Nuclear power in Germany
Nuclear power in Germany accounted for 11.63% of electricity supply in 2017[2] compared to 22.4% in 2010.[3][4] German nuclear power began with research reactors in the 1950s and 1960s with the first commercial plant coming online in 1969. As of 2017, the share of nuclear power in the electricity sector in the country is decreasing following the decision of a complete nuclear phase-out by the next decade.
Nuclear power has been a topical political issue in recent decades, with continuing debates about when the technology should be phased out. The anti-nuclear movement in Germany has a long history dating back to the early 1970s, when large demonstrations prevented the construction of a nuclear plant at Wyhl. The topic received renewed attention at the start of 2007 due to the political impact of the Russia-Belarus energy dispute and in 2011 after the Fukushima nuclear accident in Japan.[5] Within days of the March 2011 Fukushima Daiichi nuclear disaster, large anti-nuclear protests occurred in Germany. Protests continued and, on 29 May 2011, Merkel's government announced that it would close all of its nuclear power plants by 2022.[6][7]
Eight of the seventeen operating reactors in Germany were permanently shut down following Fukushima. Chancellor Angela Merkel said the nuclear power phase-out, previously scheduled to go offline as late as 2036, would give Germany a competitive advantage in the renewable energy era, stating, "As the first big industrialized nation, we can achieve such a transformation toward efficient and renewable energies, with all the opportunities that brings for exports, developing new technologies and jobs". Merkel also pointed to Japan's "helplessness"—despite being an industrialized, technologically advanced nation—in the face of its nuclear disaster.[8] The nuclear electricity production was primarily replaced with coal electricity production and electricity importing. One study found that the nuclear phase-out caused $12 billion in social costs per year, primarily due to increases in mortality due to exposure to pollution from fossil fuels.[9]
German engineering-industry giant Siemens announced a complete withdrawal from the nuclear industry in 2011, as a response to the Fukushima nuclear disaster.[10][11] Remaining nuclear operating companies in Germany are E.ON, RWE, and EnBW.
History
German publications of the 1950s and 1960s contained criticism of some features of nuclear power including its safety. Nuclear waste disposal was widely recognized as a major problem, with concern publicly expressed as early as 1954. In 1964, one author went so far as to state "that the dangers and costs of the necessary final disposal of nuclear waste could possibly make it necessary to forego the development of nuclear energy".[12]
As in many industrialised countries, nuclear power in Germany was first developed in the late 1950s. Only a few experimental reactors went online before 1960, and an experimental nuclear power station in Kahl am Main opened in 1960. All of the German nuclear power plants that opened between 1960 and 1970 had – like otherways in the whole world – a power output of less than 1,000 MW and have now all closed down. The first almost fully commercial nuclear power plant started operating in 1969: Obrigheim operated until 2005, where it was shutdown by phaseout decision of the government. The first station with a power output of more than 1000 MW each were the two units of Biblis Nuclear Power Plant in 1974 and 1976.
A closed nuclear fuel cycle was planned, starting with mining operations in the Saarland and the Schwarzwald; uranium ore concentration, fuel rod filling production in Hanau; and reprocessing of the spent fuel in the never-built nuclear fuel reprocessing plant at Wackersdorf. The radioactive waste was intended to be stored in a deep geological repository, as part of the Gorleben long-term storage project. Today, there is a "ergebnisoffener" searching process over the whole country for the storage of the irradiated nuclear fuel.
In the early 1960s there was a proposal to build a nuclear power station in West Berlin, but the project was dropped in 1962. Another attempt to site a reactor in a major city was made in 1967, when BASF planned to build a nuclear power station on its ground at Ludwigshafen, to supply process steam. The project was withdrawn by BASF.[12]
In 1959, 15 municipal electric companies established the Association of Experimental Reactor GmbH (Arbeitsgemeinschaft Versuchsreaktor, AVR) to demonstrate the feasibility and viability of a gas-cooled, graphite-moderated high temperature reactor (HTGR). In the early 1960s, it started the design and construction of AVR at the Jülich Research Centre. First criticality was attained in 1966, and the AVR was in operation for more than 22 years. Despite the fuel feed and discharge system showed excellent availability, the AVR was shut down for political reasons in 1988. The AVR was designed to breed uranium-233 from thorium-232. Thorium-232 is over 100 times as abundant in the Earth's crust as uranium-235.
