List of HVDC projects
This is a list of notable high-voltage direct-current power transmission projects.
HVDC projects for long-distance transmission have two (or rarely, more) converter stations and a transmission line interconnecting them. Generally overhead lines are used for interconnection, but an important class of HVDC projects use submarine power cables. A back-to-back station has no transmission line and connects two AC grids at different frequencies or phase counts. Historical HVDC systems used the Thury system of motor-generators but these have all been made obsolete by later developments such as mercury-arc valves, thyristors, and IGBT power transistors.
Legend
Line type:
- Thury = Series-connected generators as designed by René Thury
- Merc = Mercury-arc valve rectifier and inverter
- Thyr = Thyristor rectifier and inverter
- IGBT = Insulated Gate Bipolar Transistors
Line status:
Transmission lines
Africa
Name |
Converter station 1 |
Converter station 2 |
Total Length (Cable/Pole) (km) |
Volt (kV) |
Power (MW) |
Year |
Type |
Remarks |
Ref |
---|---|---|---|---|---|---|---|---|---|
Cahora Bassa | Mozambique - Songo 15°36′41″S 32°44′59″E | South Africa - Apollo 25°55′11″S 28°16′34″E | 1420 (0/1420) | 533 | 1920 | 1979 | Thyr | First HVDC with Project upto 500kV ABB refurb 2013-2014 |
[1][2][3] |
Inga-Shaba | Congo, The Democratic Republic of the - Kolwezi 10°39′27″S 25°27′08″E | Congo, The Democratic Republic of the - Inga 05°31′27″S 13°36′39″E | 1700 (0/1700) | 500 | 560 | 1982 | Thyr | Upgraded in 2014 Supplier: ABB, GE | [1][4][5][6] |
Caprivi Link | Namibia - Gerus 20°18′53″S 16°27′9″E | Namibia - Zambezi 17°30′6″S 24°13′20″E | 950 (0/950) | 350 | 300 | 2010 | IGBT | Supplier: ABB | [1][7] |
Ethiopia–Kenya HVDC Interconnector | Ethiopia - Wolayta 6°54′27″N 37°43′19″E | Kenya - Suswa 1°03′44″S 36°21′35″E | 1045 (0/1045) | 500 | 2000 | 2019 | Thyr |
Australia and Oceania
Name |
Converter station 1 |
Converter station 2 |
Total Length (Cable/Pole) (km) |
Volt (kV) |
Power (MW) |
Year |
Type |
Remarks |
Ref |
---|---|---|---|---|---|---|---|---|---|
HVDC Inter-Island 1 | New Zealand - Benmore 44°33′55″S 170°11′24″E | New Zealand - Haywards 41°9′1″S 174°58′52″E | 611 (40/571) | 270 | 600 | 1965 | Merc | Built as 250 kV 600 MW link Paralleled to operate at 270 kV as positive pole with HVDC Inter-Island 2 in 1992. Partially decommissioned in 2007, fully decommissioned in August 2012. Supplier: ABB |
[1] |
HVDC Inter-Island 2 | New Zealand - Benmore 44°33′55″S 170°11′24″E | New Zealand - Haywards 41°9′1″S 174°58′52″E | 611 (40/571) | 350 | 700 | 1992 | Thyr | Negative pole, operates in bipole configuration with HVDC Inter-Island 3 (previously HVDC Inter-Island 1) Restricted to 500 MW due to cable rating. Supplier: ABB | [1] |
Terranora interconnector (Directlink) | Australia - Mullumbimby 28°34′15″S 153°27′8″E | Australia - Bungalora 28°15′20″S 153°28′20″E | 59 (59/0) | 80 | 180 | 2000 | IGBT | Land cable Supplier: ABB | [1] |
Murraylink | Australia - Red Cliffs 34°17′31″S 142°14′19″E | Australia - Berri 34°14′17″S 140°36′01″E | 176 (176/0) | 150 | 200 | 2002 | IGBT | Underground XLPE cable Supplier: ABB | [1] |
Basslink | Australia - LoyYang, Vic 38°15′45″S 146°36′29″E | Australia - GeorgeTown, Tas 41°6′53″S 146°53′31″E | 370 (298/72) | 400 | 500 | 2006 | Thyr | One of the longest HVDC cable in operation Supplier: Siemens | [1][8][9] |
