Lentor MRT station

Lentor MRT station is a future underground Mass Rapid Transit (MRT) station on the Thomson–East Coast line (TEL) in the Ang Mo Kio planning area, Singapore. It will be located underneath Lentor Drive, next to its junction with Yio Chu Kang Road and Ang Mo Kio Avenue 4.

 TE5 
Lentor
伦多
லென்ட்டோர்
Lentor
Mass Rapid Transit (MRT) station
A station entrance nearing completion
Location1 Lentor Drive
Singapore 789361[1]
Coordinates1°23′05″N 103°50′12″E
Owned byLand Transport Authority
Operated bySMRT Trains Ltd (SMRT Corporation)
Line(s)
PlatformsIsland
Construction
Structure typeUnderground
Disabled accessYes
History
Opening2021 (2021)
Previous namesLentor Green, Teacher's Estate[2][3]
Services
Preceding station   Mass Rapid Transit   Following station
Thomson–East Coast Line
Future service
towards Caldecott
Location
Lentor
Lentor station in Singapore

The station is in the vicinity of the Lentor residential estate, consisting mostly of low-rise private homes, as well as condominiums such as Far Horizon Gardens, Seasons Park, Castle Green, Thomson Grove and The Calrose. West of the station, more residential developments are being planned.

History

The station was first announced on 29 August 2012 as part of the Thomson line (TSL).[4] On 15 August 2014, the Land Transport Authority (LTA) announced that the station had been named Lentor and that it would be part of the proposed Thomson–East Coast line (TEL). The station will be constructed as part of Phase 2, consisting of 6 stations between Springleaf and Caldecott, and is expected to be completed in 2021.[5][6][7]

Contract T209 for the design and construction of Lentor station and associated tunnels was awarded to China Railway No. 5 Engineering Group Co. Ltd (Singapore Branch) at a sum of S$247 million (US$197.6 million) in October 2013. Construction started on 6 September 2014, with expected completion in 2021.[8][7] On 27 June 2014, the station was officially named Lentor following a public poll in May 2013.[3] The station was constructed using the top-down method to minimise impact to the surrounding residences and high-rise developments. An extensive survey was made to pinpoint the network of utility services at the construction site to safeguard against disruptions affecting the estates.[9]

A fatal accident happened in the early morning of 1 March 2018 that led to the death of a 48-year-old construction worker. The worker fell from a raised working platform 2.5 metres (8.2 ft) above the ground while working in a tunnel leading to the station.[10] The accident happened at 3.35 am, and the man was announced dead by paramedics at 4.30 am. Prior to the incident, four other workers were dismantling components of a tunnel boring machine after finishing tunnelling works.[10] A component of the TBM, a man-lock chamber, was being lowered using chain blocks. However, it abruptly swung and struck the platform that the worker was standing on.[10][11][12]

Initially expected to open at the end of 2020, the restrictions on the construction due to the COVID-19 pandemic has led to delays in the TEL line completion, and the date was pushed to 2021.[13] On 14 December 2020, it was further announced that TEL Stage 2 opening will be delayed to the third quarter of 2021 so as to review the rail system software for the line.[14][15][16][17]

Station details

Location

The station is located underneath Lentor Drive near the junction with Yio Chu Kang Road.[18][19] Lentor station will serve the surrounding residential areas of Lentor Estate and Teacher’s Estate.[9]

References

  1. "Lentor (TE5) - (MRT Station) - 1 Lentor Drive (S)789361". streetdirectory.com. 17 December 2020. Archived from the original on 17 December 2020. Retrieved 17 December 2020.
  2. "LTA | News Room | News Releases | Public Poll for Thomson Line Station Names". www.lta.gov.sg. Archived from the original on 25 April 2020. Retrieved 25 April 2020.
  3. "LTA | News Room | News Releases | Thomson Line Station Names Finalised". www.lta.gov.sg. Archived from the original on 6 January 2020. Retrieved 25 April 2020.
  4. "Connect - September 2012" (PDF). www.lta.gov.sg. Archived from the original (PDF) on 5 February 2018.
  5. "Joint News Release by the Land Transport Authority & Singapore Land Authority - Thomson-East Coast Line: New MRT Links in the East | Press Room | Land Transport Authority". 19 August 2014. Archived from the original on 19 August 2014. Retrieved 13 February 2020.
  6. "LTA | Upcoming Projects | Rail Expansion | Thomson-East Coast Line". 13 February 2020. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
  7. "Second stage of Thomson-East Coast Line to open early 2021 after delays due to COVID-19: Ong Ye Kung". CNA. 4 September 2020. Archived from the original on 13 September 2020. Retrieved 4 September 2020.
  8. "LTA Awards Four Contracts for Thomson Line". www.lta.gov.sg. 18 October 2013. Archived from the original on 7 January 2020. Retrieved 7 January 2020.
  9. "News Room - news-releases - Factsheet: Progress Update on Thomson-East Coast Line Stage 2". LTA. 17 January 2020. Retrieved 19 December 2020.
  10. Lim, Adrian (2 March 2018). "Worker killed in Lentor MRT worksite accident". The Straits Times. Archived from the original on 17 December 2020. Retrieved 17 December 2020.
  11. "Construction worker killed in accident at Lentor MRT station worksite". CNA. 1 March 2018. Archived from the original on 17 December 2020. Retrieved 17 December 2020.
  12. "News Room - News Releases - LTA Media Statement: Incident at Thomson-East Coast Line (TEL) Lentor Station Worksite". www.lta.gov.sg. 1 March 2018. Archived from the original on 17 December 2020. Retrieved 17 December 2020.
  13. "Second stage of Thomson-East Coast Line to open early 2021 after delays due to COVID-19: Ong Ye Kung". CNA. 4 September 2020. Archived from the original on 13 September 2020. Retrieved 4 September 2020.
  14. Ho, Grace (14 December 2020). "Stage 2 of Thomson-East Coast Line to be delayed by another six months to Q3 2021: LTA". The Straits Times. Archived from the original on 17 December 2020. Retrieved 14 December 2020.
  15. 思敏, 李 (14 December 2020). "多项地铁及南北交通廊道工程延误长达一年" [Construction of multiple MRT projects and the North South Corridor to be delayed by up to a year]. 早报 (in Chinese). Archived from the original on 17 December 2020. Retrieved 14 December 2020.
  16. "Stage 2 of Thomson-East Coast Line to be delayed by another six months". The Business Times. 14 December 2020. Archived from the original on 17 December 2020. Retrieved 17 December 2020.
  17. "Second stage of Thomson-East Coast Line further delayed to third quarter next year". CNA. 14 December 2020. Archived from the original on 17 December 2020. Retrieved 17 December 2020.
  18. "Lentor MRT Station (TE5)". Google Maps. Retrieved 19 December 2020.
  19. "Upcoming Projects - Rail Expansion - Thomson-East Coast Line". LTA. 31 January 2020. Retrieved 19 December 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.