Manchester Metrolink

Manchester Metrolink (branded locally simply as Metrolink)[note 1] is a tram/light rail system in Greater Manchester, England.[8] The network has 99 stops along 65 miles (105 km) of standard-gauge track,[9] making it the most extensive light rail system in the United Kingdom.[10] Metrolink is owned by Transport for Greater Manchester (TfGM) and operated and maintained under contract by a Keolis/Amey consortium.[11][12] In 2019/20, 44.3 million passenger journeys were made on the system.[13]

Metrolink
Schematic map of Metrolink
Overview
OwnerTransport for Greater Manchester
LocaleGreater Manchester
Transit typeTram/Light rail
Number of lines8
Number of stations99
Annual ridership44.3 million (2019/20)
1.4%
Chief executiveDanny Vaughan (TfGM's Metrolink Director)
HeadquartersMetrolink Trafford Depot
Warwick Road South
Stretford
Manchester
M16 0GZ
Websitetfgm.com
Operation
Began operation6 April 1992 (1992-04-06)
Operator(s)KeolisAmey Metrolink Ltd.
Number of vehicles122 Bombardier M5000s (25 more on order)
Train length28.4 metres (93 ft)
Technical
System length63 miles (101 km)
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Minimum radius of curvature25 m (82 ft)
ElectrificationOverhead line (750 V DC)
Top speed50 miles per hour (80 km/h)

The network consists of eight lines which radiate from Manchester city centre to termini at Altrincham, Ashton-under-Lyne, Bury, East Didsbury, Eccles, Manchester Airport, Rochdale and Trafford Centre. It consists of a mixture of on-street track shared with other traffic; reserved track sections, segregated from other traffic, and converted former railway lines.[14] It is operated by a fleet of Bombardier M5000s.

A light rail system for Greater Manchester emerged from the failure of the 1970s Picc-Vic tunnel scheme to obtain central government funding. A light-rail scheme was proposed in 1982 as the least expensive rail-based transport solution for Manchester city centre and the surrounding Greater Manchester metropolitan area. Government approval was granted in 1988, and the network began operating services between Bury Interchange and Victoria on 6 April 1992, becoming the United Kingdom's first modern street-running rail system; the 1885-built Blackpool tramway being the only first-generation tram system in the UK that had survived up to Metrolink's creation.[15]

Expansion of Metrolink has been a critical strategy of transport planners in Greater Manchester, who have overseen its development in successive projects, known as Phases 1, 2, 3a and 3b with the most recent phase, 2CC becoming operational in February 2017.[16][17] The Trafford Park Line extension from Pomona to the Trafford Centre opened in March 2020.[18][19] Furthermore, TfGM has endorsed more speculative expansion proposals for new lines to Stockport, a loop around Wythenshawe, and the addition of tram-train technology.

History

Predecessors

Manchester's first tram age began in 1877 with the first horse-drawn trams of Manchester Suburban Tramways Company. Electric traction was introduced in 1901, and the municipal Manchester Corporation Tramways expanded across the city. By 1930, Manchester's tram network had grown to 163 route miles (262 km), making it the third-largest tram system in the United Kingdom. After World War II, electric trolleybuses and motor buses began to be favoured by local authorities as a cheaper transport alternative, and by 1949 the last Manchester tram line was closed. Trolleybuses were withdrawn from service in 1966.[20]

Origins

A 1910 map of Manchester's railways

Greater Manchester's railway network historically suffered from poor north–south connections because Manchester's main railway stations, Piccadilly and Victoria,[1][21] were built in the 1840s on peripheral locations outside Manchester city centre.[22][21] The central commercial district had no rail links, and over the years, several unsuccessful schemes were proposed to connect Manchester's rail termini.[23] In the 1960s, transport design studies were undertaken to address the problems of increasing traffic congestion.[24] Many urban public transport schemes were evaluated for Manchester, including several types of monorail systems[25] and metro-style systems.[26][24]

While the monorail schemes were all abandoned, a scheme to create a tunnel link gained momentum. The SELNEC Passenger Transport Executive — the body formed in 1969 to improve public transport for Manchester and its surrounding municipalities – promoted the 'Picc-Vic tunnel' project. The project was a proposal to link Piccadilly and Victoria stations via a tunnel under the city centre and enable train services to run across the Manchester conurbation.[27][28] Greater Manchester County Council (GMC) inherited the project and presented it to the United Kingdom Government in 1974,[29] but the council failed to secure the necessary funding,[30] and the project was abandoned in 1977.[31][32] The Centreline shuttle bus service provided inter-station links for many years.

The Greater Manchester Passenger Transport Executive (GMPTE), the successor to SELNEC, continued to examine possible rail link solutions. Light rail emerged in the early 1980s as a cost-effective option that could make use of existing railway lines and run through the city centre at street level, eliminating the need for costly tunnelling works.[31] A Rail Study Group, composed of officials from British Rail, GMC and GMPTE formally endorsed the Project Light Rail scheme in 1984.[22] Initial abstract proposals, based on light rail systems in North America and continental Europe,[33] illustrated a draft 62-mile (100 km) network consisting of three lines: AltrinchamHadfield/Glossop, BuryMarple/Rose Hill and RochdaleEast Didsbury. To promote the scheme, GMPTE held a public proof of concept demonstration in March 1987 using a Docklands Light Railway P86 train on a freight-only line adjacent to Debdale Park.[34] The Project Light Rail proposals were presented to the UK Government for taxpayer funding;[27] following route revisions in 1984 and 1987,[27][35] Project Light Rail was approved. Because of the central government's constraints on financial support for innovative transport projects, funding was granted by HM Treasury with the strict condition that the system is constructed in phases.[27] Additional taxpayer funding came from the European Regional Development Fund and bank lending.[36]

Construction

Parliamentary authority to proceed with Phase 1 construction was obtained with two Acts of Parliament – the Greater Manchester (Light Rapid Transit System) Act 1988 and Greater Manchester (Light Rapid Transit System) (No. 2) Act 1988.[37]

Phase 1: Bury, Altrincham and Manchester city centre

Phase 1 construction of the core section of the network near Manchester Piccadilly, 1991

Beginning in July 1991, the first Phase of Metrolink involved the conversion of two suburban heavy rail lines to light rail operation — the Bury-Victoria line in the north and the Altrincham-Piccadilly line in the south — and the construction of a street-level tramway through the city centre to connect the two.[38] Tracks were laid down along a 1.9-mile (3.1 km) route from Victoria station, via Market Street to the G-Mex, with a 0.4-mile (0.64 km) branch to Piccadilly station.[39][40][41] This route is now known as the First City Crossing (1CC), and it was built with network expansion in mind.[42]

A fleet of 26 AnsaldoBreda T-68 light rail vehicles was procured to operate the 19.2-mile (30.9 km) network.[43] Construction was carried out by the GMA Group (a consortium of AMEC, GM Buses, John Mowlem & Company, and GEC),[44] costing £145 million (equivalent to £302 million in 2019).[45][36]

Metrolink was initially scheduled to open in September 1991, but services did not begin until 1992, when the Bury Line opened as far as Victoria on 6 April.[46][47] The first street-level trams began running on 27 April between Victoria and G-Mex (now Deansgate-Castlefield), the Altrincham line opened on 15 June, and the branch to Piccadilly station opened on 20 July.[47] Metrolink was officially opened by Queen Elizabeth II on 17 July 1992.[48][47][49]

Phase 2: Salford Quays, Eccles

A (now retired) T-68A tram on the Eccles line, opened in 1999–2000 during Phase 2

In Phase 2 the Metrolink network was extended westwards to Eccles along the new 4-mile (6.4 km) Eccles Line, as part of the 1990s urban regeneration of Salford Quays,[50] increasing the total Metrolink route length to 24 miles (39 km).[51] The extension cost £160 million (equivalent to £271 million in 2019)[45][36] and was funded by the GMPTA, the ERDF and private developers.[36][52] It was constructed 1997–99 by Altram (a consortium of Serco, Ansaldo and John Laing) and six new AnsaldoBreda T-68A trams were bought to operate services.[36][52][14] The line was inaugurated by Prime Minister Tony Blair on 6 December 1999[53] and officially opened by Princess Anne on 9 January 2001.[54]

Phase 3

Phase 3 included the re-opening of the disused railway line through Didsbury

The Phase 3 extension project, nicknamed the "Big Bang", was promoted by GMPTE and the Association of Greater Manchester Authorities (AGMA) in the early 2000s.[55] The project, costing £489,000,000 (equivalent to £829 million in 2019),[45] would create four new lines: the Oldham and Rochdale Line, the East Manchester Line, the South Manchester Line and the Airport Line.[56] Phase 3 was put in doubt when central government funding was withdrawn due to increasing costs,[57][55][58] but after negotiations with the Department for Transport, Phase 3 was split into two parts, 3a and 3b, to secure investment.[59][60][61] Phase 3b was delayed after a failed bid to raise funding through the Greater Manchester Transport Innovation Fund and a proposed traffic congestion charge in 2008. GMPTE and AGMA instead funded Phase 3b through a combination of council tax, government grants, Metrolink fares and contributions from the Manchester Airports Group and other bodies. The new 0.25-mile (0.40 km) spur off the Eccles Line to MediaCityUK was funded separately by the Northwest Regional Development Agency.[38][61][14][62] As part of Phase 3, the original blue T-68 trams were also phased out and replaced with a new fleet of Bombardier M5000 trams, which entered service in December 2009.[63]

Phase 3a: Oldham, Rochdale, South and East Manchester
Phase 3 extended Metrolink to Manchester Airport and introduced a new fleet of M5000 trams