In 1965, before the AVR started operation, a basic design for a commercial demonstration HTGR reactor using thorium was started, the THTR-300. The HTGR, rated at 300 MWe, synchronized with the grid in 1985. Six months later a fuel pebble became lodged in the reactor core. After repairs, it was restarted and operated from July 1986, reaching full power in September 1986. It operated until September 1988, and was shutdown in September 1989.
By 1992, a group of German and Swiss firms planned to proceed with construction of a HTR-500, a design that made considerable use of the THTR-300 technology. But the by then politically hostile environment halted any effort. The technology is now pursued by the Chinese as the HTR-PM.
In the early 1970s, large public demonstrations prevented the construction of a nuclear plant at Wyhl. The Wyhl protests were an example of a local community challenging the nuclear industry through a strategy of direct action and civil disobedience. Police were accused of using unnecessarily violent means. Anti-nuclear success at Wyhl inspired nuclear opposition throughout Germany and elsewhere.[13]
The Rheinsberg Nuclear Power Plant was the first (mostly experimental) nuclear power plant in East Germany. It was of low power and operated from 1966 until 1990. The second to be commissioned, the Greifswald Nuclear Power Plant, was planned to house eight of the Russian 440 MW VVER-440 reactors. The first four went online between 1973 and 1979. Greifswald 5 operated for less than a month before it was closed, the other three were cancelled during different stages of their build-up. In 1990, during the German reunification, all eastern Germany nuclear power plants were closed due to flaws in safety standards. The Stendal Nuclear Power Plant in East Germany was to be the largest nuclear power station in Germany. After German reunification, and due to concerns about the Soviet design, construction was stopped and the power station was never completed. In the 1990s the three cooling towers which had been erected were demolished, and the area is an industrial estate today.
Operators
As of 2016 the nuclear power plant operators in Germany comprise:
Construction companies
In September 2011, Siemens, which had been responsible for constructing all 17 of Germany's existing nuclear power plants, announced that it would exit the nuclear sector following the Fukushima disaster and the subsequent changes to German energy policy. It will no longer build nuclear power plants anywhere in the world. The company’s chairman, Peter Löscher, said that "Siemens was ending plans to cooperate with Rosatom, the Russian state-controlled nuclear power company, in the construction of dozens of nuclear plants throughout Russia over the coming two decades".[11][14] Peter Löscher has supported the German government's planned energy transition to renewable energy technologies, calling it a "project of the century" and saying Berlin's target of reaching 35% renewable energy sources by 2020 was feasible.[15]
An October 2016 story in the Süddeutsche Zeitung reports that Finnish operator TVO is calling on Siemens to take financial responsibility for the completion of Unit 3 of the Olkiluoto Nuclear Power Plant in Finland, because its project partner, the French-German Areva Group, is being broken up by the French government. Unit 3, an EPR, has a history of delays and its future profitability is in doubt.[16][17]
Accidents
Date | Location | Description | Cost (in 2006 US$ million) |
---|---|---|---|
1975 | Greifswald, East Germany | A situation near core meltdown occurred at the Greifswald plant: Three out of six cooling water pumps were switched off for a failed test. A fourth pump broke down and control of the reactor was lost. 10 fuel elements were damaged before recovery | 443 |
4 May 1986 | Hamm-Uentrop, West Germany | Operator actions to dislodge damaged fuel elements at the thorium high-temperature reactor released radiation to 4 km2 surrounding the facility | 267 |
17 December 1987 | Hessen, West Germany | Stop valve failed at the Biblis Nuclear Power Plant, with contamination of local area | 13 |
Closures and phase-out
During the chancellorship of Gerhard Schröder, the social democratic-green government had decreed Germany's final retreat from using nuclear power by 2022, but the phase-out plan was initially delayed in late 2010, when during chancellorship of center-right Angela Merkel the coalition conservative-liberal government decreed a 12-year delay of the schedule.[20] This delay provoked protests, including a human chain of 50,000 from Stuttgart to the nearby nuclear plant in Neckarwestheim.[21] Anti-nuclear demonstrations on 12 March attracted 100,000 across Germany.[22]
On 14 March 2011, in response to the renewed concern about the use of nuclear energy the Fukushima incident raised in the German public and in light of upcoming elections in three German states, Merkel declared a 3-month moratorium on the reactor lifespan extension passed in 2010.[23] On 15 March, the German government announced that it would temporarily shut down 8 of its 17 reactors, i.e. all reactors that went online before 1981.[24] Former proponents of nuclear energy such as Angela Merkel, Guido Westerwelle, and Stefan Mappus changed their positions,[25] yet 71% of the population believed that to be a tactical manoeuvre related to upcoming state elections.[26] In the largest anti-nuclear demonstration ever held in Germany, some 250,000 people protested on 26 March under the slogan "heed Fukushima – shut off all nuclear plants".[27]