HVDC Inter-Island 3 | New Zealand - Benmore 44°33′55″S 170°11′24″E | New Zealand - Haywards 41°9′1″S 174°58′52″E | 611 (40/571) | 350 | 735 | 2013 | Thyr | Positive pole, operates in bipole configuration with HVDC Inter-Island 2 Supplier: Siemens | [10] |
Asia
Name | Converter station 1 |
Converter station 2 |
Total Length (Cable/Pole) (km) |
Volt (kV) |
Power (MW) |
Year |
Type |
Remarks |
Ref |
---|---|---|---|---|---|---|---|---|---|
Hokkaido - Honshu | Japan - Hakodate 41°55′55″N 140°39′47″E | Japan - Kamikita 40°48′06″N 141°11′52″E | 193 (44/149) | 250 | 300 | 1979 | Thyr | Supplier: ABB, Hitachi, Toshiba | [1] |
Zhou Shan | China - Ningbo 29°55′25″N 121°46′51″E | China - Gao Tongge 30°02′13″N 122°04′03″E | 54 (12/42) | 100 | 50 | 1982 | Thyr | [1] | |
Gezhouba - Shanghai | China - Gezhouba 30°43′44″N 111°14′39″E | China - Nan Qiao 30°57′22″N 121°24′48″E | 1046 (0/1046) | 500 | 1200 | 1989 | Thyr | Power line shares pylons of HVDC Hubei - Shanghai in most part of its track
HVDC C&P System Refurbished by NR Electric |
[11] |
Sileru-Barsoor | India - Sileru 17°52′01″N 81°39′21″E | India - Barsoor 19°8′20″N 81°23′47″E | 196 (0/196) | 200 | 100 | 1989 | Thyr | Supplier: BHEL | [1] |
Ekibastuz–Tambov | Kazakhstan - Ekibastuz 51°48′57″N 75°18′58″E | Russia - Tambov 52°46′25″N 41°19′17″E | 2414 (0/2414) | 750 | 6000 | - | Thyr | Construction sites abandoned around 1990 owing to collapse of Soviet Union, line was never completed | |
Rihand-Delhi | India - Rihand 24°01′13″N 82°47′21″E | India - Dadri 28°35′36″N 77°36′16″E | 814 (0/814) | 500 | 1500 | 1990 | Thyr | Supplier: ABB, BHEL | [12] |
Haenam-Cheju | South Korea - Haenam 34°22′03″N 126°35′34″E | South Korea - Jeju 33°32′06″N 126°35′44″E | 101 (101/0) | 180 | 300 | 1996 | Thyr | Supplier: Alstom | [1] |
Leyte - Luzon | Philippines - Ormoc, Leyte 11°5′19″N 124°38′21″E | Philippines - Naga, Camarines Sur 13°36′40″N 123°14′19″E | 451 (21/430) | 350 | 440 | 1998 | Thyr | Supplier: ABB, Marubeni
HVDC C&P System Refurbished by NR Electric |
[1] |
Chandrapur-Padghe | India - Chandrapur 20°0′36″N 79°17′06″E | India - Padghe 19°21′26″N 73°11′18″E | 752 (0/752) | 500 | 1500 | 1999 | Thyr | Supplier: ABB | [13] |
Kii Channel | Japan - Anan 33°49′40″N 134°38′14″E | Japan - Kihoku 34°12′50″N 135°30′07″E | 100 (50/50) | 250 | 1400 | 2000 | Thyr | Supplier: Hitachi, Toshiba, Mitsubishi | [1] |
Tian-Guang | China - Tianshengqiao 24°54′56″N 105°05′47″E | China - Beijiao 23°18′58″N 113°15′05″E | 960 (0/960) | 500 | 1800 | 2001 | Thyr | Supplier: Siemens
HVDC C&P System Refurbished by NR Electric |
[1] |
Thailand-Malaysia | Thailand - Khlong Ngae 6°42′56″N 100°27′8″E | Malaysia - Gurun 5°48′45″N 100°32′6″E | 110 (0/110) | 300 | 300 | 2001 | Thyr | Supplier: Siemens | [1] |
Shengsi | China - Shengsi 30°42′06″N 122°26′22″E | China - Anabasis Sizu 30°51′56″N 121°50′25″E | 66.2 (63.21/2.99) | 50 | 60 | 2002 | Thyr | [14] | |
Talcher-Kolar | India - Talcher, Odisha 21°06′01″N 85°03′49″E | India - Kolar, Karnataka 13°10′39″N 78°7′0″E | 1450 (0/1450) | 500 | 2500 | 2003 | Thyr | Supplier: Siemens | [1] |
