Gulou Dajie station

Gulou Dajie Station[1] (simplified Chinese: 鼓楼大街站; traditional Chinese: 鼓樓大街站; pinyin: Gǔlóudàjiē Zhàn; lit. 'Gulou Street') is a station on Line 2 and Line 8 of the Beijing Subway.[2] The connection to line 8 opened on December 30, 2012.[3]

Gulou Dajie

鼓楼大街
Line 8 concourse
LocationXicheng District / Dongcheng District border, Beijing
China
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
Disabled accessYes
Other information
Station code217 (line 2)
History
OpenedSeptember 20, 1984 (line 2)
December 30, 2012 (line 8)
Services
Preceding station   Beijing Subway   Following station
outer loop / anticlockwise
Line 2
inner loop / clockwise
towards Zhuxinzhuang
Line 8 (North section)
Location
Gulou Dajie
Location in central Beijing

Station Layout

Both the line 2 and 8 stations have underground island platforms.

Exits

There are 6 exits, lettered A1, A2, B, E, F, and G. Exit B is accessible.

References

  1. https://www.bjsubway.com/jpg.html
  2. 鼓楼大街站 (in Chinese). Beijing Municipal Government. Retrieved 29 April 2012.
  3. 北京四地铁线30日开通 首末车时间确定 (in Chinese). 新京报. Retrieved 26 December 2012.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.