Soldier Creek Dam

Soldier Creek Dam is an earthen dam on the Strawberry River, located within the Uinta National Forest in southern Wasatch County, Utah, United States.

Soldier Creek Dam
LocationWasatch County, Utah, United States
Coordinates40°08′12″N 111°01′38″W
Construction began1970
Opening date1974
Owner(s)U.S. Bureau of Reclamation
Dam and spillways
Type of damEarthfill
ImpoundsStrawberry River
Height272 ft (83 m)[1]
Length1,290 ft (390 m)[1]
Elevation at crest7,612 ft (2,320 m)[1]
Reservoir
CreatesStrawberry Reservoir
Total capacity1,127,610 acre⋅ft (1.39089 km3)[2]
Catchment area170 sq mi (440 km2)[2]
Surface area17,300 acres (7,000 ha)[2]

Description

The dam forms Strawberry Reservoir, and is a principal feature of the Strawberry Valley Project, part of the Bonneville Unit of the Central Utah Project. The dam and reservoir were built and operated by the United States Bureau of Reclamation (USBR).[3]

Constructed between 1970 and 1974, the dam replaced the earlier Strawberry Dam, built slightly upstream of the current site from 1911–1913. The new dam increased the storage capacity of Strawberry Reservoir from 283,000 acre feet (0.349 km3) to more than 1,120,000 acre feet (1.38 km3).[4] The primary purpose of the dam is to store flows from the upper Strawberry River, as well as water diverted from eight tributaries of the Duchesne River, for diversion through the Strawberry Tunnel to supplement water supplies in the Utah Valley. Water from the Strawberry Tunnel eventually outlets into Sixth Water Canyon, the Diamond Fork (stream) and finally the Spanish Fork (river) before flowing into Utah Lake.[3][5]

Soldier Creek Dam is a zoned earthfill embankment 272 feet (83 m) high and 1,290 feet (390 m) long, with a structural volume of 3,206,000 cubic yards (2,451,000 m3).[1] Water releases from the dam are controlled by outlet works with a bypass capacity of 2,830 cu ft/s (80 m3/s). The dam controls runoff from a drainage area of 170 square miles (440 km2).[6]

See also

References

  1. "Soldier Creek Dam Dimensions". Central Utah Project–Bonneville Unit. U.S. Bureau of Reclamation. 2009-04-08. Retrieved 2012-08-17.
  2. "Soldier Creek Dam". National Performance of Dams Program. Stanford University. Retrieved 17 Aug 2012.
  3. "Central Utah Project - Bonneville Unit". Central Utah Project. United States Bureau of Reclamation. 27 May 2009. Retrieved 17 Aug 2012.
  4. Eastman, Adam R. "Central Utah Project Bonneville Unit" (PDF). Historic Reclamation Projects Book. United States Bureau of Reclamation. Retrieved 18 Aug 2012.
  5. Stene, Eric A. "The Strawberry Valley Project". Spanish Fork River Drainage. Retrieved 17 Aug 2012.
  6. "Soldier Creek Dam Hydraulics & Hydrology". Central Utah Project–Bonneville Unit. United States Bureau of Reclamation. 8 Apr 2009. Retrieved 17 Aug 2012.

Media related to Soldier Creek Dam at Wikimedia Commons


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.