Line S1 (Suzhou Rail Transit)
Line S1 of Suzhou Rail Transit is an under construction intercity rapid transit line. Running west-east, the line will mainly serve Kunshan city center and connect it to Suzhou Industrial Park in the west and nearby metropolitan Shanghai in the east via a transfer to Line 11 of the Shanghai Metro.[1] The line will be the first metro line in downtown Kunshan.[3] The terminus Huaqiao station will be an interchange metro station between Suzhou Rail Transit system and Shanghai metro system. The line started construction on November 27, 2018 and is scheduled to be completed by 2023.[5] The line will use 6-car Type B rolling stock operating up to 100km/h.[6]
Line S1 | |
---|---|
S1 | |
Overview | |
Status | Under construction |
Owner | Suzhou Rail Transit Co., Ltd |
Termini | Weiting Huaqiao |
Stations | 28[1] |
Service | |
Type | Rapid transit |
System | Suzhou Rail Transit |
Operator(s) | Suzhou Rail Transit Co., Ltd |
Rolling stock | 6-car Type B[2] |
Technical | |
Line length | 41.27 kilometres (25.64 mi) |
Number of tracks | 2 |
Character | Underground[3][4] |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | overhead wire |
Stations
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Weiting | 唯亭 | 3 | 0.00 | 0.00 | SIP | |
Yangchenghu South[lower-alpha 1] | 阳澄湖南[lower-alpha 1] | |||||
Yujia Denghuo | 渔家灯火 | Kunshan | ||||
CR Yangchenghu Station | 城铁阳澄湖站 | Yangchenghu | ||||
Lianhu Park | 莲湖公园 | |||||
Zuchongzhi Lu | 祖冲之路 | |||||
Cultural and Art Center | 文化艺术中心 | |||||
Hongqi Lu | 虹祺路 | |||||
Lucheng Lu | 鹿城路 | |||||
Baimajing Lu | 白马泾路 | |||||
Yushan Square | 玉山广场 | |||||
Zhujiang Lu | 珠江路 | |||||
Heilongjiang Lu | 黑龙江路 | |||||
Qingyang Zhonglu | 青阳中路 | |||||
Shunfan Lu | 顺帆路 | |||||
Jinshajiang Lu | 金沙江路 | |||||
Dongtinghu Lu | 洞庭湖路 | |||||
Shidai Tower | 时代大厦 | |||||
Jinrong Jie | 金融街 | |||||
Kunjia Lu | 昆嘉路 | |||||
Honghu Lu | 洪湖路 | |||||
CR Huaqiao Station | 城铁花桥站 | Huaqiao | ||||
Guangxia Lu | 光夏路 | |||||
Lujia | 陆家 | |||||
Exhibition Center | 展览中心 | |||||
Xihuan Lu | 西环路 | |||||
Huaxi Park | 花溪公园 | |||||
Huaqiao | 花桥 | 11 (Shanghai Metro) | ||||
- The station is not the same station as another Yangchenghu South station on Line 5.
References
- "苏州地铁s1号线最新消息(站点+线路图+开通时间)". Retrieved 28 September 2018.
- "S1线首座车站主体围护结构完工". 2019-05-22. Retrieved 2019-06-16.
- "国家发展改革委关于苏州市城市轨道交通第三期 建设规划(2018~2023年)的批复". Retrieved 28 September 2018.
- "上海至苏州第二条跨省地铁完成选址,两地直达只需1小时". Retrieved 15 November 2018.
- 新华报业网 (2018-11-27). "苏州轨道交通6号线、S1线开工,2024年将建成9条线". news.sina.com.cn. Retrieved 2019-03-19.
- "S1线首座车站主体围护结构完工". 2019-05-22. Retrieved 2019-06-16.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.