Three Gorges - Changzhou | China - Longquan 30°47′6″N 111°31′48″E | China - Zhengping 31°36′42″N 119°59′27″E | 890 (0/890) | 500 | 3000 | 2003 | Thyr | From north bank of Three Gorges to Zhengping, 200 km from Shanghai in the East grid Supplier: ABB, Siemens. Sharing of grounding electrode at Chujiahu with HVDC Hubei-Shanghai | [1][15][16] |
Guizhou - Guangdong I | China - Anshun, Guizhou 26°16′23″N 105°48′21″E | China - Zhaoqing, Guangdong 22°54′57″N 112°29′11″E | 980 (0/980) | 500 | 3000 | 2004 | Thyr | Supplier: Siemens | [1] |
Three Gorges - Guangdong | China - Jingzhou 30°27′26″N 112°08′18″E | China - Huizhou 23°16′15″N 114°12′5″E | 940 (0/940) | 500 | 3000 | 2004 | Thyr | Supplier: ABB | [1][17] |
Three Gorges - Shanghai | China - Yidu 30°31′45″N 111°22′35″E | China - Shanghai 31°14′13″N 121°11′13″E | 1060 (0/1060) | 500 | 3000 | 2006 | Thyr | Supplier: ABB | [1][18] |
Guizhou - Guangdong II | China - Xingren 25°27′56″N 105°15′14″E | China - Shenzhen 22°45′1″N 113°59′28″E | 1200 (0/1200) | 500 | 3000 | 2007 | Thyr | Supplier: Siemens, Sharing of grounding electrode at Linwu with HVDC Yunnan - Guangdong | [1] |
Ballia - Bhiwadi | India - Ballia 26°04′16″N 83°42′48″E | India - Bhiwadi 28°11′0″N 76°48′58″E | 800 (0/800) | 500 | 2500 | 2010 | Thyr | Supplier: Siemens | [1] |
Baoji - Deyang | China - Baoji 34°34′47″N 107°19′49″E | China - Denyang 31°19′22″N 104°34′51″E | 574 (0/574) | 500 | 3000 | 2010 | Thyr | ??? | |
Hulunbeir - Liaoning | China - Hulunbeir 48°31′04″N 119°43′30″E | China - Shenyang 41°07′25″N 122°46′44″E | 920 (0/920) | 500 | 3000 | 2010 | Thyr | Supplier: ABB | [1][19] |
Xiangjiaba-Shanghai | China - Fulong 28°32′47″N 104°25′04″E | China - Fengxia 30°55′32″N 121°46′16″E |
1980 (0/1980) | 800 | 6400 | 2010 | Thyr | Supplier: ABB | [1][20] |
Yunnan - Guangdong | China - Yunnan province 25°11′24″N 102°11′30″E | China - Zengcheng 23°15′19″N 113°40′44″E | 1418 (0/1418) | 800 | 5000 | 2010 | Thyr | Supplier: Siemens, Sharing of grounding electrode at Linwu with HVDC Guizhou - Guangdong II | [1] |
Hubei - Shanghai | China - Jingmen 30°49′21″N 112°07′15″E | China - Fenjing 30°52′00″N 121°00′58″E | 970 (0/970) | 500 | 3000 | 2011 | Thyr | Power line shares pylons of HVDC Gezhouba - Shanghai in most part of its track, sharing of grounding electrode at Chujiahu with HVDC Shanghai-Changzhou | ??? |
Nanhui Wind Farm Integration | China | China | 8.4 (8.4/0) | 30 | 18 | 2011 | IGBT | Supplier: C-EPRI Electric Power Engineering Co.,Ltd | [21] |
Ningdong - Shandong | China - Yinchuan 38°06′56″N 106°30′55″E | China - Qingdao 36°18′41″N 119°52′53″E | 1335 (0/1335) | 660 | 4000 | 2011 | Thyr | Supplier:Alstom; C-EPRI Electric Power Engineering Co.,Ltd | [1] |
Qinghai - Tibet | China - Geermu 36°21′20″N 95°11′05″E | China - Lhasa 29°52′39″N 91°11′44″E | 1038 (0/1038) | 400 | 1500 | 2011 | Thyr | Powerline reaches altitudes up to 5300 m above sea level Supplier: CET, SGCC | [1] |
Mundra - Haryana | India - Mundra 22°49′46″N 69°33′22″E | India - Mohindergarh 28°21′40″N 76°12′56″E | 960 (0/960) | 500 | 2500 | 2012 | Thyr | Supplier: Siemens | [1] |
Dalian City Infeed | China - Dalian North | China - Dalian South | 43 (43/0) | 320 | 1000 | 2013 | IGBT | [22] | |
Jinping - Sunan | China - Jinping 27°50′11″N 102°08′30″E | China - Suzhou 31°03′44″N 120°37′20″E | 2090 (0/2090) | 800 | 7200 | 2013 | Thyr | Supplier: ABB, C-EPRI Electric Power Engineering Co.,Ltd