Beginning in October 2009, Phase 3a involved converting the 14-mile (23 km) Oldham Loop heavy rail line to light rail operation and adding several new tram stops on the route;[64][65][66] re-opening a disused 1.7-mile (2.7 km) section of Cheshire Lines Committee railway to use as the first part of the South Manchester Line (to St Werburgh's Road); and building a new 4-mile (6.4 km) East Manchester Line as far as Droylsden.[14][16][60][67] When completed in 2013, Phase 3a increased Metrolink's total network length to 43 miles (69 km).[68][69]

Phase 3b: Ashton-under-Lyne, East Didsbury and Manchester Airport

Phase 3b involved the construction of a new 9-mile (14 km) Airport Line to Manchester Airport,[70] and extending three of the new Phase 3a lines: the East Manchester Line to Ashton-under-Lyne;[71] the South Manchester Line to East Didsbury;[72] and adding street-running routes through Oldham and Rochdale town centres to the Oldham and Rochdale Line.[73][74][66][75][76] Construction work began in March 2011, and Phase 3b was completed in November 2014 with the opening of the Airport line.[77][78]

Phase 2CC – Second City Crossing

Two trams running on the Second City Crossing (2CC) in Cross Street in 2017

With increased tram traffic brought about by the expansion of the Metrolink network, it became necessary to build a new route across Manchester City Centre to alleviate congestion and improve capacity.[79][80][81]

Known as the Second City Crossing (or 2CC), the project involved laying 0.8 miles (1.3 km) of tram tracks from St Peter's Square tram stop via Princess Street, Albert Square, Cross Street and Corporation Street to rejoin the original Metrolink line just before Victoria station. One new tram stop was built at Exchange Square.[79] The project also involved re-ordering St Peter's Square and re-siting the Cenotaph to accommodate an enlarged tram interchange and junction.[82] Construction began in 2014, and the 2CC route opened fully in February 2017.[83]

Trafford Park extension

The Transport & Works Act Order for the 3.4 mile Trafford Park Line was granted in October 2016.[84][85][86] Enabling works began in January 2017.[87] The line opened on 22 March 2020.[88]

Current network

Routes and stops

Metrolink service map and routes[89]
RouteOperating HoursStops
Altrincham – BuryMon–Sat daytime[lower-alpha 1]Altrincham , Navigation Road , Timperley, Brooklands, Sale, Dane Road, Stretford, Old Trafford, Trafford Bar, Cornbrook, Deansgate-Castlefield ( Deansgate), St Peter's Square, Market Street, Shudehill , Victoria , Queens Road, Abraham Moss, Crumpsall, Bowker Vale, Heaton Park, Prestwich, Besses o' th' Barn, Whitefield, Radcliffe, Bury
Altrincham – PiccadillyMon–Sun
all-day
[lower-alpha 2]
Altrincham , Navigation Road , Timperley, Brooklands, Sale, Dane Road, Stretford, Old Trafford, Trafford Bar, Cornbrook, Deansgate-Castlefield ( Deansgate), St Peter's Square, Piccadilly Gardens , Piccadilly
Ashton-under-Lyne – EcclesMon–Sun
all-day
[lower-alpha 2]
Ashton-under-Lyne ( Ashton-under-Lyne), Ashton West, Ashton Moss, Audenshaw, Droylsden, Cemetery Road, Edge Lane, Clayton Hall, Velopark, Etihad Campus, Holt Town, New Islington, Piccadilly , Piccadilly Gardens , St Peter's Square, Deansgate-Castlefield ( Deansgate), Cornbrook, Pomona, Exchange Quay, Salford Quays, Anchorage, Harbour City, MediaCityUK (not during Mon–Sat daytime),[lower-alpha 3] Broadway, Langworthy, Weaste, Ladywell, Eccles ( Eccles)
Ashton-under-Lyne – MediaCityUKMon–Sat daytime[lower-alpha 1]Ashton-under-Lyne ( Ashton-under-Lyne), Ashton West, Ashton Moss, Audenshaw, Droylsden, Cemetery Road, Edge Lane, Clayton Hall, Velopark, Etihad Campus, Holt Town, New Islington, Piccadilly , Piccadilly Gardens , St Peter's Square, Deansgate-Castlefield ( Deansgate), Cornbrook, Pomona, Exchange Quay, Salford Quays, Anchorage, Harbour City, MediaCityUK
Bury – PiccadillyMon–Sun
all-day
[lower-alpha 2]
Bury , Radcliffe, Whitefield, Besses o' th' Barn, Prestwich, Heaton Park, Bowker Vale, Crumpsall, Abraham Moss, Queens Road, Victoria , Shudehill , Market Street, Piccadilly Gardens , Piccadilly
East Didsbury – Rochdale Town CentreMon–Sun
all-day
[lower-alpha 2]
East Didsbury ( East Didsbury), Didsbury Village, West Didsbury, Burton Road, Withington, St Werburgh's Road, Chorlton, Firswood, Trafford Bar, Cornbrook, Deansgate-Castlefield ( Deansgate), St Peter's Square, Exchange Square, Victoria , Monsall, Central Park, Newton Heath and Moston, Failsworth, Hollinwood, South Chadderton, Freehold, Westwood, Oldham King Street, Oldham Central, Oldham Mumps, Derker, Shaw and Crompton, Newhey, Milnrow, Kingsway Business Park, Newbold, Rochdale Railway Station , Rochdale Town Centre
East Didsbury – Shaw and CromptonMon–Sat daytime[lower-alpha 1]East Didsbury ( East Didsbury), Didsbury Village, West Didsbury, Burton Road, Withington, St Werburgh's Road, Chorlton, Firswood, Trafford Bar, Cornbrook, Deansgate-Castlefield ( Deansgate), St Peter's Square, Exchange Square, Victoria , Monsall, Central Park, Newton Heath and Moston, Failsworth, Hollinwood, South Chadderton, Freehold, Westwood, Oldham King Street, Oldham Central, Oldham Mumps, Derker, Shaw and Crompton
The Trafford Centre – CornbrookMon–Sun
all-day
[lower-alpha 2]
The Trafford Centre , Barton Dock Road, Parkway, Village, Imperial War Museum, Wharfside, Pomona, Cornbrook
Manchester Airport – VictoriaMon–Sun
all-day
[lower-alpha 2]
Manchester Airport , Shadowmoss, Peel Hall, Robinswood Road, Wythenshawe Town Centre , Crossacres, Benchill, Martinscroft, Roundthorn, Baguley, Moor Road, Wythenshawe Park, Northern Moor, Sale Water Park, Barlow Moor Road, St Werburgh's Road, Chorlton, Firswood, Trafford Bar, Cornbrook, Deansgate-Castlefield ( Deansgate), St Peter's Square, Market Street, Shudehill , Victoria
Manchester Airport –
Deansgate-Castlefield
Mon–Sun early mornings[lower-alpha 4]Manchester Airport , Shadowmoss, Peel Hall, Robinswood Road, Wythenshawe Town Centre , Crossacres, Benchill, Martinscroft, Roundthorn, Baguley, Moor Road, Wythenshawe Park, Northern Moor, Sale Water Park, Barlow Moor Road, St Werburgh's Road, Chorlton, Firswood, Trafford Bar, Cornbrook, Deansgate-Castlefield ( Deansgate)
service runs at every 20 minutes / 3 trams per hour, rather than the usual every 12 minutes / 5 trams per hour
  1. Daytime services run 07:15–19:30 on weekdays (except bank holidays) and 09:30–18:00 on Saturdays.
  2. All-day services run 06:00–23:30 Mondays to Thursdays, 06:00–00:30 Fridays and Saturdays, and 07:00–22:30 Sundays and bank holidays.
  3. MediaCityUK served by Eccles trams between 06:00–07:15 and 19:30–23:30 Monday to Thursday, 06:00–07:15 and 19:30–00:30 Friday and Saturday, and 07:00–22:30 Sundays and Bank Holidays
  4. Early morning service runs 03:00–06:00 Monday to Saturday, 03:00–07:00 Sundays and bank holidays.

Frequencies

Metrolink operating at night (left) and in December snow (right), at Shudehill Interchange and Radcliffe tram stop respectively.

Before the inauguration, GMPTE's original concept was for Metrolink's operator to provide a service every ten minutes from Bury to Piccadilly and Altrincham to Piccadilly from 6 am to midnight, Monday to Saturday.[90] Greater Manchester Metro Limited, the system's original operator, argued for adjustments, citing the need to provide an efficient and commercially viable operation in line with vehicle running times and passenger demand.[90] Due to power limitations, this pattern was modified to a twelve-minute service throughout the day, doubling to a six-minute service in peak periods, resulting in a "ten trams per hour" service pattern on routes running from Altrincham and Bury to Manchester every six minutes.[90] Operators are required to provide this level of service at least 98% of the time or incur a financial penalty charge.[91] This six-minute service pattern has been adopted on the rest of the network as the system has grown.[68][92][93] Heavy snowfall during the winter of 2009/10 impaired Metrolink services and the operator was criticised for failing to have cold weather procedures.[94] This prompted a programme to improve the reliability and performance of the system in freezing conditions.[94][95] Metrolink operated icebreaker-style vehicles at night during snowfall in January 2013 to provide standard services.[96]

In January 2016, Transport for Greater Manchester agreed on a baseline Service Specification to grade bidders seeking to operate the concession from July 2017, once the Second City Crossing is in operation. In the baseline service pattern, there are no designated 'peak' periods of service operation; instead, there will be an 'enhanced' service operating from start of service to 8 pm Monday to Friday, and to 6 pm Saturday; and a 'core' service running at all other times. In the 'enhanced' service pattern, trams will run with a 6-minute frequency to Shaw & Oldham, Bury, Ashton, Altrincham, Manchester Airport and East Didsbury; and with a 12-minute frequency to Rochdale, Eccles and MediacityUK. When the Trafford line opens, services will run to the Trafford Centre with a 12-minute frequency. In the 'core' service pattern, all lines will run with a 12-minute frequency.[97]

A map of Metrolink lines alongside heavy rail lines in Greater Manchester

Daytime services[98]

The following services run 07:15–19:30 on weekdays and 09:30–18:00 on Saturdays.

