Line S1 (Suzhou Rail Transit)

Line S1 of Suzhou Rail Transit is an under construction intercity rapid transit line. Running west-east, the line will mainly serve Kunshan city center and connect it to Suzhou Industrial Park in the west and nearby metropolitan Shanghai in the east via a transfer to Line 11 of the Shanghai Metro.[1] The line will be the first metro line in downtown Kunshan.[3] The terminus Huaqiao station will be an interchange metro station between Suzhou Rail Transit system and Shanghai metro system. The line started construction on November 27, 2018 and is scheduled to be completed by 2023.[5] The line will use 6-car Type B rolling stock operating up to 100km/h.[6]

Line S1
 S1 
Overview
StatusUnder construction
OwnerSuzhou Rail Transit Co., Ltd
TerminiWeiting
Huaqiao
Stations28[1]
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
Rolling stock6-car Type B[2]
Technical
Line length41.27 kilometres (25.64 mi)
Number of tracks2
CharacterUnderground[3][4]
Track gauge1,435 mm (4 ft 8 12 in)
Electrificationoverhead wire

Stations

Station name Connections Distance
km
Location
English Chinese
Weiting 唯亭  3  0.00 0.00 SIP
Yangchenghu South[lower-alpha 1] 阳澄湖南[lower-alpha 1]
Yujia Denghuo 渔家灯火 Kunshan
CR Yangchenghu Station 城铁阳澄湖站 Yangchenghu
Lianhu Park 莲湖公园
Zuchongzhi Lu 祖冲之路
Cultural and Art Center 文化艺术中心
Hongqi Lu 虹祺路
Lucheng Lu 鹿城路
Baimajing Lu 白马泾路
Yushan Square 玉山广场
Zhujiang Lu 珠江路
Heilongjiang Lu 黑龙江路
Qingyang Zhonglu 青阳中路
Shunfan Lu 顺帆路
Jinshajiang Lu 金沙江路
Dongtinghu Lu 洞庭湖路
Shidai Tower 时代大厦
Jinrong Jie 金融街
Kunjia Lu 昆嘉路
Honghu Lu 洪湖路
CR Huaqiao Station 城铁花桥站 Huaqiao
Guangxia Lu 光夏路
Lujia 陆家
Exhibition Center 展览中心
Xihuan Lu 西环路
Huaxi Park 花溪公园
Huaqiao 花桥  11  (Shanghai Metro)
  1. The station is not the same station as another Yangchenghu South station on Line 5.

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.