Line 19 (Beijing Subway)

Line 19 of the Beijing Subway (Chinese: 北京地铁19号线; pinyin: běijīng dìtiě shíjiǔ hàoxiàn) is a rapid transit line under construction in Beijing. Phase 1 of the line, which is currently under construction, is 22.4 km in length with 10 stations. It is fully underground.[4]

Line 19
 19 
Construction site of Ping'anli station, Line 19 in March 2017
Overview
Other name(s)M19 / R3 (planned name)
StatusUnder construction
TerminiMudanyuan
Xin'gong
Stations10 (Phase 1)
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Metro Operation Administration (BJMOA) Corp., Ltd.[1]
Rolling stock8-car Type A
Technical
Line length22.4 km (Phase 1)
Characterfully underground[2]
Track gauge1,435 mm (4 ft 8 12 in)
Operating speed100 km/h (Phase 1)[3]
Route map

planned extensions
Mudan Yuan
outer - inner
Xiaoyue river
Beitaipingzhuang
Sijiqing - Guanzhuangluxikou
North Hucheng river
Jishuitan
outer - inner
Ping'an Li
Line 3 Caogezhuang North
Line 3 Tiancun
Jinrongjie
Line 1 crossing
Line 2 crossing
Niujie
Line 7 crossing
South Hucheng river
Jingfengmen
Liangshui river
Daxing Airport Express Lize Business District
Ma'cao river
Caoqiao
inner - outer
Xinfadi
Xingong depot
Xin Gong
planned extensions

Planned opening time

The section from Caoqiao station to Xin'gong station (3 stations) will be opened in 2021, and the other 7 stations will be opened after 2021.[5]

Description

According to the most recent plan, Phase 1 of Line 19 will begin at Mudanyuan station in Haidian District and end at Xin'gong station in Fengtai District.[6] Phase 1 of the line is 22.4 km (13.9 mi) in length with 10 stations.[7] The line was envisioned as a major relief line for the overcrowded Line 4 and more direct link to the Beijing Financial Street commercial area.

Rolling stock

The line will use 8-car type A rolling stock.[3][8]

Stations (Phase I)

Station Name Connections Distance
km
English Chinese
Mudan Yuan 牡丹园  10 
Beitaipingzhuang 北太平庄  12  (U/C)
Jishuitan 积水潭  2 
Ping'an Li 平安里  4   6 
Jinrongjie 金融街
Niujie 牛街
Jingfengmen 景风门  14  (U/C)
Caoqiao 草桥  10   Daxing Airport 
Xinfadi 新发地
Xin Gong 新宫  Daxing 

History

It was reported in February 2012 as one of six new lines under planning by the city's public transit planning authorities. As of 2015, the line was renamed to Line 19[9] with the first phase starting construction in 2016.[6] The line will open in 2021.[10][11]

Future Development

Phase 2 of Line 19, which is under planning, consists of a northern extension. There will be a branch line of the northern extension, which will serve the rebuilt Qinghe railway station, a station on the Beijing–Zhangjiakou intercity railway.[12]

References

  1. "喜讯!北京轨道运营公司获得北京地铁19号线运营权 (BJMOA Obtains Operation Rights for Beijing Subway Line 19)". 继国庆节前成功高水平开通运营北京大兴国际机场线后,又收到成交通知书,经市政府批准,公司被确定为北京地铁19号线的运营商 (Following the successful opening of the Daxing Airport Express before the National Day, a transaction notification was received. With the approval of the municipal government, the BJMOA company was identified as the operator of Line 19)
  2. http://m.sohu.com/n/419834931/
  3. 北京地铁19号线无缝对接新机场线 10站中8站能换乘-千龙网·中国首都网. beijing.qianlong.com. Retrieved 2017-03-24.
  4. http://m.sohu.com/n/419834931/
  5. "19号线草桥以南后年先行开通". 2019-07-03.
  6. "北京地铁19号线一期预计2020年完工 系首条南北地铁快线-新华网". www.xinhuanet.com. Retrieved 2018-07-21.
  7. "北京地铁19号线将设10座车站8座能换乘 年内开建 北京日报 2015-8-27" (in Chinese).
  8. 北京地铁19号线一期全部车站开建 计划于2020年通车-千龙网·中国首都网. beijing.qianlong.com. Retrieved 2018-05-29.
  9. http://news.cnr.cn/native/gd/20150720/t20150720_519258903.shtml
  10. "19号线草桥以南后年先行开通". 2019-07-03.
  11. "编制轨道交通新一轮建设规划". 2019-02-27.
  12. 北京地铁19号线一期计划2020年底开通. www.bj.xinhuanet.com. Retrieved 2017-03-24.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.