Line 18 (Guangzhou Metro)

Line 18 of Guangzhou Metro (Chinese: 广州地铁18号线; pinyin: Guǎngzhōu Dìtiě Shíbāhàoxiàn) is a rapid transit express line under construction in Guangzhou.[3][4] It will run in a south-north direction, connecting Wanqingsha in Nansha District, Panyu Square in Panyu District, Pazhou in Haizhu District, Zhujiang New Town and Guangzhou East railway station in Tianhe District.

Line 18
 18 
Overview
Other name(s)Nansha express line (Chinese: 南沙快线)
StatusUnder Construction
OwnerCity of Guangzhou
TerminiWanqingsha
Guangzhou East Railway Station
Stations9
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
History
OpenedJune 2021 (Wanqingsha—Xiancun section)[1]
Technical
Line length65.3 km (40.58 mi)
CharacterUnderground
Track gauge1,435 mm (4 ft 8 12 in)
Operating speed160 km/h (99 mph)[2]
Route map

 3  to Airport North (Terminal 2)
 11 
anti-clockwise
clockwise
Guangzhou East Railway Station
 1   3   11 
 1  to Xilang
Xiancun
 13 
 13 
to Chaoyang
to Yuzhu
Modiesha
 8 
 8 
to Jiaoxin
to Wanshengwei
Shiliugang
 11 
 11 
clockwise
anti-clockwise
Shaxi
Nancun Wanbo
 7 
 22  to Fangcun
Panyu Square
 3   22 
 3  to Haibang
Longzhen Stabling Yard
Hengli
 22 
Wanqingsha
 22 
Wanqingsha Depot
Line 18 drawn to scale.

Planning

Line 18 and Line 22 were originally planned as long-term projects, but the desire to promote development of the Nansha Free Trade Zone fast tracked the project for construction. Line 18 will be designed as an express line to provide a rapid transit link between Nansha District and the central urban area of Guangzhou. The planned travel time between Nansha Free Trade Zone and central Guangzhou is proposed to be 30 minutes.[5][6]

The government received a number of requests from the public to increase the number of stations along the line. In particular a station at Tianhe Sports Center station allowing from interchange with Line 1[7] and a station at Yuwotou Town.[8] The planners rejected the suggestions to maintain the line's wide stop spacing to allow for the target of 30 minute travel time Nansha and central Guangzhou. Together with the planned Line 26 along Guangzhou Avenue, Line 18 is expected to provide some relief to Line 3.

An extension is planned that would see the line extended to Zhuhai. Construction on the extension is expected to start before the end of 2021.[9]

Summary

The line roughly north-south, start at Nansha District Wanqingsha hub, end at Guangzhou East railway station, connecting Nansha New Area and Guangzhou East Railway Station, with a total length of 65.3 km (40.6 mi) with 9 stations. The line located at Wanqingsha, Hengli, Panyu Square, Nancun Wanbo, Shaxi, Shiliugang, Pazhou West Zone, Xiancun, Guangzhou East. The line is an express subway line using 8 car Type D trains with an operating speed of 160 km/h (99 mph).[10] Two distinct stopping patterns will be operated, a local all stop service and an express service. The purpose to shorten travel time from Nansha to Guangzhou city center and Guangzhou East Railway Station to Wanqingsha. The line will interline with the Line 22 south of Panyu Square to Wanqingsha.

Opening time

The section from Wanqingsha to Xiancun will start operation in June 2021, and the section from Xiancun to Guangzhou East Railway Station will start operation in December 2022.[1]

Stations

R L Station name[11]  22  Connections Location
English Chinese
Guangzhou East Railway Station 广州东站  1   3   11  GGQ Tianhe
Xiancun 冼村  13 
Modiesha 磨碟沙  8  Haizhu
Haizhu Wetland 海珠湿地  11 
Shaxi 沙溪 Panyu
Nancun Wanbo 南村万博  7 
Panyu Square 番禺广场  3 
Hengli 横沥 Nansha
Wanqingsha 万顷沙  15  Nansha railway station

References

  1. 定了!地铁18号线、22号线首通段计划明年6月通车. 2020-04-07. 其中首通段万顷沙至冼村计划开通时间为2021年6月,后通段冼村至广州东站计划开通时间为2022年12月
  2. 广州最高规格地铁——18号线、22号线计划2020年建成 (in Chinese). bendibao.com. 25 July 2017.
  3. 广州市城市轨道交通近期建设规划(2016-2022年). 广州公共资源交易网.
  4. 珠三角12条地铁线路今年开工!1小时生活圈来了 (in Chinese). NetEase News. 25 February 2018.
  5. "壕气!投三千来亿,广州未来15年新建15条地铁线_广州日报大洋网". web.archive.org. 2015-12-23. Retrieved 2020-06-12.
  6. "广州新一轮地铁规划将杀到 15条线路详解(图)_广州新闻_南方网". web.archive.org. 2016-03-04. Retrieved 2020-06-12.
  7. "广州地铁18号线能加个体育东站吗?_广州日报大洋网". web.archive.org. 2017-05-19. Retrieved 2020-06-12.
  8. "榄核大岗诉求如何实现?鱼窝头加个站可缓解". news.ycwb.com. Retrieved 2020-06-12.
  9. "广州地铁18号线南延段今年年底开工" [The southern extension of Line 18 of the Guangzhou Metro will start construction at the end of this year] (in Chinese). 26 January 2021. Retrieved 26 January 2021.
  10. "详细页". www.gzggzy.cn. Retrieved 2020-06-12.
  11. "广州地铁18、22号线初定站名公示,有取名意见的赶紧提". 2020-06-19.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.