Brooklin Paulista (São Paulo Metro)
Brooklin Paulista will be a monorail station of Line 17-Gold of ViaMobilidade, which is currently under construction, and will connect Line 9-Emerald to Congonhas Airport.
Brooklin Paulista | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Av. Jornalista Roberto Marinho × R. Vicente Leporace Campo Belo Brazil | |||||||||||
Coordinates | 23°37′46″S 46°40′25″W | |||||||||||
Owned by | Government of the State of São Paulo | |||||||||||
Operated by | ViaMobilidade (2022-2042) | |||||||||||
Platforms | Island platforms | |||||||||||
Construction | ||||||||||||
Structure type | Elevated | |||||||||||
Disabled access | Yes | |||||||||||
Other information | ||||||||||||
Station code | VJD | |||||||||||
History | ||||||||||||
Opening | June 2023 (estimated)[1] | |||||||||||
Services | ||||||||||||
|
Track layout | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Brooklin Paulista station will be placed in the crossing of Avenida Jornalista Roberto Marinho with Rua Vicente Leporace.
Initially, in the São Paulo Metro expansion plans, Line 17-Gold should be open until 2014, connecting with São Paulo–Morumbi station of Line 4-Yellow, at the time that Morumbi Stadium was considered one of the hosts for 2014 FIFA World Cup.
After that, the promise of opening of the line was delayed to 2016, end of 2017, 2018, December 2020, mid of 2021, and, currently, to 2nd semester of 2022.[2]
Station layout
P Platform level | ||||
Westbound | ← toward Morumbi | |||
Island platform, doors open on the left | ||||
Eastbound | toward Congonhas/Jardim Aeroporto → | |||
M | Mezzanine | Fare control, ticket office, customer service, Bilhete Único/BOM recharge machines | ||
G | Street level | Exit/entrance |
References
- Meier, Ricardo (27 November 2020). "Se não houver mais judicialização, obras da Linha 17 devem ser concluídas até junho de 2023". Metrô CPTM (in Portuguese). Retrieved 27 November 2020.
- "SP assina convênio para construção da Linha 17-Ouro do Metrô" (in Portuguese). Governo do Estado de São Paulo. June 30, 2010. Retrieved May 24, 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.