Young (suited), Wally Schirra, Thomas P. Stafford (in shirtsleeves), and Gus Grissom (suited), practice egress from the Gemini 2 pad, in preparation for the upcoming Gemini 3 flight

Many ground tests were carried out on the Gemini 2 and Titan rocket in November 1964. On November 24, Gemini-Titan (GT) 2 successfully completed the Wet Mock Simulated Launch, a full-scale countdown exercise which included propellant loading. Procedures for flight crew suiting and spacecraft ingress and egress were practiced during simulated launch. The prime flight crew for Gemini 3 donned pressure suits and full biomedical instrumentation, assisted by their backup crew and the space suit bioinstrumentation and aeromedical personnel who would participate in the GT-3 launch operation. As a result of this practice operation, it was established that all physical examinations, bioinstrumentation sensor attachment, and suit donning would be done in the pilot ready room at Launch Complex 16.

Gemini 2 had been scheduled for launch on December 9, 1964. On that date, the countdown reached zero and the first stage engines were ignited. The launch vehicle's Malfunction Detection System detected technical problems due to a loss of hydraulic pressure and shut down the engines about one second after ignition.

On the second launch attempt on January 19, 1965, Gemini 2 lifted off from Launch Complex 19 at Cape Kennedy at 9:03:59 a.m. EST (14:03:59.861 UTC).

Shortly after launch the Mission Control Center suffered a power outage. Control of the mission was transferred to a tracking ship. The outage was later traced to an overload of the electrical system from the network television equipment used to cover the launch.[3]

Gemini 2 flew a ballistic suborbital arc over the Atlantic Ocean reaching a maximum altitude of 92.4 nautical miles (171.1 km). The spacecraft was run by an onboard automatic sequencer. At 6 minutes 54 seconds after launch, retrorockets were fired. The spacecraft landed 1,847.9 nautical miles (3,422 km) downrange from the launch pad. The flight lasted 18 minutes 16 seconds. The landing was 14 nautical miles (26 km) short of the planned impact point, and 45 nautical miles (83 km) from the recovery aircraft carrier, USS Lake Champlain. The spacecraft was brought aboard the carrier at 15:52 UT (10:52 a.m. EST). Most goals were achieved, except the fuel cells had failed before liftoff and were turned off. The spacecraft cooling system temperature also was found to be too high. The Gemini 2 spacecraft was in excellent condition. Its heat shield and retrorockets functioned as expected. The Gemini 2 mission was supported by 6,562 United States Department of Defense personnel, 67 aircraft, and 16 ships.

Gemini 2 had flight instrumentation pallets installed in the crew cabin, similar to those in Gemini 1.

MOL

The Gemini 2 reentry module was refurbished and flown again on November 3, 1966 in a test flight for the United States Air Force Manned Orbiting Laboratory program. It was launched on a Titan IIIC rocket on a 33-minute suborbital flight from LC-40 at Cape Kennedy. It is the only Gemini spacecraft to have flown with U.S. Air Force insignia, but there is an unflown Gemini B spacecraft in USAF markings on display at the National Museum of the United States Air Force at Wright-Patterson Air Force Base in Dayton, Ohio.

See also

References

 This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.

  1. Hacker, Barton C.; Grimwood, James M. (February 2003) [First published 1977]. "Table of Contents". On the Shoulders of Titans: A History of Project Gemini. NASA History Division, Office of Policy and Plans. NASA History Series. Washington, D.C.: NASA. NASA SP-4203. Retrieved September 12, 2013.
  2. "Gemini 2". NASA Space Science Data Coordinated Archive (NSSDCA). NASA. 2017. GEMINI2.
  3. Chris Kraft, Flight, p. 206.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.