Nine services which run every 12 minutes:

Thus the combined frequency for some routes is at least every 6 minutes, if not higher.

All-day services[98]

The following services run all day from 06:00 until 23:30 on Mondays to Thursdays, and from 06:00 until 00:30 on Fridays and Saturdays, and from 07:00 – 22:30 on Sundays and bank holidays.

Six services which all run every 12 minutes:

Early morning service[98]

The early morning service operates from 03:00–06:00 Monday to Saturday and 03:00–07:00 on Sundays and bank holidays.

One service which runs every 20 minutes:

This is mostly to support airport shift workers and people with early flights.

Services during COVID-19 pandemic[99]

Due to changing travel patterns as a result of the COVID-19 pandemic, advice is against all but essential travel. Thus Metrolink have temporarily introduced a reduced timetable, with trams running every 20 minutes on the following lines only. In September 2020 with more people returning to work and social activities there is now a 10-minute frequency operating Monday – Friday and at some service at the weekend. The 10 minute frequency has also led to double units being used on most workings:[100]

Rolling stock

Current fleet

Metrolink currently operates a fleet of 121 trams, as follows:[101][102]

Class Image Type Top speed Length
metres
 Capacity  In
service
Orders Fleet
numbers
Routes
operated
Built Years
operated
 mph   km/h  Std Sdg Total
Bombardier M5000 Tram 50 80 28.4 60 146 206 60 3001–3060 All routes 2009–2016 2009–present
14 3061–3074 All routes except Altrincham–Piccadilly
66 146 212 46 3075–3120
1 26 3121–3147 2020–ongoing
Total 121 26

Because low-floor tram technology was in its infancy when Metrolink was in its planning stages, and in order to be compatible with the former British Rail stations that Metrolink inherited, the network uses high-floor trams with a platform height of 900 mm (35 in), the same height as main line trains.[14][102]

Trams on Metrolink operate either single units, or coupled together to form double units, which regularly run during rush hours.[103]

Bombardier M5000

A coupled pair of M5000 trams, pictured in Ashton-under-Lyne in 2013

In December 2009, Metrolink took delivery of the first Bombardier M5000 tram. Built by Bombardier Transportation and Vossloh Kiepe, the initial eight M5000s were ordered to allow services to be increased.[14] They are part of the Bombardier Flexity Swift range of light rail vehicles and have a design similar to the K5000 vehicle used on the Cologne Stadtbahn.[14][16][49][104][105]

With the approval of the spur to MediaCityUK, a further four were ordered.[14] To provide rolling stock for the phase 3 extensions and replace the existing fleet, the order was increased successively to 94.[49][106][107][108] In December 2013, a further 10 M5000s were ordered to provide trams for the Trafford Park Line planned to open in 2020, while in the interim supporting a service between MediaCityUK and Manchester city centre and other capacity enhancements.[109][110] In September 2014, a further 16 were ordered; the final one of which was delivered in October 2016, bringing the fleet up to 120.[111][112][113][101]

In July 2018, a further 27 were ordered to help relieve overcrowding. It was originally announced that these would be delivered from February 2020 to June 2021,[114] but are now expected to be running from August 2020.[115]

Ancillary vehicles

Metrolink has one Special Purpose Vehicle from 1991. Numbered 1027 with its support wagon 1028, it is a bespoke diesel-powered vehicle with a crane, inspection platform, mobile workshop, and capacity for a driver and three passengers. It was designed to assist with vehicle recovery and track and line repairs.[116]

Former fleet

Manchester Metrolink has previously operated the following trams:

 Class  Image Type  Top speed  Length
metres
 Capacity   Number   Fleet
numbers 
 Routes
operated 
 Built   Years
operated 
 mph   km/h  Std Sdg Total
AnsaldoBreda T-68 Tram 50 80 29 86 122 208 26 1001–1026 Bury-Altrincham-Piccadilly
(later Eccles)
1991–1992 1992–2014
AnsaldoBreda T-68A 6 2001–2006 Eccles Line 1999 1999–2014

T-68/68A

To commence operations, a fleet of 26 T-68 trams manufactured by AnsaldoBreda in Italy was delivered in 1992.[117][118] To provide extra trams for the Eccles Line, six modified T-68A trams were purchased in 1999.[14] The T-68A vehicles were based on the original T-68s but had modifications replacing destination rollblinds with dot matrix displays, and retractable couplers and covered bogies necessary for the high proportion of on-street running close to motor traffic.[14]

Three of the earlier T-68 fleet were similarly equipped[14] and were known as T-68Ms.[119] Mechanically and electrically, the T-68M vehicles were essentially a T-68 with modifications to its brakes, mirrors, and speed limiters to suit the Eccles line.[119] Initially only these vehicles were permitted to operate the Eccles line but the entire fleet except for 3 (1018, 1019, 1020) were modified between 2008 and 2012 for universal running,[14] under a programme known as the T-68X Universal Running programme.[120]

The newer M5000 trams proved to be considerably more reliable than the T-68/A fleet, which averaged 5,000 miles between breakdowns, while the M5000s averaged 20,000 miles. This led to a decision in 2012 to withdraw the entire fleet from service and replace them with M5000s. The T-68 and T-68As were withdrawn between April 2012 and April 2014.[121]

Tram no. 1007, the first to pass through the city centre on the opening day, is at Heaton Park Tramway, awaiting restoration.[122]

San Francisco trams

In 2002, in the lead up to Manchester hosting the Commonwealth Games, a requirement to increase capacity for the event led to Metrolink investigating the purchase of redundant second-hand Boeing LRV vehicles from the Muni Metro system in San Francisco.[123] Two were procured for testing, and shipped to the UK, with one taken to Metrolink's Queen's Road depot. In the end, the proposal was not taken forward as the vehicles were found to be unsuitable for use in the UK.[124]

Infrastructure

Lines

As of December 2015, Metrolink has a network length of 57 miles (92 km) and 99 stops[125] — along eight lines which radiate from a "central triangular junction at Piccadilly Gardens which forms the hub of the Metrolink system" in Zone 1.[126]

The lines are: the Airport Line (which terminates at Manchester Airport), the Altrincham Line (which terminates in Altrincham), the Bury Line (which terminates in Bury), the East Manchester Line (which terminates in Ashton-under-Lyne), the Eccles Line (which terminates in Eccles), the Oldham and Rochdale Line (which terminates in Rochdale), the South Manchester Line (which terminates in East Didsbury), and the Trafford Park Line (which terminates at the Trafford Centre).[89]

Geographic map of Metrolink system.
Metrolink lines and zones
Line or zone First
operated
Route type(s) Length No. of stops Peak frequency[127] Start Terminus
Current
Airport Line 3 November 2014 On and off-street[lower-alpha 1] 23.2 km
14.5 mi[128]
15 12 minute Barlow Moor Road Manchester Airport
Altrincham Line 15 June 1992 Converted railway track 12.2.0 km
7.6.0 mi[128]
10 6 minute
(less before Trafford Bar)
Cornbrook Altrincham
Bury Line 6 April 1992 Converted railway track 15.9 km
9.9.0 mi
10 6 minute Queens Road Bury
Zone 1 27 April 1992 On and off-street 10 6 minute or less Victoria Cornbrook
or New Islington
East Manchester Line 11 February 2013 On and off-street 9.7.0 km
6.0 mi[129]
11 6 minute Holt Town Ashton-under-Lyne
Eccles Line 6 December 1998 On and off-street 6.4 km
4 mi[130]
10 12 minute
(6 minute before Harbour City)
Pomona Eccles
MediaCityUK spur[lower-alpha 2] 3 September 2010 Off-street 0.3 km
0.2 mi
1 12 minute MediaCityUK
Oldham and Rochdale Line 13 June 2012 Converted railway track 23.8 km
14.8 mi[9]
19 12 minute
(6 minute before Shaw and Crompton)
Monsall Rochdale Town Centre
South Manchester Line 7 July 2011 Converted railway bed 7.1 km
4.4 mi[131]
8 6 minute
(4 minute before St Werburgh's Road)
Firswood East Didsbury
Trafford Park Line 22 March 2020 On and off-street 5.5 km
3.4 mi
6 12 minute Wharfside Trafford Centre
  1. The line crosses the Mersey by a new bridge near Jackson's Boat and runs over the floodplain alongside Rifle Road.
  2. Follows the Eccles line routes from Piccadilly before turning off at Harbour City to MediaCityUK.

Tram stops

There are 99 tram stops on Metrolink, as of 2020. Low-floor platforms commonly used for light rail throughout the world were ruled out for Metrolink because the system inherited 90-centimetre (35 in) high-floor platforms from British Rail on lines formerly used for heavy rail.[132][133] The first stops on the Bury Line and Altrincham Line, opened in phase one, were formerly railway stations and were changed little from British Rail days, as available funding only allowed minimum upgrades to be made.[134] When the Oldham and Rochdale Line was converted from a railway, however, all of the former railway stations were completely rebuilt.[135]

Some stops, such as Cornbrook, are shared between lines, and may be used as interchange stations;[89] others, such as Altrincham Interchange, or Ashton-under-Lyne are transport hubs that integrate with heavy rail and bus stations.[89]

Metrolink stops are unstaffed. Each contains at least two ticket vending machines (except for Pomona, which only has one), and are provided with help/emergency call points to enable passengers to speak to control. Each stop is monitored by CCTV for public safety, and the images are continuously recorded. Route maps and general information are provided on each platform.[133] Each stop has at least one high-floor platform measuring a minimum of 2 metres (6.6 ft) wide, accessed by ramp, stairs, escalator, lift or combination thereof.[11][136] Shelters and canopies at stops were supplied by JCDecaux,[136] and ticket vending machines by Scheidt & Bachmann.[137] Card readers are installed on all stop platforms for use with the TfGM 'My Get Me There' smart card and concessionary passes. All smart card users are required to touch-in at these platform readers before commencing their journey and to touch-out at their final destination.