On 30 May 2011, the German government announced a plan to shut all nuclear reactors by 2022.[28] Environment Minister Norbert Röttgen stated of the decision, "It's definite. The latest end for the last three nuclear power plants is 2022. There will be no clause for revision".[5] Prior to the decision, Germany's renewable energy sector already provided 17% of Germany's electricity and employed about 370,000.[8] The decision to phase-out nuclear power has been called the swiftest change of political course since unification.[29] Only a year earlier Angela Merkel's government overturned a decade-old decision to close all nuclear plants by 2022.[29]
Physicist Amory Lovins has said: "Chancellor Merkel was so shocked by Fukushima that she turned Germany’s energy focus from nuclear (of which she closed 41% and will close the rest within a decade) to efficiency and renewables. That’s supported by three-fourths of Germans and opposed by no political party".[30]
Merkel stated that Germany "[does not] only want to renounce nuclear energy by 2022, we also want to reduce our CO2 emissions by 40 percent and double our share of renewable energies, from about 17 percent today to then 35 percent". The chancellor noted the "helplessness" of Japan to manage the Fukushima Daiichi nuclear disaster. Merkel asserted that Germany's energy policy would be safe, reliable, and independent from imports, with affordable prices for both consumers and industry. Increased investment in natural gas plants would provide a backup to ensure consistency for those times when the solar, wind and hydroelectric sources did not meet demand.[8]
At the time of the Japanese Fukushima disaster, Germany was getting just under a quarter of its electricity from nuclear power.[8] After the Fukushima disaster, the following eight German nuclear power reactors were declared permanently shut down on 6 August 2011: Biblis A and B, Brunsbuettel, Isar 1, Kruemmel, Neckarwestheim 1, Philippsburg 1 and Unterweser.[31]
Some German manufacturers and energy companies have criticized the phase-out plans, warning that Germany could face blackouts.[32] While this did not happen[33] there has been an increase in voltage fluctuations which has damaged industrial facilities and caused them to install voltage regulators.[34] A 2020 study by the Haas School of Business found that the lost nuclear electricity production has been replaced primarily by coal-fired production and net electricity imports. The social cost of this shift from nuclear to coal is approximately twelve billion US dollars per year, mostly from the eleven hundred additional deaths associated with exposure to the local air pollution emitted when burning fossil fuels.[35] Swedish Energy company Vattenfall went in front of the World Bank's International Centre for Settlement of Investment Disputes (ICSID) to seek compensation from the German government for the premature shut-down of its nuclear plants.[36][37]
On 5 December 2016, the Federal Constitutional Court (Bundesverfassungsgericht) ruled that the nuclear plant operators affected by the accelerated phase-out of nuclear power following the Fukushima disaster are eligible for "adequate" compensation. The court found that the nuclear exit was essentially constitutional but that the utilities are entitled to damages for the "good faith" investments they made in 2010. The utilities can now sue the German government under civil law. E.ON, RWE, and Vattenfall are expected to seek a total of €19 billion under separate suits.[38][39][40] Six cases were registered with courts in Germany, as of 7 December 2016.[41][42]
As of March 2019, only seven nuclear plants have been left in operation and should be scheduled to be shut down and dismantled.[43]
Radioactive waste management
Nuclear power plants take years to be dismantled and contaminated sites have to be cleared and declared free of radiation.[43] One estimate puts the cost of dismantling Germany's nuclear reactor sites at €18 billion, not counting the cost of radioactive waste disposal.[44]
No country has permanent storage sites for nuclear energy waste and spent nuclear fuel is stockpiled in temporary locations.[45] In Germany, heavily contaminated spent fuel rods are stored in Castor containers on several temporary sites around the country.[44]
Germany is preparing the former iron-ore mine Schacht Konrad in Salzgitter as a national facility for the permanent disposal of low- to medium-grade radioactive waste materials.[44][43]
Nuclear waste liability buyout 2016
On 19 October 2016, the German cabinet (Bundeskabinett) finalized a deal with nuclear power plant operators E.ON, EnBW, RWE, and Vattenfall over long-term nuclear waste disposal. Under the agreement, the four operators are freed of responsibility for storing radioactive waste – that responsibility is instead transferred to the state. In return, the operators will pay a total of €17.4 billion into a state-administered fund to finance the interim and final storage of nuclear waste. They will also pay an additional "risk surcharge" of €6.2 billion (35.5%) to cover the eventuality that costs exceed current projections and that the interest accrued by the fund is lower than expected. The operators will be responsible for decommissioning and deconstructing their own nuclear power plants, as well as preparing their radioactive waste for final storage.
