Line 3 (Jinan Metro)
Jinan Metro Line 3 (Chinese: 济南地铁3号线; pinyin: Jǐnán Dìtiě Sān Hào Xiàn) is a rapid transit line in Jinan, China. The line use six-car Type B rolling stock. The line is 21.592 kilometres (13.417 miles) long. It is completely underground.
Line 3 | |
---|---|
Overview | |
Other name(s) | R3[1] (construction name) |
Status | operating |
Locale | Jinan |
Termini | Longdong Tantou (Phase 1) |
Stations | 13 (12 operational)[lower-alpha 1] |
Service | |
Type | rapid transit |
System | Jinan Metro |
Rolling stock | 6-car Type B |
History | |
Opened | 28 December 2019[2] |
Technical | |
Line length | 21.592 km (13.4 mi) |
Character | underground |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Operating speed | 100 km/h (62 mph) |
Line 3 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
It was opened on 28 December 2019.[2]
Timeline
Segment | Opened | Length | Station(s) | Name |
---|---|---|---|---|
Longdong — Tantou | 28 December 2019[2] | 21.592 km (13.4 mi) | 12[lower-alpha 1] | Phase 1 |
Stations
Station Name | Connections | Distance km | |||||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
Longdong | 龙洞 | ||||||
Mengjiazhuang | 孟家庄 | ||||||
Longao Building | 龙奥大厦 | ||||||
Olympic Center | 奥体中心 | ||||||
Ligenglu | 礼耕路 | ||||||
Dingjiazhuang | 丁家庄 | ||||||
Huayuandonglu | 花园东路 | ||||||
Bajianpu | 八涧堡 | 2 (under construction) | |||||
Zhangmatun | 张马屯 | ||||||
Wangsheren | 王舍人 | ||||||
Peijiaying | 裴家营 | ||||||
Jinandong Railway Station | 济南东站 | MDK | |||||
Tantou | 滩头 | ||||||
Notes
- There are 13 stations in Phase 1 of Line 3. Peijiaying station is not open.
References
- "济南市城市轨道交通第二期建设规划社会稳定风险评估公众参与公示". 2019-05-21.
- "定了!济南地铁3号线12月28日正式通车".
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.