Power supply

The trams are electrically powered from 750 V DC overhead lines.[138] Between 1992 and 2007, electricity for the Metrolink system was procured by the operator, based on price only.[3] In 2007, GMPTE changed the contractual requirements to ensure that sustainable power would be factored into choosing an energy supplier, and in July 2007, Metrolink became the first light rail network in the UK with electricity supplied entirely from sustainable energy via hydropower.[3] Now, energy for the system is generated by biomass.[139]

Depots

Bombardier M5000 trams stabled at the Queens Road depot.

Metrolink has two depots, at Queens Road and Old Trafford: Metrolink House at Queens Road in Cheetham Hill was the original headquarters of Metrolink.[140] Constructed during Phase 1 alongside the Bury Line, it served jointly as a control centre, HQ, office space, and depot for the storage, maintenance and repair of vehicles.[140] Under the original proposals, Metrolink House was intended to be much larger, with a design which would support network expansion, but this design did not obtain the necessary planning permission from Manchester City Council.[140] Consequently, Metrolink House was scaled down to a 4-hectare (9.9-acre) £8,000,000 site with limited capacity,[140][141] and, in light of Phase 3a network expansion, the second depot in Old Trafford was built in 2011.[142][131] This second depot, adjacent to the Old Trafford tram stop, occupies the site of a former warehouse and can stable up to 96 vehicles,[131] it also has a washing plant and maintenance workshops.[143] On 7 May 2013 Metrolink completed the transfer of its main operational functions from Queens Road to Old Trafford, meaning its control room – known as the Network Management Centre – is housed jointly with the Customer Services team by its newer depot.[144]

Fares and ticketing

Metrolink Ticket Vending Machine at Bury Interchange

Metrolink fares were initially set by the system's operator,[90] but are now set by the TfGM Committee at levels that cover both the running costs and the cost of borrowing that has part-funded the expansion of the system;[145] Metrolink receives no public subsidy.[146][147] Fares typically rise each January above the rate of inflation.[148][149] The fare tariff is based on a division of the network's stops into fare zones.[150] Persons under 16 years of age, persons of pensionable age, and people with disabilities qualify for concessionary fares, some of which are mandatory and others discretionary, as determined by the Greater Manchester Combined Authority.[145] The Greater Manchester Combined Authority permits reduced fares for persons under 16 years of age, and free or reduced fares on Metrolink after 9:30 a.m. for pensioners.[145] In normal circumstances, tickets cannot be purchased on board Metrolink vehicles and must be purchased from a ticket vending machine before boarding the vehicle.[151]

Fare evasion in 2006 was estimated at 2–6% of all users,[152] and in 2012 at 2.5% of all users.[153] Checking tickets and passes and issuing Standard fares (similar to penalty fare) is the responsibility of Metrolink's Passenger Services Representatives (PSRs), who provide security and assistance on the network;[154][153] between 1992 and 2008, Greater Manchester Police had a dedicated Metrolink unit responsible for policing the system.[155]

Thorn EMI designed the original ticket vending machines.[150] In 2005 GMPTE announced that rail passengers travelling from within Greater Manchester into Manchester city centre could use the Metrolink service between the then eight City Zone stops for free.[156][157] Passengers must present a valid rail ticket, correctly dated with Manchester Ctlz as the destination.[158][159] In 2007 TfGM rolled out new ticket vending machines, designed to accept credit/debit card payments and permit the purchase of multiple tickets in a single transaction.[160] These were replaced in 2009 with touchscreen machines, designed with the Scheidt & Bachmann Ticket XPress system.[137]

In October 2012, TfGM announced it was devising a more straightforward zonal fare system, comparable to London fare zones, and preparing to introduce get me there, the region's new contactless smartcard system, for use on all public transport modes in Greater Manchester, including Metrolink.[148] After years of consultation, a new system using four concentric zones was implemented on 13 January 2019.[161] From 15 July 2019, a new contactless service began, allowing passengers to tap in and out using their contactless bank cards.[162]

Services

Accessibility

Metrolink trams and stops have been designed to be accessible to disabled passengers: each stop has been provided with access ramps or lifts, tactile paving, high visibility handrails, disabled boarding points, and help points on the platforms. The trams have also been designed with large areas available for the provision of wheelchairs and pushchairs.[163]

However, this access was not in the original plans (which were based on tram-side extending steps and low-level platforms in the city centre) and accessibility took four years of concerted campaigning by disabled people in Greater Manchester from 1984 to 1988, and particularly the efforts of Neville Strowger (1939–2015), a disabled person working as the access officer at Manchester City Council, and a founding member of the Greater Manchester Coalition of Disabled People. The campaign was to change the design policy to create full access, including retrofitting access to the legacy train stations on the Bury line and the Altrincham line. An early milestone in the campaign was a large meeting between GMPTE officers and around 70 disabled people at County Hall on 22 November 1984, including a speech from the invited disability rights campaigner Vic Finkelstein. A further key meeting was in May 1987 with over 100 disabled people and elected Councillor Guy Harkin as Chair of GMPTA plus other officials, but the policy in 1987 that was repeated at this meeting was that access would only be possible "if the budget allows." Full access was finally agreed in the summer of 1988, and productive meetings followed with disabled people on the implementation details. This campaigning was researched in detail starting in 2019 and written up in an 8-page pamphlet in February 2020.[164]

Mobility scooters were initially banned from Metrolink. However, in 2014 a scheme was introduced whereby scooters could be allowed on trams, provided they have a permit which can be obtained after an assessment of the scooter's size and manoeuvrability.[165]

Currently the Metrolink operator company consults with a group of disabled people, via TfGM's relationship with the independent Disability Design Reference Group, on any proposed changes to the services or infrastructure.[164]

Bicycle policy

Metrolink does not allow full-sized bicycles on to trams but does permit the carriage of "fully covered" folding bicycles. The ban on non-folding bicycles was upheld in 2010, despite a campaign by cycling and green groups for the trams to be adapted to allow them.[166] Campaigners against the policy had argued that the ban on bicycles was anomalous, as other large objects such as ironing boards and deckchairs were allowed on the trams under current rules.[167]

Wi-Fi

In July 2013, the Transport for Greater Manchester Committee announced that it planned to enhance the experience of travelling on Metrolink by tapping into Manchester City Council's grant from the UK Urban Broadband Fund and using it to provide Metrolink passengers with free Wi-Fi when on board. The scheme began with a trial on a single tram – number 3054 – connected to the FreeBeeMcr broadband network with the intention of rolling it out across the whole Metrolink network by Spring 2015.[168][169] It was rolled out fleet wide in March 2015.[170]

Corporate affairs

Ownership and structure

Manchester Metrolink is owned by TfGM, and is currently operated and maintained by KeolisAmey Metrolink, a joint venture between Keolis and Amey, who were awarded the contract for a period of up to 10 years from 15 July 2017.

Between 1992 and 1997 Metrolink was operated and maintained as a concession by Greater Manchester Metro Limited, and between 1997 and 2007 by Serco.[171] When next tendered, a 10-year contract was awarded to the Stagecoach Group from 15 July 2007.[172][173][174][175] On 1 August 2011, RATP Group bought the balance of the contract from Stagecoach.[11][12][94] In January 2017, the Keolis/Amey consortium was announced as the successful bidder for the operating and maintenance (O&M) contract to run from 15 July 2017.[176][177]

The key trends in recent years for Manchester Metrolink are (years ending 31 March):

Metrolink stops are marked with yellow totems, such as this one at MediaCityUK
2014 2015 2016 2017 2018 2019 2020
Passenger revenue[lower-alpha 1] (£m) 51.8 56.8 62.4 67.3 74.8 82.1 82.6
'Profit' ("Net expenditure")[lower-alpha 2] (£m) −7.13 0.58 −5.20 −1.96 −5.16
Number of passengers (m) 29.2 31.2 34.3 37.8 41.2 43.7 44.3
Number of trams (at year end) 93 109 120 120 120 120 120
Notes/sources [4][178]
[179]
[4][178]
[179]
[4][178]
[180]
[4][178]
[180]
[4][178]
[180]
[4][178]
[180]
[178]
[181]
  1. As defined in the DfT Light Rail and Tram Survey (Table LRT0301a)[178]
  2. As defined in TfGM's annual Comprehensive Income and Expenditure Statements

Passenger numbers

Manchester Metrolink Passenger Numbers from 1992 to 2017[182]

Detailed passenger journeys since Metrolink commenced operations in 1992 were:

Estimated passenger journeys made on Metrolink per financial year
Year Passenger journeys Year Passenger journeys Year Passenger journeys Year Passenger journeys
1992/93 8.1m 1999/00 14.2m 2006/07 19.8m 2013/14 29.2m
1993/94 11.3m 2000/01 17.2m 2007/08 20.0m 2014/15 31.2m
1994/95 12.3m 2001/02 18.2m 2008/09 21.1m 2015/16 34.3m
1995/96 12.6m 2002/03 18.8m 2009/10 19.6m 2016/17 37.8m
1996/97 13.4m 2003/04 18.9m 2010/11 19.2m 2017/18 41.2m
1997/98 13.8m 2004/05 19.7m 2011/12 21.8m 2018/19 43.7m
1998/99 13.2m 2005/06 19.9m 2012/13 25.0m 2019/20 44.3m
Estimates provided by TfGM to the Department for Transport,[4] based on sales from ticket machines.[note 2]