Critics, including the German Renewable Energy Federation and BUND, claim the total of €23.6 billion would prove insufficient and that future taxpayers will carry the risk.[46]
The draft law is available in German.[47] It is due to be enacted in early 2017.
Role for coal and renewables
Since nuclear power generated almost a third of the electricity in Germany, many thought that the country would have to import energy as the nuclear phase-out progressed. At first, Germany was still selling more electricity than it bought, due to its renewable energy industry.[48] Renewable energy supplied a record 20.8% of Germany’s electricity in the first half of 2011, from wind power, solar power, biomass and hydro. Germany installed over 7,400 MW of solar in 2010 and another 7,000 MW was added in 2011. Solar and wind capacity is expected to grow by 32% from 2012–2013. Since 2011 the price of electricity has risen by 20%[49] and as of 2018 the cost of electricity in Germany is the 10th most expensive compared to other countries in the world.[50]
Germany has combined the phase-out with an initiative for renewable energy and wants to increase the efficiency of fossil power plants in an effort to reduce the reliance on coal. According to the former German Minister for the Environment Jürgen Trittin, in 2020, this would cut carbon dioxide emissions by 40 percent compared with 1990 levels. Germany has become one of the leaders in the efforts to fulfill the Kyoto protocol. Critics of the German policy have called it a mistake to abandon nuclear power, claiming the only alternative to nuclear power was coal and abandoning nuclear power was therefore contradictory to the goal of lowering CO2 emissions.[51]
As a result of its efforts and subsidies, Germany has developed advanced non-conventional renewable energy for electricity generation, particularly in photovoltaic and wind turbine installations. At the same time, Germany continues to rely heavily on coal power, with usage increasing to offset the phase-out of nuclear energy.[52]
The German nuclear industry has insisted that its shutdown would cause major damage to the country's industrial base. In 2012, member firms of the Verband der Industriellen Energie- und Kraftwirtschaft (VIK) reported power failures of several seconds duration, combined with a rise in frequency fluctuations. These were reportedly caused by network overloads due to the shutdown of nuclear power plants, and an increase in wind power generation.[53] VIK also fear that industrial control units will be damaged by outages.
The cost of replacing Germany's nuclear power generation with renewable energy has been officially estimated by the German Ministry of Economics at about €0.01/kWh (about €55 billion for the next decade), on top of the €13 billion per year already devoted to subsidizing renewables. However, unofficial estimates of the ministry, and of the Rhenish-Westphalian Institute for Economic Research (RWI), German Energy Agency (DENA), Federation of German Consumer Organizations (VZBV), and the government-owned development bank (KfW), put the cost several times higher, at about €250 billion ($340 B) over the next decade.[54][55]
In March 2013, the administrative court for the German state of Hesse ruled that a three-month closure imposed by the government on RWE's Biblis A and B reactors as an immediate response to Fukushima Daiichi accident was illegal.[56] The state ministry of the environment acted illegally in March 2011, when an order was issued for the immediate closure of the Biblis units. RWE complied with the decree by shutting Biblis-A immediately, however as the plants were in compliance with the relevant safety requirements, the German government had no legal grounds for shutting them. The court ruled that the closure notice was illegal because RWE had not been given sufficient opportunity to respond to the order.
