Aqua Line (Pune Metro)
Aqua Line of the Pune Metro is the second line of the city's under-construction mass transit network. It will run from Ramwadi to Vanaz via Mangalwar Peth and Deccan Gymkhana.
Aqua Line | |
---|---|
Overview | |
Status | Under Construction |
Locale | Pune |
Termini | Ramwadi Vanaz |
Stations | 16 |
Service | |
Type | Rapid Transit |
System | Pune Metro |
Operator(s) | MahaMetro |
Technical | |
Line length | 14.66 km (9.11 mi) |
Character | Elevated |
Route
The elevated line will cover a distance of 14.66 km and will have 16 stations. It will connect with the Purple Line and Line 3 at the Civil Court interchange station. The maintenance depot for the Aqua Line will be located near the Vanaz station on the former garbage depot land.[1][2]
List of stations
Following is a list of stations on this route-
Aqua Line | |||||||
---|---|---|---|---|---|---|---|
# | Station name | Status | Connections | Layout | |||
English | Marathi | ||||||
1 | Vanaz | वनाझ | Under construction | None | Elevated | ||
2 | Anand Nagar | आनंदनगर | Under construction | None | Elevated | ||
3 | Ideal Colony | आयडियल कॉलनी | Under construction | None | Elevated | ||
4 | Nal Stop | नळ स्टॉप | Under construction | None | Elevated | ||
5 | Garware College | गरवारे महाविद्यालय | Under construction | None | Elevated | ||
6 | Deccan Gymkhana | डेक्कन जिमखाना | Under construction | None | Elevated | ||
7 | Chhatrapati Sambhaji Udyan | छत्रपती संभाजी उद्यान | Under construction | None | Elevated | ||
8 | PMC Bhavan | पुणे महानगरपालिका भवन | Under construction | None | Elevated | ||
9 | Civil Court | सिव्हिल कोर्ट | Under construction | Purple Line & Line 3 | Elevated | ||
10 | Mangalwar Peth | मंगळवार पेठ | Under construction | None | Elevated | ||
11 | Pune Railway Station | पुणे रेल्वे स्टेशन | Under construction | None | Elevated | ||
12 | Ruby Hall Clinic | रुबी हॉल क्लिनिक | Under construction | None | Elevated | ||
13 | Bund Garden | बंड गार्डन | Under construction | None | Elevated | ||
14 | Yerwada | येरवडा | Under construction | None | Elevated | ||
15 | Kalyani Nagar | कल्याणी नगर | Under construction | None | Elevated | ||
16 | Ramwadi | रामवाडी | Under construction | None | Elevated |
References
- "MahaMetro takes possession of 35 hectares of land for project". The Times of India. 27 April 2018. Retrieved 4 May 2018.
- "MahaMetro gets land for depot and multi-modal hub". The Times of India. 17 March 2018. Retrieved 4 May 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.