Metrolink revised its method for calculating passenger boardings in 2010/11, meaning figures are not directly comparable with previous years.[183]

A survey in 2012 revealed that 12% of people in Greater Manchester use Metrolink to travel to work, and 8% use the system every day.[146] The system is most commonly used by 21- to 30-year-olds, and was used most markedly by residents of the Metropolitan Borough of Bury — accounting for around a third of their commuter journeys.[146]

Passenger satisfaction

A survey in 2012 revealed that passengers who used Metrolink every day for commuting rated service levels as poor and/or unreliable, with those respondents particularly frustrated by delays and disruptions.[146] TfGM recognised that the older vehicles in its fleet – the T68/T68As — were outdated and the cause of much disruption, and agreed to replace them with M5000s by 2014.[49][106] Among those who used Metrolink less regularly, the system scored far better in the survey.[146] A survey in 2013 by the non-departmental government body Passenger Focus found that of the five major light rail systems in the United Kingdom – Metrolink, Sheffield Supertram, Nottingham Express Transit, Midlands Metro and Blackpool tramway – Metrolink had the lowest overall satisfaction rating in the United Kingdom. Respondents were surveyed on value for money, punctuality, seating availability, tram stops and overall satisfaction. Metrolink was below average on all criteria, and 47% believed Metrolink was value for money compared to a national average of 60%.[184]

Subsequent surveys have shown increases in passenger satisfaction. A further survey in late 2015 by watchdog Transport Focus, found that satisfaction levels had increased; 89% of passengers surveyed said they were either ‘very’ or ‘fairly’ satisfied with their overall journey, up from 83% in 2013, but still below the national average of 92%. It also found that 58% felt the service was value for money.[185] The national average rating for value for money on all tram networks was 69%.[186] The follow up survey in 2016 found further improvements, with 90% of respondents reporting they were either ‘very’ or ‘fairly’ satisfied with their overall journey, compared to the national average of 93%. 62% now felt the service was value for money, against a national average still of 69%, which although improved was still the lowest ranking of the six systems covered by the survey.[187]

Corporate identity

The Metrolink logo device
Brand transition: AnsaldoBreda T-68 & Bombardier M5000 trams in old and new livery in 2011

The standard corporate identity across the Metrolink system uses a pale yellow and metallic silver colour scheme, with a logotype that consists of a diamond motif formed from a pattern of repeating circles and the Metrolink name. The logo, signage and publicity use the Pantograph sans regular typeface. Tram livery features yellow at the vehicle ends with grey sides and black doors, and a pattern of circles.

The corporate identity was created in October 2008 by Hemisphere Design & Marketing Consultants of Manchester, in collaboration with designer Peter Saville and the transport design agency Design Triangle.[188][189][38] The Pantograph typeface was specially commissioned from the Dalton Maag type foundry.[190] The design standard was applied to the Metrolink network when the new M5000 trams were introduced to the network.[191] Hemisphere chose yellow for its high visibility and to reflect Greater Manchester's culture of confidence and optimism.[192]

When the Metrolink network first came into operation in 1992, it used a system-wide colour scheme and vehicle livery of aquamarine, black and grey, along with a stylised "M" monogram placed at an angle within a circle. This branding, along with the Metrolink brand name, was devised by Fitch RS and Design Triangle,[193][194] and first revealed at a press launch in June 1988.[195][196] Before this, during the planning stage, the system was known as "Light Rapid Transit" (LRT) and promotional material used an orange and brown identity used by Greater Manchester Transport and GM Buses.[197][198]

Public relations

Transport planners in Greater Manchester describe Metrolink as both "an icon of Greater Manchester",[131] and "an integral part of the landscape in Greater Manchester".[199] The Guardian describes Metrolink as "Manchester's efficient and much-loved tram system".[57] Under the ownership of the Guardian Media Group, the Manchester Evening News spearheaded the Get Our Metrolink Back on Track campaign in 2004–05.[200] Under Trinity Mirror ownership, the Manchester Evening News used the Freedom of Information Act 2000 to reveal that Metrolink received over 10,000 complaints between May 2011 and May 2012.[201]

Metrolink has had close connections with popular culture in Manchester and has taken advantage of the city's strong associations with football culture. Metrolink has been a "Football Development Partner" with the Manchester Football Association since August 2010,[202] meaning it is the association's Official Travel Partner and supports grassroots association football in Greater Manchester by selecting a "Team of the Month".[203] In 2013, then Manchester City F.C. manager Roberto Mancini and players Joe Hart, Vincent Kompany and James Milner recorded special stop announcements to be used on Metrolink's East Manchester Line on dates when Manchester City play at home at the City of Manchester Stadium (served by the Etihad Campus tram stop). The announcements were first used on 17 February 2013, for Manchester City's FA Cup Fifth Round tie against Leeds United A.F.C.[204]

Metrolink is a sponsor of the annual Manchester Food and Drink Festival.[205]

Metrolink has also featured in television drama. On 6 December 2010, the soap opera Coronation Street featured a storyline with an explosion which caused a crash on the Metrolink system at Weatherfield. The episode was written to celebrate the soap opera's 50th anniversary.[206] Although a fictitious event, at least six calls were made to GMPTE asking if services had been affected.[207]

Future developments

Many speculative expansion proposals exist for new lines to Stockport, a loop around Wythenshawe, and the addition of tram-train technology.

Accidents and incidents

Manchester Metrolink has many tramway sections, along which trams share the highway with other road traffic and pedestrians. Trams are equipped with a two-tone standard horn and a louder warning horn which is primarily intended for use on former railway routes but can be used anywhere.[208] A number of fatal incidents have occurred on the network since opening in 1992:

  • On 18 October 2002, a pedestrian died after a collision with a tram after falling on to tracks near Manchester Central.[209]
  • On 25 June 2005, a pedestrian died after a collision with a tram at Navigation Road stop.[210]
  • On 5 June 2011, a pedestrian died after a collision near Piccadilly Gardens.[211]
  • On 15 December 2011, a blind man died after a collision with a tram near St Peters' Square.[212]
  • On 6 February 2013, a pedestrian died after a collision with a tram at the Failsworth stop.[213]
  • On 11 January 2014, a pedestrian died after a collision with a tram at the Market Street stop.[214]
  • On 16 February 2016, a cyclist died after a collision with a tram at the Robinswood Road stop.[215]
  • On 17 April 2019, Ray Boddington, one of the members of the Manchester busking band The Piccadilly Rats died after a collision with a tram between the Market Street and Shudehill stops.[216]
  • On 17 January 2020, a pedestrian died after a collision with a tram near the Shaw and Crompton stop.[217]

See also

Notes

  1. The system is branded Metrolink.[1][2][3] The Department for Transport refers to the system as Manchester Metrolink,[4] an alternative unofficial name.[5][6] It is defined in Acts of Parliament and Byelaws as the Greater Manchester Light Rapid Transit System;[2][3] and sometimes (unofficially) called Greater Manchester Metrolink.[7]
  2. Estimates excludes free travel such as Concessionary Bus Pass for pensioners and tickets sold through other vendors.[183]

