Tahoe–Pyramid Trail

The Tahoe–Pyramid Trail is a planned 114-mile (183 km) long-distance pedestrian and bicycle trail which will run between Lake Tahoe and Pyramid Lake, principally along the routing of the Truckee River.

History

The effort to construct a pedestrian path between the two connected lakes was started in November 2003, undertaken at first by Janet Phillips.[1] The organization responsible for planning and construction of the trail, Tahoe–Pyramid Bikeway, was formed in 2005 (the current name was adopted in 2018 to reflect its multi-use function).[2]

The western portion between Tahoe and the Reno–Sparks area opened to hikers on October 5, 2019,[1] completing the California section of the trail. As of October 2019, two sections are not complete: Vista Blvd to Mustang and USA Parkway to Wadsworth. The Porrtion to Mustang is blocked by landowner issues as of January 2018.[3]

References

  1. "Western portion of Tahoe-Pyramid Trail complete; set to open this Saturday". NBC. News 4. 3 October 2019. Retrieved 4 October 2019.
  2. "history of the trail". Tahoe–Pyramid Trail. Retrieved 4 October 2019.
  3. Janet, Phillips (18 January 2019). "Tahoe Pyramid Bikeway nearing completion: Phillips". Reno Gazette-Journal. Retrieved 5 October 2019.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.