Pasir Ris Bus Interchange is a bus interchange located at Pasir Ris in the eastern part of Singapore. It is located off Pasir Ris Drive 3,[1] adjacent to Pasir Ris MRT station and near White Sands Shopping Centre. This bus interchange also serves as a pick-up/drop-off point for shuttle buses ferrying NSF men heading to the SAF Ferry Terminal for their shuttle ferry to Pulau Tekong.

Pasir Ris Bus Interchange
巴西立巴士转换站
Pertukaran Bas Pasir Ris
Public bus
Pasir Ris Bus Interchange in September 2006
Location501 Pasir Ris Drive 3, Singapore 519490
Owned byLand Transport Authority
Operated byGo-Ahead Singapore Pte Ltd (Go-Ahead Group plc)
Bus routes4 (SBS Transit Ltd)
11 (Go-Ahead Singapore Pte Ltd)
Bus stands5 (Boarding)
2 (Alighting)
Bus operatorsSBS Transit Ltd
Go-Ahead Singapore Pte Ltd
Connections EW1  CR5   CP1  Pasir Ris
Construction
Structure typeAt-grade
Disabled accessAccessible alighting/boarding points
Accessible public toilets
Graduated kerb edges
Tactile guidance system
History
Opened10 December 1989 (1989-12-10)
Closed2021 (2021)
Key dates
10 December 1989Commenced operations

History

The interchange was built at a cost of S$2.7 million[2] and opened on 10 December 1989, along with the Eunos Bus Interchange. The interchange provides bus connections around the Pasir Ris estate. Bus Service 403 was the first bus route in Pasir Ris from 1979, which previously terminated at Tampines Road terminus before being amended to the current route of looping at Pasir Ris Road.[1]

Bus Contracting Model

Under the new bus contracting model, all the bus routes operating in the interchange were split into 4 route packages - Bus Service 5 under Bukit Merah, Bus Service 58 under Serangoon-Eunos, Bus Services 21 and 88 under Bishan-Toa Payoh and the rest under the Loyang Bus Package operated by Go-Ahead Singapore. Services under the Loyang Bus Package started operations on 18 September 2016.[3]

Redevelopment

Redevelopment of Pasir Ris Bus Interchange has started since 2019. A Temporary Bus Interchange will be completed by 2021, after which the western half of the old bus interchange will be demolished to facilitate the construction of the Pasir Ris Integrated Transport Hub and Pasir Ris Rail Turnback, which will be completed by 2027, two years before the Cross Island MRT line starts operations.[4][5][6]

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.