ACC Provided by NR Electric in Jinping Converter Station |
[23] |
Nanao Multi-terminal VSC HVDC | China - Sucheng 23°26′40″N 116°48′50″E | China - Jinniu 23°26′14″N 117°01′36″E; China - Qingao 23°25′46″N 117°07′45″E | 32 (10/32) | ±160 | 200/100/50 | 2013 | IEGT/IGBT | SEPRI (Electric Power Research Institute, China Southern Power Grid) is technically responsible for the entire project. Multiple suppliers are involved: three different VSC HVDC valve suppliers, two different HVDC land/sea cable suppliers and three different control & protection system/equipment suppliers. | [24][25] |
Nuozhadu - Guangdong | China - Nuozhadu 22°39′20″N 100°40′00″E | China - Jiangmen 22°42′33″N 112°52′12″E | 1413 | 800 | 6400 | 2013 | Thyr | ??? | |
Xiluodo - Guangdong | China - Zhaotong 28°07′21″N 104°22′27″E | China - Conghua 23°34′00″N 113°27′03″E | 1286 (0/1286) | 500 | 6400 | 2013 | Thyr | ??? | |
Hami - Zhengzhou | China-Hami 42°35′20″N 93°27′46″E | China-Zhengzhou 34°48′46″N 114°03′24″E | 2192 | 800 | 8000 | 2014 | Thyr | Supplier: C-EPRI Electric Power Engineering Co.,Ltd
HVDC C&P System Provided by NR Electric |
??? |
Jindo - Jeju | South Korea - Jindo 34°23′08″N 126°11′14″E | South Korea - Jeju 33°27′17″N 126°28′25″E | 105 (105/0) | 250 | 400 | 2014 | Thyr | Supplier: Alstom (converter stations), LS Cable and System (cables). | [1][26][27] |
Xiluodo - West Zhejiang | China - Xiluodu 28°27′37″N 104°20′20″E | China - Jinghua 28°53′46″N 119°43′00″E | 1680 | 800 | 8000 | 2014 | Thyr | Supplier:C-EPRI Electric Power Engineering Co.,Ltd | ??? |
Zhoushan Multi-terminal DC Interconnection | China - Zhoushan 30°09′07″N 121°59′29″E | China - Qushan 30°25′26″N 122°16′48″E ; China - Daishan 30°19′37″N 122°11′35″E ; China - Yangshan 30°36′26″N 122°07′40″E ; China - Sijiao 30°41′45″N 122°25′50″E | 134 (134/0) | ±200 | 400 | 2014 | IGBT | Supplier:C-EPRI Electric Power Engineering Co.,Ltd
HVDC C&P System Provided by NR Electric |
[28] |
Humeng - Shandong | China | China | 800 | 6400 | 2015 | Thyr | ??? | ||
Irkutsk - Beijing | Russia - Irkutsk | China - Beijing | 800 | 6400 | 2015 | Thyr | ??? | ||
Champa-Kurukshetra | India - Champa | India - Kurukshetra | 1365 (0/1365) | 800 | 2 x 3000 | 2016 | Thyr | 2 Bipoles. Supplier: Alstom | [29] |
Goupitan - Guangdong | China | China | 3000 | 2016 | Thyr | ??? | |||
Jinsha River II - East China | China | China | 800 | 6400 | 2016 | Thyr | ??? | ||
North-East Agra | India - Agra 27°05′01″N 78°04′22″E | India - Biswanath 26°44′23″N 93°13′09″E | 1728 (0/1728) | 800 | 6000 | 2016 | Thyr | Will supply electricity to serve 90 million people Bipole Ultra high voltage, multiterminal (intermediate converter station at Alipurdauar) Supplier: ABB | [30] |
Inner Mongolia - Linyi | China - Shizhustan 38°46′40″N 106°52′00″E | China - Linyi 35°33′07″N 118°37′07″E | 800 | 6400 | 2017 | Thyr | ??? | ||
Jiuquan- Xiangtan | China - Qiaowan 40°36′03″N 96°43′22″E | China - Xiangtan 27°38′55″N 112°47′25″E | 800 | 6400 | 2017 | Thyr | Supplier:C-EPRI Electric Power Engineering Co.,Ltd
HVDC C&P System Provided by NR Electric |
??? | |
North Shanxi - Nanjing | China - North Shanxi 39°39′35″N 112°27′45″E | China - Nanjing 32°54′47″N 118°35′33″E | 2017 | Thyr | ??? | ||||
Northwest Yunnan - Guangdong | China - Xinsong 26°24′55″N 99°49′12″E | China - Dongfang 22°44′17″N 113°52′07″E | 1953 | 800 | 5000 | 2018 | Thyr | ??? | |
