Cultural Park station
Cultural Park Station (Chinese: 文化公园站) is an interchange station between Line 6 and Line 8 of the Guangzhou Metro. It is located underground in the Liwan District and started operation on 28 December 2013.[1]
Transfer Port to Line 8 Platform | ||||||||||||||||
Chinese name | ||||||||||||||||
Simplified Chinese | 文化公园站 | |||||||||||||||
Traditional Chinese | 文化公園站 | |||||||||||||||
| ||||||||||||||||
General information | ||||||||||||||||
Location | Liwan District, Guangzhou, Guangdong China | |||||||||||||||
Coordinates | 23.109186°N 113.248976°E | |||||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (2 island platform) | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
History | ||||||||||||||||
Opened | 28 December 2013 | |||||||||||||||
Services | ||||||||||||||||
|
Station layout
G | - | Exits |
L1 Concourse |
Lobby | Customer Service, Shops, Vending machines, ATMs |
L2 Equipment Area |
- | Station equipment |
L3 Platforms |
Reserved Zone | Reserved for Line 8 |
Platform 2 | 6 towards Xunfenggang (Huangsha) | |
Island platform, doors will open on the left | ||
Platform 1 | 6 towards Xiangxue (Yide Lu) | |
L4 Platforms |
Platform 3 | 8 towards Jiaoxin (Hualinsi Buddhist Temple) |
Island platform, doors will open on the left | ||
Platform 4 | 8 towards Wanshengwei (Tongfuxi) |
Exits
Exit number | Exit location | |
---|---|---|
Exit A | Xidi Ermalu | |
Exit B | Xidi Ermalu | |
Exit D | Zhen'an Lu | |
Exit E | Liu'ersan Lu |
References
- Zheng, Xiaojia. "Guangzhou Metro Line 6 Scheduled to Open on Dec. 28". Life of Guangzhou. Guangzhou Interactive Information Network. Retrieved 10 January 2014.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.