References

  1. Ogden & Senior 1992, p. 4.
  2. Department for Transport (2009). "Explanatory Memorandum to the Greater Manchester (Light Rapid Transit System) (Exemptions) Order 2009". legislation.gov.uk. Archived from the original on 15 February 2015. Retrieved 19 January 2013. The Order grants exemptions from certain requirements of railways legislation currently applying to the Greater Manchester Light Rapid Transit System ("Metrolink") ...
  3. Slatcher, Adrian (17 December 2010). "Procurement of hydro-electricity for Metrolink – the Greater Manchester light rapid transit system". Manchester: Energy Planning Knowledge Base. Archived from the original on 28 July 2013. Retrieved 19 January 2013. GMPTE own the Greater Manchester light rapid transit system – known as Metrolink.
  4. "Light Rail and Tram Statistics: England 2018/19" (PDF). Department for Transport. 19 June 2019. Archived (PDF) from the original on 2 July 2019. Retrieved 20 June 2019.
  5. Ogden & Senior 1992, p. 106.
  6. "£500m tram extension unveiled". BBC News. 22 March 2000. Archived from the original on 26 July 2008. Retrieved 5 January 2013.
  7. Ogden & Senior 1992, p. 39.
  8. "LTRA World Systems List index". lrta.org. Light Rail Transit Association. Archived from the original on 21 September 2015. Retrieved 11 December 2014.
  9. Scheerhout, John (3 September 2016). "How Manchester's Metrolink system has become the biggest light rail network in the UK over the past 24 years". Manchester Evening News. Archived from the original on 22 August 2018. Retrieved 22 August 2018.
  10. "New Metrolink line to Wythenshawe and Manchester Airport to open on November 3 – a year ahead of schedule". Manchester Evening News. 13 October 2014. Archived from the original on 18 October 2014. Retrieved 2 November 2014.
  11. "Salford Infrastructure Delivery Plan" (PDF). Salford City Council. February 2012. Archived from the original (PDF) on 20 May 2013. Retrieved 22 January 2013.
  12. "RATP buys Manchester Metrolink operator". Railway Gazette International. London. 2 August 2011. Archived from the original on 17 September 2011. Retrieved 2 August 2011.
  13. "Light Rail and Tram Statistics: England 2018/19" (PDF). Archived (PDF) from the original on 2 July 2019. Retrieved 20 June 2019.
  14. "Manchester Metrolink, United Kingdom". railway-technology.com. Archived from the original on 3 February 2016. Retrieved 10 January 2013.
  15. "Manchester Metrolink, United Kingdom". Railway Technology. 2010. Archived from the original on 3 July 2013. Retrieved 12 July 2013.
  16. Kingsley, Nick (19 October 2007). "Manchester plays catch-up with Metrolink expansion". Railway Gazette International. London. Archived from the original on 24 March 2014. Retrieved 12 January 2013.
  17. Transport for Greater Manchester (March 2014). "Greater Manchester Growth and Reform Plan: Transport Strategy and Investment Plan" (PDF). Archived from the original (PDF) on 19 August 2014. Retrieved 17 August 2014.
  18. "Ground broken on Manchester's Trafford Park Line". Global Rail News. Archived from the original on 14 January 2017. Retrieved 15 January 2017.
  19. Wordsworth, Nigel (14 October 2016). "Manchester Metrolink Trafford Park extension approved". Global Rail News. Archived from the original on 25 October 2016. Retrieved 24 October 2016.
  20. "A Short History of Public Transport in Greater Manchester". Museum of Transport Greater Manchester. Archived from the original on 10 November 2010. Retrieved 14 March 2017.
  21. Williams 2003, p. 273.
  22. Holt 1992, pp. 6–7.
  23. Fitzgerald, Todd (11 August 2015). "Revealed: 100 years of failed transport plans for Manchester – monorail and underground tube included". men. Archived from the original on 6 March 2017. Retrieved 5 March 2017.
  24. Starkie, D. N. M. (22 October 2013). Transportation Planning, Policy and Analysis: Urban and Regional Planning Series. Elsevier. p. 35. ISBN 9781483156439. Archived from the original on 8 March 2017. Retrieved 7 March 2017.
  25. "Monorail for Manchester?". archive.commercialmotor.com. 28 January 1966. Archived from the original on 5 March 2017. Retrieved 5 March 2017.
  26. De Leuw, Cather & Partners; Hennessey, Chadwick, O'Heocha & Partners (August 1967). Manchester Rapid Transit Study, Volume 2. Archived from the original on 8 March 2017. Retrieved 15 March 2017.CS1 maint: multiple names: authors list (link)
  27. Ogden & Senior 1992, p. 22.
  28. "Green light for Manchester tube project". The Guardian. 18 July 1967. Archived from the original on 20 December 2016.
  29. Holt 1992, p. 5.
  30. Donald, Cross & Bristow 1983, p. 45.
  31. Brook, Richard; Dodge, Martin (2012). Infra_MANC – Post-war infrastructures of Manchester (PDF). RIBA/CUBE Gallery. p. 134. Archived (PDF) from the original on 26 January 2016. Retrieved 27 January 2016. (exhibition catalogue)
  32. Wainwright, Martin (14 March 2012). "Manchester's tube train that never was". The Guardian. Archived from the original on 4 January 2017.
  33. Ogden & Senior 1992, pp. 26–27.
  34. Ogden & Senior 1992, p. 37.
  35. Ogden & Senior 1992, p. 25.
  36. GMPTE 2000.
  37. Ogden & Senior 1992, pp. 30–31.
  38. Kessell, Clive (30 November 2011). "Manchester Metrolink 20 Years of Evolution". The Rail Engineer. Archived from the original on 29 October 2013. Retrieved 2 January 2013.
  39. Ogden & Senior 1992, pp. 73–74.
  40. "Metrolink in the City Centre". LRTA. Archived from the original on 14 February 2017. Retrieved 19 December 2016.
  41. "Metrolink : Routes : city centre routes". TheTrams. Archived from the original on 8 April 2016. Retrieved 19 December 2016.
  42. Holt 1992, p. 94.
  43. Ogden & Senior 1991, p. 17.
  44. Ogden & Senior 1992, p. 51.
  45. UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 2 February 2020.
  46. Ogden & Senior 1992, p. 82.
  47. Holt 1992, p. 90.
  48. GMPTE 2003, p. 9.
  49. "Manchester's oldest Metrolink trams to be replaced". BBC News. 17 July 2012. Archived from the original on 6 November 2012. Retrieved 20 January 2013.
  50. "Salford Quays Milestones: The Story of Salford Quays" (PDF). Salford City Council. 2008. Archived from the original (PDF) on 27 March 2009. Retrieved 3 January 2013.
  51. "More money for UK light rail". Railway Gazette International. London. 1 January 2003. Archived from the original on 2 March 2014. Retrieved 13 January 2013.
  52. GMPTE 2003, p. 10.
  53. Officer, Tony Williams LRTA Manchester Area. "News 1998 & 1999 — Manchester Metrolink — LRTA". Light Rail Transit Association. Archived from the original on 12 July 2016. Retrieved 10 March 2017.
  54. "Whistle-stop Princess takes home hat souvenir". Manchester Evening News. 9 January 2001. Archived from the original on 20 April 2013. Retrieved 8 January 2013.
  55. "Metrolink extension is announced". BBC News. 6 July 2006. Archived from the original on 11 January 2009. Retrieved 7 January 2013.
  56. "Greater Manchester Local Transport Plan 2" (PDF). Greater Manchester Passenger Transport Authority. March 2006. Archived from the original (PDF) on 5 March 2014. Retrieved 5 January 2013.
  57. Ward, David (2 August 2004). "Tram fury rattles ministers". The Guardian. London. Archived from the original on 28 August 2013. Retrieved 5 January 2013.
  58. "Government scraps trams extension". BBC News. 20 July 2004. Retrieved 19 January 2013.
  59. "Metrolink 'to axe hospital route'". BBC News. 22 June 2005. Archived from the original on 24 December 2006. Retrieved 19 January 2013.
  60. "Metrolink: back on track?". BBC News. 13 May 2009. Archived from the original on 14 November 2012. Retrieved 19 January 2013.
  61. TfGM & GMCA 2011, p. 80.
  62. "Metrolink trams pull in to MediaCityUK station for first time". Manchester Evening News. 20 September 2010. Archived from the original on 23 September 2010. Retrieved 25 September 2010.
  63. "A new generation of trams for Greater Manchester". Metrolink. Archived from the original on 13 November 2012. Retrieved 15 March 2013.
  64. Kirby, Dean (1 October 2009). "Signalman reaches end of line". Manchester Evening News. Archived from the original on 4 August 2012. Retrieved 5 October 2009.
  65. "End of era as loop line is replaced". Manchester Evening News. 26 September 2008. Archived from the original on 14 January 2013. Retrieved 5 October 2009.
  66. "Metrolink trams reach Oldham Mumps". Railway Gazette International. London. 13 June 2012. Archived from the original on 1 February 2014. Retrieved 13 January 2013.
  67. "First line opens under £1·4bn Manchester tram expansion". Railway Gazette International. London. 8 July 2011. Retrieved 19 January 2013.
  68. "Next stop: Rochdale!" (Press release). Transport for Greater Manchester. 20 February 2013. Archived from the original on 23 May 2013. Retrieved 20 February 2013.
  69. "Next stop: Rochdale!". Rochdale Online. 20 February 2013. Archived from the original on 25 February 2013. Retrieved 20 February 2013.
  70. "Manchester Metrolink starts Phase 3b". Railway Gazette International. London. 22 March 2011. Archived from the original on 24 September 2015. Retrieved 20 January 2013.
  71. "Ashton and Didsbury Metrolink extensions funded". Railway Gazette International. London. 8 March 2010. Archived from the original on 23 October 2012. Retrieved 20 January 2013.
  72. Kirby, Dean (14 May 2013). "Metrolink extension to East Didsbury to open next week- three months early". Manchester Evening News. Retrieved 14 May 2013.
  73. Young 2008, p. 163.
  74. Holt 1992, pp. 92–93.
  75. "Manchester Metrolink Phase 3b confirmed". Railway Gazette International. London. 5 August 2010. Retrieved 19 January 2013.
  76. "Bringing Metrolink to Oldham and Rochdale" (PDF). Greater Manchester Passenger Transport Authority. 2000. Archived from the original (PDF) on 28 January 2013. Retrieved 15 January 2013.
  77. "Metrolink – The Airport Line has landed". Archived from the original on 7 September 2017. Retrieved 3 November 2014.
  78. "Metrolink line to Manchester Airport opens a year early". BBC News. 3 November 2014. Archived from the original on 26 October 2018. Retrieved 20 June 2018.
  79. "Metrolink second city crossing 'vital' for Manchester". BBC News. 8 June 2011. Archived from the original on 27 May 2012. Retrieved 7 January 2013.
  80. TfGM & GMCA 2011, p. 84.
  81. "Ministers clear way for second city centre Metrolink line". Place North West. 7 October 2013. Archived from the original on 29 October 2013. Retrieved 7 October 2013.
  82. Linton, Deborah (25 January 2014). "Workmen start on cenotaph relocation". Manchester Evening News. Archived from the original on 1 March 2017. Retrieved 28 February 2017.
  83. "26th February 2017:Second City Crossing opens". Manchester Evening News. Archived from the original on 25 February 2017. Retrieved 26 February 2017.
  84. "Metrolink line to the Trafford Centre will go ahead despite objections from Coronation Street and Manchester United" Archived 16 October 2016 at the Wayback Machine. Manchester Evening News. 14 October 2016.
  85. "Metrolink's Trafford Park £350m Tramline Approved" Archived 29 November 2018 at the Wayback Machine. BBC News. 13 October 2016.
  86. "Powers granted for Manchester Metrolink Trafford Park extension Archived 17 October 2016 at the Wayback Machine". Railway Gazette International (London). 14 October 2016.
  87. "Enabling works begin on new Trafford Park Metrolink line". Archived from the original on 20 August 2017. Retrieved 14 January 2017.
  88. "The opening date for the Metrolink Trafford Park Line has been confirmed". The Manc. Retrieved 9 March 2020.
  89. "Route Map". Transport for Greater Manchester. 19 January 2019. Archived from the original on 19 January 2019. Retrieved 19 January 2019.
  90. Ogden & Senior 1992, pp. 124–127.
  91. Ogden & Senior 1992, p. 124.
  92. "Getting to The Quays and MediaCityUK". Transport for Greater Manchester. Archived from the original on 1 February 2016. Retrieved 23 January 2013.
  93. "Brightening up your day" (PDF) (Press release). Metrolink. 2012. Archived (PDF) from the original on 8 January 2013. Retrieved 23 January 2013.
  94. "Metrolink firm slammed over 'unacceptable' service". Manchester Evening News. 8 November 2011. Archived from the original on 1 August 2013. Retrieved 23 January 2013.
  95. "Get some de-icer: Passengers fume as Metrolink trams are 'severely disrupted' by first frost of the winter". Manchester Evening News. 7 November 2011. Archived from the original on 1 August 2013. Retrieved 23 January 2013.
  96. Britton, Paul (16 January 2013). "Five inches of snow to hit Manchester". Manchester Evening News. Archived from the original on 1 August 2013. Retrieved 23 January 2013.
  97. "Metrolink 2017". Transport for Greater Manchester. Archived from the original on 31 January 2016. Retrieved 20 January 2016.
  98. "Metrolink tram times". Transport for Greater Manchester. 19 January 2019. Retrieved 19 January 2019.
  99. "Coronavirus: Tram information and advice". Retrieved 14 April 2020.
  100. "Indicative Metrolink Timetables – Valid from 6 April 2020". Retrieved 14 April 2020.
  101. "Milestone moment as Metrolink's final M5000 tram leaves Vienna depot". Railway Technology Magazine. Archived from the original on 21 December 2016. Retrieved 21 December 2016.
  102. "T68 and T68a — Metrolink phase 1 and 2". Light Rail Transit Association. Archived from the original on 7 March 2016. Retrieved 22 January 2016.
  103. "Metrolink : Trams". TheTrams. Archived from the original on 29 December 2016. Retrieved 21 December 2016.
  104. "£2m tram is up and running". Manchester Evening News. 21 December 2009. Retrieved 20 January 2013.
  105. "Future's yellow for trams". Manchester Evening News. 13 July 2009. Retrieved 20 January 2013.