Xilin Hot - Taizhou | China - Xilin Hot 44°14′40″N 116°30′22″E | China - Taizhou 33°07′25″N 119°58′05″E | 800 | 10000 | 2017 | Thyr | ??? | ||
Xinjiang - Anhui | China - Wuicaiwan 44°39′00″N 89°07′25″E | China - Anhui 31°00′20″N 118°34′20″E | 3324 | 1100 | 12000 | 2019 | Thyr | ??? | |
Yinchuan - Zhuji | China - Yinchuan 37°43′45″N 106°32′22″E | China - Zhuji 29°56′25″N 120°13′12″E | 800 | 6400 | 2017 | Thyr | HVDC C&P System Provided by NR Electric | ??? | |
Dianxibei - Guangdong | China-Lijiang | China-Zhengzhen | 1928/0 | 800 | 5000 | 2017 | Thyr | Supplier: C-EPRI Electric Power Engineering Co.,Ltd | ??? |
Jinsha River II - Fujian | China | China | 800 | 6400 | 2018 | Thyr | ??? | ||
Humeng - Liaoning | China | China | 800 | 6400 | 2018 | Thyr | ??? | ||
Rudong Offshore Wind Connector | China - Jiangsu Rudong | China - Jiangsu Rudong Platform | 100 (100/0) | 400 | 1100 | 2022 | IGBT | Suppliers: XJ and RXHK for vavle, ZTT Cable | |
Sheyang Offshore Wind Connector | China - Jiangsu Sheyang | China - Jiangsu Sheyang Platform | 83 (83/0) | 250 | 1100 | 2022 | IGBT | ||
Zhangbei DC Grid Project | China - Beijing | China - Zhangbei China - Fengning China - Kangbao | 495 (0/495) | 500 | 3000/3000/1500/1500 | 2021 | IGBT | Four terminal DC Grid
Suppliers: NR Electric, others |
[31] |
Matiari to Lahore Transmission Line Project | Pakistan - Matiari , Sindh. | Pakistan - Lahore, Punjabe. | 40 | 660 | 4000 | 2021 | IGBT | ±660 KW Bipole HCDC with Converter/ Grounding Electrode Stations | [32] |
Wudongde multi-terminal UHVDC demonstration project | China - Yunnan | China - Guangxi China - Guangdong | 1489 (0/1489) | 800 | 8000/3000/5000 | 2021 | Thyr/IGBT | Three terminal Hybrid DC system, Yunnan (Thyrister), Guangdong and Guangxi (IGBT) | |
Raigarh-Pugalur | India - Raigarh 21°51′21″N 83°21′01″E | India - Pugalur 10°49′33″N 77°32′13″E | 1830 | 800 | 6000 | 2019 | Thyr | Supplier: ABB | [33] |
New HVDC Hokkaido-Honshu | Japan - Imabetsu 41°08′01″N 140°30′46″E | Japan - Hokuto 41°54′57″N 140°35′07″E | 122 (24/98) | 250 | 300 | 2019 | IGBT | suppliers: Toshiba | [34] [35] |
Europe
Name |
Converter station 1 |
Converter station 2 |
Total Length (Cable/Pole) (km) |
Volt (kV) |
Power (MW) |
Year |
Type |
Remarks |
Ref |
---|---|---|---|---|---|---|---|---|---|
Miesbach-Munich Power Transmission | Germany - Miesbach | Germany - Munich | 58 (0/58) | 2 | 0.0025 | 1882 | Single machine | Demonstration facility
Dismantled |
|
Gorzente River - Genoa DC transmission scheme | Italy - Gorzente River | Italy - Genoa | ? | 6 | ? | 1889 | Thury | Upgraded later to a voltage of 14 kV, power of 2.5 MW and a length of 120 km
Dismantled |
|
La Chaux-de-Fonds DC transmission scheme | Switzerland - ? | Switzerland - ? | ? | 14 | ? | 1897 | Thury | Dismantled | |
St. Maurice - Lausanne DC transmission scheme | Switzerland - St. Maurice | Switzerland - Lausanne | ? | 22 | 3.7 | 1899 | Thury | Dismantled | |
Lyon-Moutiers DC transmission scheme | France - Lyon | France - Moutiers | 200 (10/190) | 75 | 30 | 1906 | Thury | Dismantled in 1936 | |
Wilesden-Ironbridge DC transmission scheme | UK - Wilesden | UK - Ironbridge | ? | 100 | ? | 1910 | Thury | Dismantled | |
Chambéry DC transmission scheme | France - ? | France - ? | ? | 150 | ? | 1925 | Thury | Dismantled in 1937 | |
