Line 5 (São Paulo Metro)

Line 5 (Lilac) (Portuguese: Linha 5–Lilás) is one of the six lines that make up the São Paulo Metro and one of the 13 lines that make up the Metropolitan Rail Transportation Network. The line transports about 600,000 people every business day, and since August 2018 it is operated by the private company ViaMobilidade.[2]

São Paulo Subway Line 5 (Lilac)
Overview
StatusOperational
Owner Government of the State of São Paulo
LocaleSão Paulo, Brazil
TerminiCapão Redondo
Chácara Klabin
Connecting lines
Stations17 operational
3 planned
Websitewww.viamobilidade.com.br
Service
TypeRapid transit
SystemSão Paulo Metro
Operator(s) ViaMobilidade (CCR)
Depot(s)Capão Redondo rail yard
Guido Caloi rail yard
Rolling stock
History
Commenced1998
OpenedOctober 20, 2002
Last extensionSeptember 28, 2018
Technical
Line length19.9 km (12.4 mi)
Track gauge1,435 mm (4 ft 8 12 in) standard gauge[1]
Electrification1,500 V DC catenary
Operating speed80 km/h (50 mph)
SignallingCBTC
Route map

Capão Redondo rail yard
Capão Redondo
Campo Limpo
Vila das Belezas
Giovanni Gronchi
Guido Caloi rail yard
Pinheiros River
Marginal Pinheiros
Santo Amaro
Largo Treze
Adolfo Pinheiro
Alto da Boa Vista
Borba Gato
Brooklin
Água Espraiada Brook
Av. Jornalista Roberto Marinho
Campo Belo
Eucaliptos
Moema
AACD-Servidor
Hospital São Paulo
Santa Cruz
Chácara Klabin
Santo Amaro Metro Station

The southern section of the line, between Largo Treze and Capão Redondo was completed in 2002 and was envisioned as a railway line of the CPTM called Line G. The project was transferred to the São Paulo Metro and renamed to Line 5 - Lilac. A northern extension connecting it with the rest of the São Paulo Metro network started construction 2009 with a completion deadline of 2013.[3] The project stalled due to issues with property acquisition and restarted in 2011.[4] The completion deadline of the extension has been delayed several times, but it has been reached on 8 April 2019.[5]

Identification placard at Capão Redondo station
Alstom train in Line 5

Stations

Operational

There are currently 17 operational stations on the Capão Redondo ↔ Chácara Klabin stretch:

Code Station Platforms Position Connections District
CPR Capão Redondo Side platforms Elevated Capão Redondo Bus Terminal Capão Redondo
CPL Campo Limpo Side platforms Elevated Campo Limpo Bus Terminal Campo Limpo
VBE Vila das Belezas Side platforms Elevated - Vila Andrade
GGR Giovanni Gronchi Side platforms Elevated João Dias Bus Terminal Vila Andrade
STA Santo Amaro Side platforms Elevated Santo Amaro
LTR Largo Treze Side platforms Underground Santo Amaro Bus Terminal Santo Amaro
APN Adolfo Pinheiro Side platforms Underground - Santo Amaro
ABV Alto da Boa Vista Island platform Underground - Santo Amaro
BGA Borba Gato Island platform Underground - Santo Amaro
BRK Brooklin Island platform Underground Diadema-Morumbi Metropolitan Corridor Campo Belo
CPB Campo Belo Island platform Underground (Future) Campo Belo
ECT Eucaliptos Side platforms Underground - Moema
MOE Moema Side platforms Underground - Moema
SER AACD-Servidor Side platforms Underground - Moema
HSP Hospital São Paulo Side platforms Underground - Vila Mariana
SCZ Santa Cruz Side platforms Underground
Santa Cruz Bus Terminal
Vila Mariana
CKL Chácara Klabin Side platforms Underground Vila Mariana

Extensions from Chácara Klabin station to Ipiranga and from Capão Redondo to Jardim Ângela are planned.[6]

Technical specifications

The line operates with 25 trains (out of 26 available)[7] and is made-up by 17 stations, transporting about 600,000 people every business day.[2] Eight additional trains are expected to be added to the line in 2020, after CBTC installation and other enhancements are completed.[8]

It was the first line in the Sao Paulo Metro to utilize a 1500 V tension Catenary, Standard Gauge, beside trains with IGBT power conversion and 1,60 m wide doors.[9] Santo Amaro station was the first in Brazil to be built on a cable-stayed bridge.[10]

During the 11.5 km (7.1 mi) extension between Largo Treze and Chacara Klabin stations, three TBMs were used and 26 CAF trains were added to the line in addition to the eight Alstom trains originally available.[11]

References

  1. Ferreira, Robert; Tharcisiu Alves. (January 2012). "São Paulo Metro". nycsubway.org. Archived from the original on February 2, 2014. Retrieved February 2, 2014. On Lines 1, 2 and 3, the track gauge is a non-standard 1600 mm, the third rail is 750 V DC and under running. For Lines 4 and 5, the track gauge is 1435 mm and they use overhead pantograph, precluding any connection to the rest of the system, plus the 4 and 5 lines can't connect because the trains on the 4 line use drive-less technology while trains on 5 line are OPTO. Lines 7, 8, 9, 10, 11 and 12 (operated by CPTM) are all 1600 mm and use overhead pantograph.
  2. https://viatrolebus.com.br/2019/06/linha-5-lilas-do-metro-aumento-90-fluxo-de-usuarios/
  3. "Linha 5 do metrô de São Paulo atrasa e fica para o próximo governo". Folha de S.Paulo. Retrieved June 5, 2017.
  4. "Governador dá início às obras de expansão da Linha 5-Lilás e vistoria a construção da estação Adolfo Pinheiro". diariodacptm.blogspot.ca. Retrieved June 5, 2017.
  5. "SP inaugura estação Campo Belo da Linha 5-Lilás do Metrô nesta segunda-feira" (in Portuguese). G1. April 8, 2019. Retrieved April 8, 2019.
  6. https://www.ferroviando.com.br/linha-5-lilas-recebe-licenca-ambiental-da-extensao-ate-o-jardim-angela/
  7. "Perguntas Frequentes". www.viamobilidade.com.br. Retrieved August 13, 2020.
  8. https://viatrolebus.com.br/2019/03/metro-espera-concluir-atualizacao-da-antiga-frota-f-da-linha-5-ainda-neste-semestre/
  9. http://www.saopaulo.sp.gov.br/eventos/cptm-recebe-o-primeiro-trem-da-futura-linha-5-do-metro-de-sao-paulo/
  10. http://www.saopaulo.sp.gov.br/spnoticias/ultimas-noticias/linha-5-do-metro-passa-a-funcionar-aos-domingos-e-feriados-1/
  11. https://www.aecweb.com.br/cont/m/rev/construcao-da-linha-5--lilas-de-sp-utiliza-tres-megatatuzoes_7879_10_22
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.