  106. "Happy birthday Metrolink: Old trams axed as network turns 20". Manchester Evening News. 17 July 2012. Archived from the original on 19 July 2012. Retrieved 29 January 2013.
  107. "A new generation of trams for Greater Manchester". Metrolink. Archived from the original on 13 November 2012. Retrieved 20 January 2013.
  108. Kirby, Dean (26 September 2012). "Metrolink's next trams to have extra seats following passenger plea". Manchester Evening News. Archived from the original on 28 September 2012. Retrieved 20 January 2013.
  109. Williams, Jennifer (28 October 2013). "Second cross-city tram link gets green light". Manchester Evening News. Archived from the original on 31 October 2013. Retrieved 28 October 2013.
  110. Bombardier to Supply 10 Additional Light Rail Vehicles to Manchester Metrolink in the UK Archived 21 August 2014 at the Wayback Machine Bombardier 23 December 2013
  111. More M5000s for Metrolink Archived 21 August 2014 at the Wayback Machine British Trams Online 7 July 2014
  112. "Metrolink investment confirmed" Tramways & Urban Transit issue 921 September 2014 page 360
  113. Charlotte Cox (16 September 2014). "Watch: Metrolink airport line on test as TfGM order new trams worth £34m". men. Archived from the original on 24 September 2014. Retrieved 24 September 2014.
  114. "Transport bosses sign £72m deal to buy 27 new trams". Manchester Evening News. Archived from the original on 3 July 2018. Retrieved 2 July 2018.
  115. "Manchester's new Metrolink trams have been delayed and now won't be running until next August". Manchester Evening News. 25 October 2019. Retrieved 7 April 2020.
  116. Holt 1992, p. 48.
  117. Holt 1992, p. 42.
  118. Ogden & Senior 1992, pp. 114–115.
  119. Coward & Henderson 2014, p. 29.
  120. Coward & Henderson 2014, pp. 31–32, 59.
  121. Kirby, Dean (30 April 2014). "End of the line for Metrolink's first tram fleet". Manchester Evening News. Archived from the original on 2 May 2014. Retrieved 1 May 2014.
  122. "Two Metrolink T68s to be preserved". British Trams Online News. Archived from the original on 8 December 2015. Retrieved 2 November 2015.
  123. Lelchuk, Ilene (14 January 2002). "Muni cars on a roll into city junkyard: Even preservationists reject the clunkers". San Francisco Chronicle. p. B-1. Archived from the original on 6 July 2017. Retrieved 23 February 2017.
  124. "Metrolink : Trams : San Francisco Muni tramcar No. 1326". thetrams.co.uk. Archived from the original on 24 February 2017. Retrieved 23 February 2017.
  125. TfGM & GMCA 2011, pp. 136–137.
  126. Ogden & Senior 1992, p. 61.
  127. "Tram Frequencies". Metrolink. Archived from the original on 23 August 2016. Retrieved 31 August 2016.
  128. Ogden & Senior 1992, p. 73.
  129. Kirby, Dean (6 February 2013). "Video: Sneak preview of Metrolink's brand new East Manchester Line to Droylsden". Manchester Evening News. Archived from the original on 1 August 2013. Retrieved 6 February 2013.
  130. GMPTE 2003, p. 15.
  131. TfGM 2012, p. 23.
  132. Holt 1992, p. 31.
  133. "Metrolink Stops". LRTA. Archived from the original on 12 July 2016. Retrieved 18 December 2016.
  134. "Metrolink History 1". LRTA. Archived from the original on 22 June 2017. Retrieved 18 December 2016.
  135. "Manchester to Oldham and Rochdale". LRTA. Archived from the original on 10 April 2017. Retrieved 18 December 2016.
  136. Ogden & Senior 1992, pp. 89–90.
  137. GMPTE 2009, p. 4.
  138. Ogden & Senior 1992, p. 102.
  139. "Pages – TfGM Green Facts". Archived from the original on 25 December 2014. Retrieved 24 December 2014.
  140. Holt 1992, p. 79.
  141. Ogden & Senior 1991, p. 43.
  142. GMPTE 2010, p. 6.
  143. "Manchester, City South". LRTA. Archived from the original on 26 February 2013. Retrieved 29 December 2016.
  144. "Metrolink Completes Move To Old Trafford". Manchester Confidential. 7 May 2013. Archived from the original on 5 June 2013. Retrieved 11 May 2013.
  145. TfGM & GMCA 2011, p. 97.
  146. "The Tram: It's great ... apart from when it breaks". Manchester Evening News. 14 August 2012. Retrieved 18 January 2013.
  147. Ogden & Senior 1992, p. 126.
  148. "Metrolink set to move to new 'zone' ticket prices". Manchester Evening News. 11 October 2012. Archived from the original on 1 November 2012. Retrieved 19 January 2013.
  149. "Call to rethink rise in Greater Manchester tram fares". BBC News. 18 November 2010. Archived from the original on 16 June 2012. Retrieved 20 January 2013.
  150. Ogden & Senior 1992, p. 128.
  151. Holt 1992, p. 83.
  152. Dauby, Laurent; Kovacs, Zoltan (January 2007). "Fare Evasion in Light Rail Systems" (PDF). Transportation Research Circular. Washington, DC: Transportation Research Board (E-C112 – Proceedings Joint International Light Rail Conference, St. Louis, Missouri, 9–11 April 2006): 230–247. ISSN 0097-8515. Archived (PDF) from the original on 25 May 2013. Retrieved 21 January 2013.
  153. Cox, Charlotte (29 June 2013). "Metrolink bosses on track to halt the 900 fare dodgers". Manchester Evening News. Archived from the original on 7 April 2014. Retrieved 30 June 2013.
  154. TfGM 2012, p. 20.
  155. Cox, Charlotte (19 March 2013). "Racist attack on dad and daughter sparks tram policing review". Manchester Evening News. Archived from the original on 1 August 2013. Retrieved 19 March 2013.
  156. "Free tram rides for train riders". BBC News. 28 October 2005. Archived from the original on 6 December 2008. Retrieved 17 February 2013.
  157. "Train and tram return combined peak ticket (adult)". Transport for Greater Manchester.
  158. "Freedom of the City". Transport for Greater Manchester. Archived from the original on 7 April 2014. Retrieved 17 February 2013.
  159. "Freedom of the City" (PDF). Transport for Greater Manchester. p. 4. Archived from the original (PDF) on 12 June 2013. Retrieved 17 February 2013.
  160. TfGM & GMCA 2011, p. 79.
  161. "New Metrolink ticket zones". Transport for Greater Manchester (TfGM). Archived from the original on 5 December 2018. Retrieved 5 December 2018.
  162. "Archived copy". Archived from the original on 16 July 2019. Retrieved 6 August 2019.CS1 maint: archived copy as title (link)
  163. "Making Metrolink accessible for all". Rail Magazine. Archived from the original on 16 January 2017. Retrieved 14 January 2017.
  164. Baldwinson, Tony (2020). "Metrolink Trams – the 1980s and how full access to the new tram system was won by a campaign led by disabled people" (PDF).
  165. "Mobility scooter ban on Manchester Metrolink trams lifted after trial". BBC News. Archived from the original on 18 January 2017. Retrieved 14 January 2017.
  166. "Metrolink tram bicycle ban stays in place". BBC News. Archived from the original on 18 January 2017. Retrieved 14 January 2017.
  167. "Should bikes be allowed on the city's Metrolink trams?". BBC. Archived from the original on 18 January 2017. Retrieved 14 January 2017.
  168. "Manchester unveils revised Superconnected Cities plans". The Manchester Gazette. 7 July 2013. Archived from the original on 14 July 2013. Retrieved 7 July 2013.
  169. "Wi-Fi tram test-trial on track for Metrolink". The Manchester Gazette. 23 August 2013. Archived from the original on 24 August 2013. Retrieved 24 August 2013.
  170. "Free wifi rolled out on all Metrolink trams". 30 March 2015. Archived from the original on 8 December 2015. Retrieved 20 December 2018.
  171. Kirby, Dean (2 August 2011). "Stagecoach hand over control of Metrolink system to French firm RATP". Manchester Evening News. Archived from the original on 11 August 2011. Retrieved 2 August 2011.
  172. "Stagecoach signs Manchester Metrolink contract" (Press release). Stagecoach Group. 29 May 2007. Archived from the original on 6 June 2014. Retrieved 28 December 2008.
  173. "Stagecoach take over tram service". BBC News. 15 July 2007. Archived from the original on 31 August 2007. Retrieved 1 November 2008.
  174. "Stagecoach ousts Serco to run Manchester trams" Rail issue 563 25 April 2007 page 6
  175. "Stagecoach takes on trams" Rail issue 571 1 August 2007 page 15
  176. Southern Rail operator to take over running of Metrolink Archived 2 February 2017 at the Wayback Machine Manchester Evening News 18 January 2017
  177. KeolisAmey Metrolink
  178. "Light rail and tram statistics (LRT)". Department for Transport. 25 June 2020. Retrieved 30 June 2020.
  179. "Manchester Metrolink". British Trams Online. Retrieved 21 April 2020.
  180. "Transport for Greater Manchester Statement of Accounts". TfGM. Retrieved 20 April 2020.
  181. "Transport for Greater Manchester Statement of Accounts for the year ended 31 March 2020" (PDF). TfGM. Retrieved 30 June 2020.
  182. "Passenger journeys, vehicle miles and occupancy (LRT01) – GOV.UK". Archived from the original on 21 September 2016. Retrieved 9 August 2016.
  183. "Light rail and tram statistics: 2011/12". Department for Transport. 19 July 2012. Light rail and tram statistics 2011/12 and XLS tables (Table LRT0101). Archived from the original on 29 July 2013. Retrieved 18 January 2013.
  184. "Manchester's Metrolink does not give value for money, say passengers". Manchester Evening News. 9 April 2014. Archived from the original on 13 April 2014. Retrieved 9 April 2014.
  185. "Metrolink passengers are 89 per cent satisfied with overall tram service, claims new survey". Manchester Evening News. Archived from the original on 22 December 2016. Retrieved 10 December 2016.
  186. "Tram Passenger Survey reveals continual rise in passenger satisfaction". Euro Transport Magazine. Archived from the original on 20 December 2016. Retrieved 10 December 2016.
  187. "Tram Passenger Survey, Key findings Autumn 2016" (PDF). Transport Focus. Archived (PDF) from the original on 13 February 2018. Retrieved 12 February 2018.
  188. "Work: a taster". Hemisphere Design and Marketing Consultants. 2008. Archived from the original on 22 April 2008. Retrieved 13 June 2009.
  189. "Tram design on the right track". Manchester Evening News. 14 October 2008. Archived from the original on 3 April 2015. Retrieved 31 January 2009.
  190. "Linking It All Up". Infoletter. Dalton Maag. March 2009. Archived from the original on 20 February 2012. Retrieved 20 June 2009.
  191. "New look for new trams" (Press release). GMPTE. 8 October 2008. Archived from the original on 2 March 2012. Retrieved 20 June 2009.
  192. GMPTE 2009, p. 3.
  193. Ogden & Senior 1991, p. 42.
  194. Ogden & Senior 1992, p. 143.
  195. Holt 1992, pp. 26–27.
  196. GMPTE 2003, p. 4.
  197. Holt 1992, p. 24.
  198. Holt 1992, p. 30.
  199. Satchell, Clarissa (6 September 2004). "Moving plea to save Metrolink". Manchester Evening News. Retrieved 19 January 2013.
  200. "Oldham Metrolink line a huge success with 250,000 passengers in first three months". Manchester Evening News. 15 September 2012. Retrieved 8 January 2013.
  201. "10,000 complaints about Metrolink in one year". Manchester Evening News. 16 October 2012. Archived from the original on 20 October 2012. Retrieved 19 January 2013.
  202. "Metrolink". Manchester Football Association. Archived from the original on 19 April 2012. Retrieved 19 January 2013.
  203. "Team of the month: Swinton FC". Manchester Evening News. 3 October 2012. Retrieved 19 January 2013.
  204. Keegan, Mike (12 February 2013). "Manchester City are tram-pions as they voice the announcements for new Etihad Metrolink stop". Manchester Evening News. Archived from the original on 1 August 2013. Retrieved 16 February 2013.
  205. Bainbridge, Pete (17 September 2010). "Metrolink offers travel pass for Food and Drink Festival". Manchester Evening News. Archived from the original on 26 November 2010. Retrieved 19 January 2013.
  206. "Coronation Street tram crash pulls in 13m viewers". BBC News. 7 December 2010. Archived from the original on 20 May 2011. Retrieved 23 January 2013.
  207. Kirby, Dean (8 December 2010). "Are the trams still running?: 'Confused' viewers called Metrolink to check service after Coronation Street crash". Manchester Evening News. Archived from the original on 1 August 2013. Retrieved 23 January 2013.
  208. "Looking out for your safety" (PDF). Transport for Greater Manchester. Archived (PDF) from the original on 11 November 2013. Retrieved 27 March 2016.
  209. "Tragedy of student in tram horror". Manchester Evening News. 15 February 2007. Archived from the original on 8 April 2016. Retrieved 27 March 2016.
  210. "Boy, 16, in tram tragedy". Manchester Evening News. 30 June 2005. Archived from the original on 8 April 2016. Retrieved 27 March 2016.
  211. "Fatal accident at Piccadilly Gardens, Manchester, 5 June 2011" (PDF). Rail Accident Investigation Branch. Archived (PDF) from the original on 7 March 2016. Retrieved 16 February 2016.
  212. "Blind health and safety adviser falls to death under tram". The Telegraph. Archived from the original on 4 November 2012. Retrieved 30 May 2017.
  213. "Oldham News – News Headlines – First fatality on Oldham's new Metrolink line – Chronicle Online". Oldham Chronicle. 7 February 2013. Archived from the original on 5 March 2016. Retrieved 16 February 2016.
  214. "Man dies after being hit by a tram in Manchester city centre". Manchester Evening News. 11 January 2014. Archived from the original on 15 March 2016. Retrieved 16 February 2016.
  215. "Cyclist dies after collision involving tram in Wythenshawe". Manchester Evening News. 16 February 2016. Archived from the original on 17 February 2016. Retrieved 16 February 2016.
  216. "'My heart is shattered': Piccadilly Rats frontman Ray Boddington dies in hospital with family at his bedside". Manchester Evening News. Archived from the original on 19 April 2019. Retrieved 21 July 2019.
  217. "Man dies after being hit by a tram in Oldham". Manchester Evening News. 17 January 2020. Retrieved 17 January 2020.

