Spalding Power Station
Spalding Power Station is a 860 MW gas-fired power station one mile north of Spalding on West Marsh Road close to the River Welland. The current site provides enough electricity for one million households.
Spalding Power Station | |
---|---|
Spalding Power Station Viewed from the south in June 2006 | |
Country | England |
Location | Lincolnshire, East Midlands |
Coordinates | 52.8078°N 0.1321°W |
Construction began | 2001 |
Commission date | 2004 |
Operator(s) | Intergen (Independent Generator) |
Thermal power station | |
Primary fuel | Natural gas |
Combined cycle? | Yes |
Power generation | |
Units planned | 1.8GW |
Nameplate capacity | 860 MW |
External links | |
Website | Spalding Energy |
Commons | Related media on Commons |
History
The power station, known as the Spalding Energy Facility, is sited on a former sugar beet site of British Sugar. It was first proposed in October 1996 and given approval by the DTI in November 2000. It is run by the Spalding Energy Company Ltd, a subsidiary of Intergen. Intergen is jointly owned by the Ontario Teachers' Pension Plan and China Huaneng Group.[1]
The electricity is supplied to Centrica under a 17-year deal agreed on 22 May 2002;[2][3] Centrica originally had 50% of the equity in the project in December 1999, and they supply the gas. It was the first power station to be project financed under the New Electricity Trading Arrangements in England and Wales, and funded by Barclays Capital.
It was Intergen's third UK power station after Rocksavage and Coryton. Intergen is based in Burlington, Massachusetts.
Construction began in March 2002. It opened in October 2004 at a cost of £425 million.[4]
Expansion
In 2016 InterGen won 15-year Capacity Market contract from the UK Government.[5] The expansion is on land adjacent to the existing power station. The new power plant is valued at £100 million. Construction of new 300MW facility is expected to be completed in June 2019.[6][7][8]
In October 2018 new Siemens F-class Open cycle gas turbine brought to the construction site.
Specification
It is powered by natural gas in a combined cycle (CCGT) plant. It features two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine. VOGT Power International is based in Louisville, Kentucky, and is owned by Babcock Power Inc. It uses two GE air-cooled turbo generators, rated at 296 MVA with a terminal voltage of 15.5 kV on each of the gas turbines. On the three-stage steam turbine is a Hitachi hydrogen-cooled turbogenerator, with a rating of 430 MVA and a terminal voltage of 24 kV. Actual power output depends on atmospheric conditions, such as temperature and humidity. 360 MW comes from the steam turbine generator, and 265 MW from each of the gas turbine generators.
See also
- Sutton Bridge Power Station
- Peterborough Power Station, also supplies electricity for Centrica
References
- "Operations". Intergen. Archived from the original on 26 April 2012.
- Centrica deal
- Centrica electricity
- Centrica
- "New gas pipeline link to Spalding Power Station?". Spalding Today. 11 October 2017.
- "InterGen Completes Financing on 300-Megawatt Spalding Energy Expansion Project in UK". 27 February 2018. Archived from the original on 17 October 2018.
- Spalding 300MW open cycle gas turbine (OCGT) power plant
- "Financial close for 300MW Spalding open cycle gas turbine". Energy Live News. 28 February 2018.