Richmond Hill GO Station
Richmond Hill GO Station is a train and bus station in the GO Transit network located in Richmond Hill, Ontario, Canada. It was the northern terminus of the Richmond Hill line train service from the service's inception in 1982 until the opening of Gormley GO Station on December 5, 2016.
Richmond Hill | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | 6 Newkirk Road Richmond Hill, Ontario Canada | ||||||||||||
Coordinates | 43°52′29″N 79°25′35.4″W | ||||||||||||
Owned by | Metrolinx | ||||||||||||
Platforms | 1 side platform | ||||||||||||
Tracks | 3 | ||||||||||||
Connections | York Region Transit | ||||||||||||
Construction | |||||||||||||
Structure type | Station building with public washroom and waiting room | ||||||||||||
Parking | 1,229 spaces | ||||||||||||
Bicycle facilities | yes | ||||||||||||
Disabled access | Yes | ||||||||||||
Other information | |||||||||||||
Station code | GO Transit: 00062 | ||||||||||||
Fare zone | 50 | ||||||||||||
History | |||||||||||||
Opened | May 1, 1978 | ||||||||||||
Services | |||||||||||||
| |||||||||||||
|
Of the all the Richmond Hill line stations, this is the only station that has a reduced length platform which accommodates only up to an L8 consist, a trainset consisting of eight Bombardier BiLevel Coaches and at least one locomotive. Beginning in the spring of 2015, the platform was scheduled to be extended to allow 12-car trains. A pedestrian bridge over Major Mackenzie Drive was built, and a new station building was planned but has not been built.[1] The train layover facility in Richmond Hill was opened in 2014.[2]
History
The original Richmond Hill railway station was a single storey clapboard building, located on the north side of Centre Street East, just a short distance north of the current station. Built in 1906 by the James Bay Railway, the station was closed by Canadian National Railway in 1968 and the building was relocated in 1979 to Richmond Green, at Elgin Mills Road and Leslie Street, to serve as a clubhouse for local minor soccer teams.[3]
The Richmond Hill GO Station will become a terminus for the planned Viva Silver buses, once that service begins operation in 2022.
Connecting buses
York Region Transit:
- 4 Major Mackenzie (West)
- 25 Major Mackenzie (East)
- 82 Valleymede
- 86 Newkirk-Red Maple
GO Transit:
References
- "Modernizing Stations – Richmond Hill GO Station". GO Transit. Archived from the original on March 4, 2016.
- Ministry of Transportation (December 1, 2014). "New GO Train Station on the Way for York Region". Newsroom. Ontario. Retrieved May 17, 2016.
Construction of a new GO Station in Gormley is underway, extending the Richmond Hill line north to Stouffville Road.
- Robert M. Stamp (July 1991). "Rails through Richmond Hill: The Belated Arrival of the Age of Steam". Early Days in Richmond Hill. Archived from the original on March 25, 2016.
- 61 Richmond Hill GO Train and Bus Schedule