Caoqiao station
Caoqiao station (simplified Chinese: 草桥站; traditional Chinese: 草橋站; pinyin: Cǎoqiáo zhàn) is a station on Line 10 and Daxing Airport Express of the Beijing Subway.[2][3]
Line 10 platform | ||||||||||||||||
Location | Zhenguosi North Street (镇国寺北街) and West Caoqiao Road (草桥西路) Fengtai District, Beijing China | |||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited (line 10) Beijing Metro Operation Administration (BJMOA) Corporation Limited (Daxing Airport Express) | |||||||||||||||
Line(s) | Line 10 Daxing Airport Express | |||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Disabled access | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | December 30, 2012 (line 10) September 26, 2019[1] (Daxing Airport Express) | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
Location | ||||||||||||||||
Caoqiao Location in central Beijing |
Opening time
The station for Line 10 opened on December 30, 2012.[4]
The station for Daxing Airport Express opened on September 26, 2019.[1]
Station layout
The line 10 station has an underground island platform, and the Daxing Airport Express station has 2 underground side platforms. The Daxing Airport Express station provides an in-town check-in service for flights departing Beijing Daxing International Airport, with 4 counters in the southwest of Daxing Airport Express concourse. XiamenAir has an individual information desk in the Daxing Airport Express concourse.[6]
Exits
There are seven exits, lettered A, B, E1, E2, F, G, and H. Exits A, E1, F, and G are accessible.
References
- "地铁大兴机场线明起运营,6条机场大巴线路同步开通". 2019-09-25.
- "Archived copy". Archived from the original on 2014-11-01. Retrieved 2013-01-03.CS1 maint: archived copy as title (link)
- "Archived copy". Archived from the original on 2014-04-16. Retrieved 2012-11-21.CS1 maint: archived copy as title (link)
- (Chinese) 轨道交通四条新线12月30日开通试运营. Beijing Municipal Transportation Administration Bureau. Archived from the original on May 11, 2013. Retrieved December 29, 2012.
- "19号线草桥以南后年先行开通". 2019-07-03.
- "关于大兴机场的疑问 厦航在这里统统解答". CAN Press. 2020-03-26. Retrieved 2020-04-12.