HVDC Zurich-Wettingen | Switzerland - Wettingen 47°27′25″N 8°19′15″E | Switzerland - Zurich | 20 (0/20) | 50 | 0.5 | 1939 | Merc | Experimental facility built by BBC
Dismantled |
|
HVDC Charlottenburg-Moabit | Germany - Berlin-Moabit | Germany - Berlin-Charlottenburg | 4.6 (0/4.6) | 100 | 14 | 1942 | Merc | Experimental facility built by Siemens
Dismantled in 1945 |
|
Lehrte-Misburg HVDC | Germany - Lehrte 52°22′54″N 9°55′03″E | Germany - Hannover/Misburg | ? | 80 | 16 | 1944 | Merc | Experimental facility
Dismantled |
|
Elbe-Project | Germany - Vockerode 51°50′40″N 12°21′50″E | Germany - Berlin, Marienfelde 52°25′49″N 13°22′42″E | 115 (115/0) | 200 | 60 | 1945 | Merc | Never placed in service
Dismantled |
|
HVDC Trollhättan-Mellerud | Sweden - Trollhättan | Sweden - Mellerud | 50 (0/50) | 45 | 6.5 | 1946 | Merc | Experimental facility built by ASEA
Dismantled |
|
Moscow–Kashira | Russia - Moscow 55°39′32″N 37°38′16″E | Russia - Kashira | 100 (100/0) | 200 | 30 | 1951 | Merc | Built of parts of HVDC Elbe-Project
Shut down |
[1] |
Gotland 1 | Sweden - Västervik 57°43′41″N 16°38′51″E | Sweden - Yigne 57°35′13″N 18°11′44″E | 98 (98/0) | 200 | 20 | 1954 | Merc | World's first commercial HVDC link. Expanded by ABB in 1970, decommissioned in 1986 | [1][36] |
Cross-Channel | France - Echingen 50°41′48″N 1°38′21″E | UK - Lydd 50°54′54″N 0°56′50″E | 64 (64/0) | 100 | 160 | 1961 | Merc | Shut down in 1984 | [1] |
Volgograd-Donbass | Russia - Volzhskaya 48°49′34″N 44°40′20″E | Ukraine - Mikhailovskaya 48°39′13″N 38°33′56″E | 475 (0/475) | 400 | 750 | 1965 | Merc/Thyr | Shut down in 2014 | [1] |
Konti-Skan 1 | Denmark - Vester Hassing 57°3′46″N 10°5′24″E | Sweden - Stenkullen 57°48′15″N 12°19′13″E | 176 (87/89) | 250 | 250 | 1965 | Merc | Replaced in August 2006 by modern converters using thyristors | [1] |
SACOI 1 | Italy - Suvereto 43°3′10″N 10°41′42″E ( before 1992: Italy - San Dalmazio 43°15′43″N 10°55′05″E) | France- Lucciana 42°31′40″N 9°26′59″E ; Codrongianos, Italy 40°39′7″N 8°42′48″E | 483 (365/118) | 200 | 200 | 1965 | Merc | Replaced in 1986 by Thyr, multiterminal scheme | [1] |
Kingsnorth | UK - Kingsnorth 51°25′11″N 0°35′46″E | UK - London-Beddington 51°22′23″N 0°7′38″W | 85 (85/0) | 266 | 320 | 1975 | Merc | Bipolar scheme
Supplier: English Electric Shut down in 1987 |
[37] |
Kingsnorth | UK - Kingsnorth | UK - London-Willesden 51°32′03″N 0°15′29″W | 111 (111/0) | 266 | 320 | 1975 | Merc | Opposite pole of Kingsnorth - Beddington. Cable wholly underground except for Thames crossing - crossed on upstream side of Putney District line railway bridge | |
Skagerrak 1 + 2 | Denmark - Tjele 56°28′44″N 9°34′1″E | Norway - Kristiansand 58°15′36″N 7°53′55″E | 230 (130/100) | 250 | 500 | 1977 | Thyr | Supplier: STK(Nexans) Control system upgrade by ABB in 2007 | [38][39][40] |
Gotland 2 | Sweden - Västervik 57°43′41″N 16°38′51″E | Sweden - Yigne 57°35′13″N 18°11′44″E | 99.5 (92.9/6.6) | 150 | 130 | 1983 | Thyr | Supplier: ABB | |
Interconnexion France Angleterre (new) | France - Les Mandarins 50°54′11″N 1°47′5″E | UK - Sellindge 51°6′21″N 0°58′32″E | 72 (72/0) | 270 | 2000 | 1986 | Thyr | 2 bipolar systems
Supplier: Alstom |
[1][41] |
