Purple Line (Pune Metro)

Purple Line of the Pune Metro is the first line of the city's under-construction mass transit network. It will run from PCMC Bhavan to Swargate. The 16.59-km line will be elevated till Range Hills with 9 stations and will further go underground up to Swargate with 5 stations.

Purple Line
Overview
StatusUnder Construction
LocalePune Metropolitan Region
TerminiPCMC Bhavan
Swargate
Stations14
Service
TypeRapid Transit
SystemPune Metro
Operator(s)MahaMetro
Technical
Line length16.59 km (10.31 mi)
CharacterElevated & Underground
Route map

PCMC Bhavan
Sant Tukaram Nagar
Nashik Phata
Kasarwadi
Phugewadi
Dapodi
Bopodi
Khadki
Range Hills
Shivaji Nagar
Civil Court
Budhwar Peth
Mahatma Phule Market
Swargate

Route

The line will go via Kasarwadi (Nashik Phata), Khadki and Shivajinagar.[1][2] The maintenance depot for the Purple Line will be located near the Range Hills station on the land acquired from the College of Agriculture.[3][4]

Construction

Soil testing and topographical surveys of the concerned areas started in late December 2016. Excavation work for erection of pillars started in early June, 2017. The construction of the first pillar was completed by October 2017 and construction work of up to ten pillars was underway. The first viaduct was completely erected by January 2018.[5] The first batch of tracks were laid between PCMC and Sant Tukaram Nagar in the second week of July 2019.[6]

List of Stations

Following is a list of stations on this route-

Purple Line
# Station Name Status Connections Layout
English Marathi
1 PCMC Bhavan पिंपरी-चिंचवड
महानगरपालिका भवन
Under Construction None Elevated
2 Sant Tukaram Nagar संत तुकाराम नगर Under Construction None Elevated
3 Nashik Phata नाशिक फाटा Under Construction None Elevated
4 Kasarwadi कासारवाडी Under Construction None Elevated
5 Phugewadi फुगेवाडी Under Construction None Elevated
6 Dapodi दापोडी Under Construction None Elevated
7 Bopodi बोपोडी Under Construction None Elevated
8 Khadki खडकी Under Construction None Elevated
9 Range Hills रेंज हिल्स Under Construction None Elevated
10 Shivaji Nagar शिवाजी नगर Under Construction  Line 3  (planned) Underground
11 Civil Court सिव्हिल कोर्ट Under Construction  Aqua Line  &  Line 3  Underground
12 Budhwar Peth बुधवार पेठ Under Construction None Underground
13 Mahatma Phule Market महात्मा फुले मंडई Under Construction None Underground
14 Swargate स्वारगेट Under Construction None Underground

References

  1. pune-metro-full-presentation. Slideshare.net (29 April 2010).
  2. Delhi Metro Rail Corporation to revise metro rail project report The Times Of India (27 September 2012).
  3. "College of Agriculture campus, a green lung, loses 119 acres to govt projects in three decades". The Indian Express. 2018-03-06. Retrieved 2018-05-04.
  4. "Pune Metro work hits top gear". Hindustan Times. 2017-12-23. Retrieved 2018-05-04.
  5. "MahaMetro Project Update". punemetrorail.org. Retrieved 20 July 2019.
  6. "MahaMetro lays tracks between PCMC and Sant Tukaramnagar". The Times of India. July 13, 2019. Retrieved 20 July 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.