Bibliography

  • Coward, Andrew; Henderson, John E. (2014). Superb: A Tribute to the Manchester Metrolink T68 & T68A Light Rail Vehicles. Bacup, Lancashire. ISBN 978-1-62407-917-7.
  • Docherty, Iain; Shaw, Jon (20 July 2011). A New Deal for Transport: The UK's struggle with the sustainable transport agenda. John Wiley & Sons. ISBN 978-1-4443-5551-2.
  • Donald, T.; Cross, M.; Bristow, Roger (1983). English Structure Planning. Routledge. ISBN 0-85086-094-6.
  • GMPTE (2000). Metrolink, Transforming Our Future: A Network for the 21st Century. Manchester: GMPTE Promotions.
  • GMPTE (2003). Metrolink: A Network for the 21st Century (PDF). Manchester: GMPTE Promotions.
  • GMPTE (2009). The Link/2: Metrolink news and developments from GMPTE (PDF). Manchester: GMPTE Promotions.
  • GMPTE (2010). The Link/3: Metrolink news and developments from GMPTE (PDF). Manchester: GMPTE Promotions.
  • Holt, David (1992). Manchester Metrolink. UK light rail systems; no. 1. Sheffield: Platform 5. ISBN 1-872524-36-2.
  • Ogden, Eric; Senior, John (1992). Metrolink. Glossop, Derbyshire: Transport Publishing Company. ISBN 0-86317-155-9.
  • Ogden, Eric; Senior, John (1991). Metrolink: Official Handbook. Glossop, Derbyshire: Transport Publishing Company. ISBN 0-86317-164-8.
  • TfGM (2012). Annual Report 2011/2012: Connecting Greater Manchester (PDF). Manchester: Transport for Greater Manchester. Archived from the original (PDF) on 2 March 2014.
  • TfGM; GMCA (2011). Greater Manchester's third Local Transport Plan 2011/12 – 2015/16 (PDF). Transport for Greater Manchester. Archived from the original (PDF) on 3 March 2016.
  • Williams, Gwyndaf (2003). The Enterprising City Centre: Manchester's Development Challenge. Routledge. ISBN 978-0-415-25262-1.
  • Worthington, Barry (2014) The Metrolink Companion. Sigma Leisure. ISBN 978-1-85058-977-8
  • Young, Tony (2008). Tramways in Rochdale: Steam, Electric and Metrolink. Light Rail Transit Association. ISBN 978-0-948106-34-7.

KML is from Wikidata


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.