Gotland 3 | Sweden - Västervik 57°43′41″N 16°38′51″E | Sweden - Yigne 57°35′13″N 18°11′44″E | 98 (98/0) | 150 | 130 | 1987 | Thyr | Supplier: ABB | |
Konti-Skan 2 | Denmark - Vester, Hassing 57°3′46″N 10°5′24″E | Sweden - Lindome 57°36′24″N 12°6′40″E | 147 (87/60) | 285 | 300 | 1988 | Thyr | Supplier: ABB | |
Fenno-Skan | Finland - Rauma 61°09′07″N 21°37′32″E | Sweden - Dannebo 60°24′14″N 18°08′10″E | 233 (200/33) | 400 | 500 | 1989 | Thyr | Supplier: ABB | |
SACOI 2 | Italy - Suvereto 43°3′10″N 10°41′42″E ( before 1992: Italy - San Dalmazio 43°15′43″N 10°55′05″E) | France- Lucciana 42°31′40″N 9°26′59″E ; Codrongianos, Italy 40°39′7″N 8°42′48″E | 422 (118/304) | 200 | 300 | 1992 | Thyr | Multiterminal scheme
Supplier: Alstom |
|
Skagerrak 3 | Denmark - Tjele 56°28′44″N 9°34′1″E | Norway - Kristiansand 58°15′36″N 7°53′55″E | 230 (130/100) | 350 | 440 | 1993 | Thyr | Supplier: Nexans ABB | [38] |
Baltic Cable | Germany - Lübeck- Herrenwyk 53°53′46″N 10°48′9″E | Sweden - Kruseberg 55°30′1″N 13°8′45″E | 262 (250/12) | 450 | 600 | 1994 | Thyr | Supplier: ABB | |
Kontek | Denmark - Bjæverskov 55°27′1″N 12°0′27″E | Germany - Bentwisch 54°6′3″N 12°13′1″E | 170 (170/0) | 400 | 600 | 1996 | Thyr | Supplier: ABB | |
Hellsjön-Grängesberg | Sweden - Hellsjön 60°02′50″N 15°08′52″E | Sweden - Grängesberg 60°03′53″N 14°59′39″E | 10 (0/10) | 180 | 3 | 1997 | IGBT | Experimental HVDC
Supplier: ABB |
|
Visby-Nas | Sweden - Nas 57°05′58″N 18°14′27″E | Sweden - Visby 57°37′29″N 18°21′18″E | 70 (70/0) | 80 | 50 | 1999 | Thyr | ||
SwePol | Poland - Wierzbięcin 54°30′8″N 16°53′28″E | Sweden - Stärnö 56°9′11″N 14°50′29″E | 245 (245/0) | 450 | 600 | 2000 | Thyr | Supplier: ABB | [42] |
Tjæreborg | Denmark - Tjæreborg/Enge 55°26′52″N 8°35′34″E | Denmark - Tjæreborg/Substation 55°28′07″N 8°33′36″E | 4.3 (4.3/0) | 9 | 7 | 2000 | IGBT | Interconnection to wind power generating stations | |
Italy-Greece | Greece - Arachthos 39°11′00″N 20°57′48″E | Italy - Galatina 40°9′53″N 18°7′49″E | 310 (200/110) | 400 | 500 | 2001 | Thyr | ||
Moyle | UK - Auchencrosh 55°04′10″N 4°58′50″W | UK - N. Ireland- Ballycronan More 54°50′34″N 5°46′11″W | 63.5 (63.5/0) | 250 | 500 | 2001 | Thyr | Supplier: Siemens, Nexans | [43] |
HVDC Troll | Norway - Kollsnes 60°33′01″N 4°50′26″E | Norway - Offshore platform Troll A 60°40′00″N 3°40′00″E | 70 (70/0) | 60 | 80 | 2004 | IGBT | Power supply for offshore gas compressor
Supplier: ABB |
[44] |
Estlink | Finland - Espoo 60°12′14″N 24°33′06″E | Estonia - Harku 59°23′5″N 24°33′37″E | 105 (105/0) | 150 | 350 | 2006 | IGBT | Supplier: ABB | [44] |
NorNed | Netherlands - Eemshaven 53°26′4″N 6°51′57″E | Norway - Feda 58°16′58″N 6°51′55″E | 580 (580/0) | 450 | 700 | 2008 | Thyr | Supplier: ABB, Nexans | [44] |
BritNed | UK - Grain 51°26′24″N 0°43′0″E | Netherlands - Maasvlakte 51°57′27″N 4°01′17″E | 245 (245/0) | 450 | 1000 | 2010 | Thyr | Operational since April 2011. Supplier: Siemens | [44][45] |
StoreBælt | Denmark - Fraugde 55°22′01″N 10°30′25″E | Denmark - Herslev 55°31′53″N 11°19′01″E | 56 (56/0) | 400 | 600 | 2010 | Thyr | Operational since August 2010. Supplier: Siemens | [44] |
Cometa | Spain - Morvedre 39°38′28″N 0°14′7″W | Spain - Santa Ponsa 39°32′2″N 2°30′21″E | 247 (247/0) | 250 | 400 | 2011 | Thyr | Expected completion 2011
Supplier: Siemens (converter stations); Prysmian/Nexans (cables) |
[44] |
