Shahpurkandi dam project
The Shahpurkandi Dam project is located on the Ravi River in Pathankot district, Punjab, India, downstream from the existing Ranjit Sagar Dam. The power houses will be constructed on Hydel Channel, which is downstream from Shahpurkandi Dam. The water released by Ranjit Sagar Dam is to be utilised for generating power for this project. The project will generate electricity of up to 206MW and provide irrigation to Punjab (5,000 Ha) and Jammu and Kashmir (32,173 Ha). The construction of the dam is as per the framework of the Indus Water Treaty regarding sharing of rivers between India and Pakistan.[1][2]
Shahpurkandi Dam Project | |
---|---|
Official name | Shahpurkandi Dam |
Country | India |
Location | Pathankot, Punjab |
Purpose | Power, irrigation |
Status | Under construction |
Construction began | 2014 |
Construction cost | ₹2715.70 Crore in Feb 2018 |
Owner(s) | Water Resources Department Punjab |
Dam and spillways | |
Type of dam | Gravity |
Impounds | River Ravi |
Power Station | |
Turbines | 6 x 33 MW & 1 x 8 MW Kaplan-type |
Installed capacity | 206 MW |
The project comprises seven hydro-generating sets located in two power houses 6 nos. each of 33 MW and one of 8 MW. The gross storage of the balancing reservoir is 4.23 tmcft. The water released from the upstream Ranjit Sagar Dam, after generating electricity through the 600 MW power house during peak hours, is stored in the balancing reservoir to supply water to the irrigation canals continuously without any overflow into the downstream river.[3]
As per the decision of the government of Punjab, civil works of this project are to be executed by Punjab Water Resources Department, except Electro & Mechanical (E&M) works of the project, which are to be carried out by the PSPCL. Notification of Award for Electro-Mechanical (E&M) works of 206 MW Shahpurkandi Hydro Electric Project (HEP) on an EPC-mode basis to M/S BHEL, New Delhi, was issued on 29 January 2014.[4] The contract agreement was signed on 28 February 2014. A Turbine Model Test witness test was carried out from 18 to 27 September 2014 at Hydro Lab, BHEL, Bhopal.
References
- "Centre okays dam on Ravi, will cut water flow to Pakistan - Times of India". The Times of India. Retrieved 7 December 2018.
- "Punjab, J&K agree to restart Rs 2,793 crore Shahpur Kandi dam project - Times of India". The Times of India. Retrieved 7 December 2018.
- "Pb, J&K to restart Shahpur Kandi dam project". Retrieved 6 March 2020.
- http://www.bhel.com/press_release/press_pop.php?press_id=645