NZR LA class

The NZR LA class was a class of 4-4-0T steam locomotives used by the New Zealand Railways Department and the New Zealand Midland Railway Company. They were built by Nasmyth, Wilson and Company in 1887 for New Zealand Midland Railway Company, and were taken over by NZR in 1900, when the government acquired the incomplete Midland line. The designation also applies to the NZR 4-4-0T rebuilds of the Avonside L class of 1875 which were later reclassified LB after being rebuilt as 4-4-2Ts.[1]

NZR LA Class
New Zealand Midland Railway Co. NO 3 (NZR LA 312) at Stillwater Junction during the opening of the Midland Railway between Greymouth and Stillwater, 1889.
Type and origin
Power typeSteam
BuilderNasmyth, Wilson & Co.
Serial number311–312, 315, 322–323
Build date1887
Total produced5
Specifications
Configuration:
  Whyte4-4-0T; later 4-4-2T
Gauge3 ft 6 in (1,067 mm)
Driver dia.45 in (1.143 m)
Length26 ft 2 in (7.98 m)
Adhesive weight19.2 long tons (19.5 tonnes; 21.5 short tons)
Loco weight26.6 long tons (27.0 t; 29.8 short tons)
Firebox:
  Firegrate area
9.8 sq ft (0.91 m2)
Boiler pressure140 lbf/in2 (965 kPa)
Heating surface506 sq ft (47.0 m2)
CylindersTwo, outside
Cylinder size12 in × 18 in (305 mm × 457 mm)
Performance figures
Tractive effort6,450 lbf (28.7 kN)
Career
NumbersNZMRC 1–5
NZR 310–314
Retired1924–1926

The Midland LA class

The New Zealand Midland Railway Company ordered five 4-4-0T tank locomotives from Nasmyth Wilson in 1887 for use on their planned railway between Nelson, Greymouth and Christchurch. These locomotives were built to a standard Nasmyth Wilson design for export, and had double-skinned cab roofs for work in tropical climates. The first three locomotives were named Reefton, Christchurch and Nelson on entry into service; the other two locomotives never carried names.

The locomotives, numbered as NZMRC NO's 1–5, were responsible for running all trains over the Midland Railway between Reefton, Stillwater and Lake Brunner, as well as running NZMRC trains over the NZR line between Stillwater and Greymouth. Following the failure of the NZMRC and its takeover by the NZR, the locomotives were renumbered as LA 310–315. Now based at Greymouth, the engines remained in service until the first withdrawal began in 1920.

Withdrawal

The first Midland LA to be withdrawn was LA 311 (formerly NZMRC NO 2) in March 1920. The remaining locomotives were withdrawn between 1924 and 1928. Two of the withdrawn locomotives were sold for industrial service; LA 311 was sold to the Auckland Farmers Freezing Company in 1920 and worked as a shunting locomotive at their Moerewa works between 1920 and 1934, while LA 314 was sold to the New Forest Sawmilling Company at Ngahere where it worked as the mill's 'yard engine' transferring wagons between the NZR station and the sawmill between 1926 and 1950.

The remaining locomotives, LA's 310, 312 and 313, were written off but not scrapped. Instead, at least one, LA 312, was dumped at the Omoto locomotive dump in 1929. The remains of LA 312 were salvaged for preservation in 2006 and are now in storage pending restoration to working order.

The NZR rebuilds

In 1893–94, NZR decided to rebuild three Avonside L class 2-4-0T tank locomotives as 4-4-0T tank locomotives. The conversion, classified by the NZR as the LA class, did not address the limited fuel capacity, and all further rebuilds were rebuilt as 4-4-2Ts.

References

Bibliography

  • Millar, Sean (2011). The NZR Steam Locomotive. Wellington: New Zealand Railway and Locomotive Society. ISBN 978-0-908573-89-9.
  • Palmer, A. N.; Stewart, W. W. (1965). Cavalcade of New Zealand Locomotives. Wellington: A H. & A W. Reed. ISBN 978-0-207-94500-7.
  • Stewart, W. W. (1974). When Steam was King. Wellington: A. H. & A. W. Reed Ltd. ISBN 978-0-589-00382-1.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.