Khan Khwar Hydropower Plant

Khan Khwar Hydropower Plant is a run-of-the-river project located near the town of Besham in Shangla District on the Khan Khwar River, a right bank tributary of Indus River in Khyber Pakhtunkhwa Province, Pakistan. It is approximately 265 km from the federal capital of Islamabad and 350 km from provincial capital of Peshawar in the Islamic Republic of Pakistan.[1][2]

Khan Khwar Hydropower Plant
Location of Khan Khwar Hydropower Plant in Pakistan
Official nameKhan Khwar Hydropower Plant
LocationBesham, Shangla, Pakistan
Coordinates34°54′19.21″N 072°48′41.55″E
StatusOperational
Construction beganApril 2003 (completed in April 2012)
Opening date14 July 2012
Owner(s)Water and Power Development Authority (WAPDA)
Dam and spillways
Type of damRCC
ImpoundsKhan Khwar River
Height46 m (151 ft)
Length112 m (367 ft)
Power Station
Turbines2 x 34 MW (46,000 hp) Francis-type, 1 x 4 MW (5,400 hp)
Installed capacity72 MW (97,000 hp)
Annual generation595 million units (GWh)

The total electricity generation capacity of the Khan Khwar Project is 72 megawatts (97,000 hp).[3] There are two vertical Francis turbine units of 34 MW each and one unit of 4 MW installed at Khan Khwar Hydroelectric Station with the average annual generation capacity of 595 million units (GWh) of cheap electricity.[4] These turbines are manufactured by Dongfang Electric Machinery Co. Ltd.[5] This project is completed by the technical assistance of Chinese corporations (Sinohydro Corporation via a consortium with China Water Resources Beifang Investigation, Design and Research Co. Ltd).

Construction of Khan Khwar Hydropower Plant was commenced in April 2003 and the project was completed in April 2012. Power House is in commercial operation since November 2010. The project was officially inaugurated on 14 July 2012 by Prime Minister of Pakistan Raja Pervez Ashraf. The total cost of the project is about PKR 10.73 billion out of which PKR 5.049 billion is accounted for foreign exchange component.[6]

Dam:
Type: RCC
Length: 112 m.
Height: 46 m.
Design Discharge: 29 Cusecs
Design Head: 244 m.

See also

References

  1. "The News International: Latest News Breaking, Pakistan News".
  2. "Archived copy". Archived from the original on 2013-09-22. Retrieved 2013-11-05.CS1 maint: archived copy as title (link)
  3. "Archived copy" (PDF). Archived from the original (PDF) on 2012-08-07. Retrieved 2013-11-05.CS1 maint: archived copy as title (link)
  4. "Archived copy". Archived from the original on 2014-07-22. Retrieved 2014-08-27.CS1 maint: archived copy as title (link)
  5. http://iopscience.iop.org/1755-1315/15/6/062062/pdf/1755-1315_15_6_062062.pdf
  6. http://www.aaj.tv/2012/07/72-mw-khan-khwar-hydro-power-project-inaugurated-by-pm/
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.