DOST Hybrid Electric Train

The Hybrid Electric Train (HET) is a hybrid electric train built by the Department of Science and Technology's Metals Industry Research and Development Center.

Hybrid Electric Train
In service20182019 (Trial runs and free passenger rides)
ManufacturerCar body:
Fil-Asia Automotive and Industries
Bogies:
Sung-Shin Rolling Stock Technology Ltd
DesignerDOST–MIRDC
Constructed20142015
Number built5 non-articulated cars in 1 trainset
(1 pilot car, 1 power car, 3 passenger cars)
FormationPilot-Passenger-Passenger-Passenger-Power
CapacityDesign load:
175 passengers per car
Crush load:
220 passengers per car
Operator(s)DOST → Philippine National Railways
Depot(s)Caloocan depot → Calamba station
Line(s) served2
Specifications
Car body constructionStructure:
Mild steel
Frame interior:
Galvanneal steel
Carbody shell:
Fiberglass reinforced plastic
Train length60,000 mm (196 ft 10 in)
Car length12,000 mm (39 ft 4 in)
Width2,850 mm (9 ft 4 in)
Height4,432 mm (14 ft 6.5 in)
Doors2 double-sliding doors on each car
Maximum speed80 km/h (50 mph) (computed)
Weight25.5 t (25,500 kg)
Steep gradient1.2%
Power output1,250 hp (930 kW)
TransmissionHybrid diesel-electric
Power supply440V diesel genset and 12V x 260 lead-acid batteries
Bogies2 H-frame (outside-frame type) bogies per car
Minimum turning radius50 m (160 ft)
Braking system(s)Regenerative
Safety system(s)Automatic train stop
Coupling systemIn-between cars:
Semi-permanent couplers
Trainset ends:
Automatic couplers
Track gauge1,067 mm (3 ft 6 in)
Notes
Specs are based from the paper by DOST-MIRDC.[1][2]

It is the first train crafted and designed locally by Filipino engineers with parts imported from abroad. It was officially turned over to the Philippine National Railways on June 20, 2019.

Background

The development of the Hybrid Electric Train (HET) is a project of the Metals Industry Research and Development Center (MIRDC) of the Philippine Department of Science and Technology in partnership with the Philippine National Railways (PNR).[3]

The Hybrid Electric Train project began in 2012, and the designing of the train commenced in the following year.[4] The bidding process took place in 2013, with the manufacturing taking place from 2014 to 2015.[5] The project was introduced to the public in June 2016.[6]

The train was developed by ten Filipino engineers and technicians from MIRDC led by head engineer Pablo Acuin.[7]

Specifications

The Hybrid Electric Train is a hybrid electric vehicle powered by electricity and diesel.[8] It has 260 lead acid batteries which is used to run the train and operate its automatic doors, air-conditioning and CCTV systems.[4] It can be converted to utilize lithium battery.[8] It also makes use of regenerative braking technology.[4]

The trainset has five non-articulated cars measuring 12 m (39 ft) long, 2.85 m (9.4 ft) wide, and 4.432 m (14.54 ft) high with one double-sliding doors on each side of each car,[1] which can carry 220 passengers each at 50 kilometers per hour (31 mph).[9][10] Four of its cars serve as passenger coaches with one having a driver's cabin, while the other car not mentioned solely serves as a generator car that also includes a driver's cabin.

The train also has an automatic stop safety feature that would activate in an event of a strong earthquake.[7]

The MIRDC contracted local bus and truck manufacturer Fil-Asia Automotive and Industries Corp. to build the train. Fil-Asia in turn outsourced the motor, chassis, engine, motor, axle, and wheels from outside of the Philippines to be able to manufacture it.[4]

Operational history

The first commercial operations of the Hybrid Electric Train began on May 6, 2019, where it served the Alabang-Calamba Line thrice a day.[11][12] The train was officially turned over to the Philippine National Railways on June 20, 2019.[13] The DOST-HET has not made any known public appearances since then, and is currently being stored in Calamba, Laguna.

Future

According to DOST Secretary Fortunato Dela Pena, the DOST will find private sector firms that will manufacture the rolling stock of the HET before Rodrigo Duterte ends his term as President in 2022.[14]

See also

References

  1. Puerto, Jonathan; Acuin, Pablo; Tamayo, Rodnel (2018). "Design and Development of a Five-Coach Hybrid Electric Train". Philippine Metals. 5. Retrieved April 24, 2019.
  2. Department of Science and Technology (2015). DOST Annual Report 2015 (PDF) (Report). Archived from the original on June 10, 2020. Retrieved June 10, 2020.
  3. "PH-Made HET is DOST's proof that some dreams do come true". Calamba, Laguna: Metals Industry Research and Development Center. Retrieved April 24, 2019.
  4. Cruz, Cherryl Ann (February 21, 2019). "Meet the First Filipino-Built Train: The Hybrid Electric Train (HET)". Carmudi. Retrieved April 24, 2019.
  5. Rey, Aika (January 22, 2019). "PNR to run first Philippine-made train". Rappler. Retrieved April 24, 2019.
  6. "DOST Usec. Guevarra join the Hybrid Electric Train Project Team in its crush load testing". Metals Industry Research and Development Center. Retrieved April 24, 2019.
  7. Pa-a, Saul (April 24, 2019). "1st Filipino hybrid train runs from Calamba to Manila". Philippine News Agency. Retrieved April 24, 2019.
  8. Velasco, Ed (January 21, 2019). "PH-made trains to roll soon". Manila Times. Retrieved April 24, 2019.
  9. "DOST urges public to try the PH-made hybrid electric train". Philippine News Agency. July 19, 2018. Retrieved April 24, 2019.
  10. "Details of the Hybrid Electric Train (HET) and Automated Guideway Transit (AGT)". Freedom of Information Philippines. Metals Industry Research and Development Center. Retrieved May 8, 2019.
  11. "Pinoy-made hybrid electric train to start operations May 6". ABS-CBN News. April 24, 2019. Retrieved April 24, 2019.
  12. "DOST's Hybrid Electric Train Inauguration". techmagus. April 29, 2019. Retrieved April 29, 2019.
  13. "DOST-MIRDC turns over the Hybrid Electric Train (HET) to the PNR". The Official Website of Metals Industry Research and Development Center. Retrieved June 26, 2019.
  14. Hybrid electric train, itinurn-over na sa PNR [Hybrid electric train, to be turned over to the PNR] (Television production) (in Filipino). People's Television Network. June 20, 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.