See also
References
- Annika Breidthardt (30 May 2011). "German government wants nuclear exit by 2022 at latest". Reuters.
- https://pris.iaea.org/PRIS/CountryStatistics/CountryDetails.aspx?current=DE retrieved Jan 2019
- "Archived copy". Archived from the original on 7 February 2012. Retrieved 6 February 2012.CS1 maint: archived copy as title (link)
- Baetz, Juergen (15 October 2012). "Germans face hefty bill to end nuclear power". Associated Press. Retrieved 10 November 2012.
- "Germany: Nuclear power plants to close by 2022". BBC. 30 May 2011. Retrieved 30 May 2011.
- Caroline Jorant (July 2011). "The implications of Fukushima: The European perspective". Bulletin of the Atomic Scientists. p. 15.
- Knight, Ben (15 March 2011). "Merkel shuts down seven nuclear reactors". Deutsche Welle. Retrieved 15 March 2011.
- Baetz, Juergen (30 May 2011). "Germany Decides to Abandon Nuclear Power by 2022". Associated Press. Retrieved 30 May 2011.
- Jarvis, Stephen; Deschenes, Olivier; Jha, Akshaya (2019). "The Private and External Costs of Germany's Nuclear Phase-Out". Cite journal requires
|journal=
(help) - John Broder (10 October 2011). "The Year of Peril and Promise in Energy Production". New York Times.
- "Siemens to quit nuclear industry". BBC News. 18 September 2011.
- Wolfgang Rudig (1990). Anti-nuclear Movements: A World Survey of Opposition to Nuclear Energy, Longman, p. 63.
- Wolfgang Rudig (1990). Anti-nuclear Movements: A World Survey of Opposition to Nuclear Energy, Longman, pp. 130–135.
- John Broder (10 October 2011). "The Year of Peril and Promise in Energy Production". New York Times.
- "Siemens to quit nuclear industry". BBC News. 18 September 2011.
- "How Siemens could become a nuclear company again". Clean Energy Wire (CLEW). Berlin, Germany. 26 October 2016. Retrieved 1 November 2016.
- Kläsgen, Michael; Büschemann, Karl-Heinz (25 October 2016). "Kernenergie: Wie Siemens doch wieder zum Atomkonzern werden könnte" [Nuclear power: How Siemens could become an nuclear enterprise again]. Süddeutsche Zeitung (in German). Munich, Germany. Retrieved 1 November 2016.
- Sovacool, Benjamin K. (August 2010). "A Critical Evaluation of Nuclear Power and Renewable Electricity in Asia". Journal of Contemporary Asia. 40 (3): 393–400. doi:10.1080/00472331003798350.
- Benjamin K. Sovacool (2009). The Accidental Century – Prominent Energy Accidents in the Last 100 Years Archived 21 August 2012 at the Wayback Machine
- "Germany Reconsiders Reactor Lifespan Extensions". Der Spiegel. 14 March 2011. Retrieved 14 March 2011.
- "Nuclear safety worries spread to Europe". Guardian UK. 12 March 2011. Retrieved 14 March 2011.
- "Nuclear power? No thanks (again)". The Economist. 15 March 2011. Retrieved 17 March 2011.
- "AKW Neckarwestheim muss vom Netz". Der Spiegel (in German). 14 March 2011. Retrieved 14 March 2011.
- "Germany to shut down seven reactors temporarily". Hurriyet Daily News and Economic Review. 15 March 2011. Retrieved 15 March 2011.
- "Nuclear backlash forces Merkel to rethink energy policy". Germany: Deutsche Welle. 14 March 2011. Retrieved 18 March 2011.
- "Umfrage: Wähler strafen Union für Atomkurs ab". Der Spiegel (in German). 23 March 2011. Retrieved 26 March 2011.
- "Rekord-Demos in Deutschland. Atomstreit trifft Koalition mit voller Wucht". Der Spiegel (in German). 26 March 2011. Retrieved 26 March 2011.
- "German govt wants nuclear exit by 2022 at latest". Reuters. 30 May 2011. Retrieved 30 May 2011.
- "German Energy: Nuclear? Nein, danke". The Economist. The Economist Newspaper Limited. 399 (8736): 38–40. 4–10 June 2011.
- Amory Lovins (2011). "Soft Energy Paths for the 21st Century". Archived from the original on 24 December 2013.
- IAEA (2011 Highlights). "Power Reactor Information System". Check date values in:
|date=
(help) - "Nuclear Phaseout Is an 'Historic Moment'". Der Spiegel. 30 May 2011.
- Alexander Ochs (16 March 2012). "The End of the Atomic Dream: One Year After Fukushima, the Shortfalls of Nuclear Energy Are Clearer Than Ever". Worldwatch.
- "Grid Instability Has Industry Scrambling for Solutions". 16 August 2012.
- "The Private and External Costs of Germany's Nuclear Phase-Out" (PDF). Energy Institute at Haas. January 2020. Retrieved 28 November 2020.
- http://corporate.vattenfall.com/press-and-media/news/2014/why-vattenfall-is-taking-germany-to-court/
- http://www.spiegel.de/wirtschaft/unternehmen/vattenfall-klage-eu-unterstuetzt-deutschland-a-1054667.html
- "German utilities eligible for "adequate" nuclear exit compensation". Clean Energy Wire (CLEW). Berlin, Germany. 6 December 2016. Retrieved 6 December 2016.
- "The thirteenth amendment to the Atomic Energy Act is for the most part compatible with the Basic Law" (Press release). Karlsruhe, Germany: Bundesverfassungsgericht. 6 December 2016. Retrieved 6 December 2016.
- "German utilities win compensation for nuclear phaseout". Deutsche Welle (DW). Bonn, Germany. 5 December 2016. Retrieved 6 December 2016. Provides a history of the nuclear exit.
- "Nuclear plant operators continue lawsuits". Clean Energy Wire (CLEW). Berlin, German. 8 December 2016. Retrieved 8 December 2016.
- "Atomausstieg: Konzerne klagen weiter – auf Auskunft" [Nuclear exit: corporations sue further – for information]. Der Tagesspiegel (in German). Berlin, German. Retrieved 8 December 2016.
- Wecker, Katharina (3 March 2019). "Germany's atomic phase-out: How to dismantle a nuclear power plant | DW | 11 March 2019". DW.COM. Retrieved 28 March 2019.
- Zimmermann, Nils (26 April 2016). "Nuclear reactor sites: Dismantle or fence off? | DW | 26 April 2016". DW.COM. Retrieved 28 March 2019.
- Oroschakoff, Kalina; Solletty, Solletty (19 July 2017). "Burying the atom: Europe struggles to dispose of nuclear waste". Politico. Retrieved 28 March 2019.
- Wettengel, Julian (19 October 2016). "German utilities buy out of nuclear waste liability for 23.6 bln euros". Clean Energy Wire (CLEW). Berlin, Germany. Retrieved 21 October 2016.
- Entwurf eines Gesetzes zur Neuordnung der Verantwortung der kerntechnischen Entsorgung [Draft law for the reorganization of the responsibility of nuclear disposal] (PDF) (in German). Berlin, Germany: Federal Ministry for Economic Affairs and Energy (BMWi). Archived from the original (PDF) on 22 October 2016. Retrieved 21 October 2016.
- "Germany's Shift to Renewables is Paying Off". SustainableBusiness.com. 30 September 2011.
- "What German households pay for power". Clean Energy Wire. 1 April 2019.
- "Cost Of Electricity By Country". www.worldatlas.com. 28 September 2018.
- "Germany split over green energy". BBC News. 25 February 2005. Retrieved 19 July 2008.
- Nelles, Roland (21 March 2007). "Germany Plans Boom in Coal Power Plants". Bloomberg Businessweek. Retrieved 30 May 2011.
- http://www.aggbusiness.com/articles/business-news/companies-de-energised-by-blackouts-3456/%5B%5D
- Neubacher, Alexander (27 July 2011). "The Latte Fallacy: German Switch to Renewables Likely to Be Expensive". Der Spiegel. Retrieved 22 September 2011.
- Nicola, Stefan (19 September 2011). "KfW to Provide 100 Billion Euros to Aid German Energy Transition". Bloomberg L.P. Retrieved 22 September 2011.
- http://www.world-nuclear-news.org/NP-Court_rules_Biblis_closure_unlawful-2802137.html