Fenno-Skan 2 | Finland - Rauma 61°09′07″N 21°37′32″E | Sweden - Finnbole 60°25′30″N 17°3′42″E | 303 (200/103) | 500 | 800 | 2011 | Thyr | ||
SAPEI | Italy - Latina 41°25′47″N 12°48′25″E | Italy - Fiume Santo 40°50′29″N 8°18′21″E | 435 (435/0) | 500 | 1000 | 2011 | Thyr | The largest HVDC link in the Mediterranean Sea. Supplier: ABB | [44][48][49] |
Valhall HVDC | Norway - Lista 58°04′37″N 6°46′29″E | Norway - Valhall, Offshore platform | 292 (292/0) | 150 | 78 | 2011 | IGBT | Supplier: ABB, Nexans | [50][51] |
BorWin1 | Germany - Diele | Germany - BorWin Alpha platform | 200 (200/0) | ±150 | 400 | 2012 | IGBT | Supplier: ABB | [52][53][54] |
East West Interconnector | Ireland - Woodland 53°28′16″N 6°34′3″W | UK - Shotton, Wales 53°13′38″N 3°4′22″W | 130 (130/0) | ±200 | 500 | 2012 | IGBT | Supplier: ABB | [55] |
Fenno-Skan 1 Upgrade | Finland - Rauma | Sweden - Finnböle | 233 (200/33) | 400 | 500 | 2013 | Thyr | Upgrade
Supplier:ABB |
[56][57][58] |
Estlink 2 | Finland - Anttila 60°22′36″N 25°22′01″E | Estonia - Püssi 59°22′13″N 27°04′05″E | 171 (157/14) | 450 | 650 | 2014 | Thyr | Supplier: Siemens, Nexans | |
ÅL-link | Finland - Naantali (sv:Nådendal) 60°27′49″N 22°03′49″E | Åland - Ytterby | 158 (158/0) | 80 | 100 | 2015 | IGBT | Supplier: ABB | [59][60][61] |
BorWin2 | Germany - Diele 53°7′30″N 7°18′29″E | Germany - BorWin Beta platform 54°21′18″N 6°01′30″E | 200 (200/0) | ±300 | 800 | 2015 | IGBT | Supplier: Siemens | [62] |
DolWin1 | Germany - Heede 52°58′57″N 7°15′26″E | Germany - DolWin Alpha platform 53°59′42″N 6°25′16″E | 165 (165/0) | ±320 | 800 | 2015 | IGBT | Supplier:ABB | [63] |
HelWin1 | Germany - Büttel 53°55′01″N 9°13′55″E | Germany - HelWin Alpha platform 54°27′07″N 7°44′20″E | 130 (130/0) | ±250 | 576 | 2015 | IGBT | Supplier: Siemens | [64] |
HelWin2 | Germany - Büttel 53°55′01″N 9°13′55″E | Germany - HelWin Beta platform 54°27′11″N 7°44′20″E | 130 (130/0) | ±320 | 690 | 2015 | IGBT | Supplier: Siemens | |
INELFE | France - Baixas 42°43′56″N 2°48′14″E | Spain - Santa Llogaia 42°13′59″N 2°56′39″E | 64 (64/0) | ±320 | 2000 | 2015 | IGBT | Supplier: Siemens, Cables: Prysmian. €700m, 8 km tunnel near HSR | [65] |
LitPol Link HVDC is B2B | Lithuania - Alytus | Poland - Elk | 160 (0/160) | 70 | 500 | 20152[69] | Thyr | Supplier: ABB | [70][71][72] |
NordBalt | Sweden - Nybro 56°46′4″N 15°51′15″E | Lithuania - Klaipėda 55°40′54″N 21°15′24″E | 450 (450/0) | 300 | 700 | 2015 | IGBT | Supplier: ABB | [73] |
Skagerrak 4 | Denmark - Tjele 56°28′44″N 9°34′1″E | Norway - Kristiansand 58°15′36″N 7°53′55″E | 244 (244/0) | 500 | 700 | 2015 | IGBT | Suppliers: Nexans, ABB | [74] |
SylWin1 | Germany - Büttel 53°55′01″N 9°13′55″E | Germany - SylWin Alpha platform 55°03′47″N 7°14′28″E | 205 (205/0) | ±320 | 864 | 2015 | IGBT | Supplier: Siemens | [75] |
Troll A 3&4 | Norway - Kollsnes | Norway - Troll A 3&4 platform | 70 (70/0) | 66 | 100 | 2015 | IGBT | Supplier: ABB | [76][77][78][79][80][81] |
DolWin2 | Germany - Heede 52°58′52″N 7°15′26″E | Germany - DolWin Beta platform 53°58′41″N 6°55′23″E | 135 (135/0) | ±320 | 900 | 2016 | IGBT | Supplier: ABB | [82] |
SydVästlänken | Sweden - Barkeryd 57°44′52″N 14°39′19″E | Sweden - Hurva 55°49′59″N 13°36′08″E | 260 (197/63) | ±300 | 2x720 | 2016 | IGBT | Supplier: Alstom | |
DolWin3 | Germany - Heede 52°58′57″N 7°15′26″E | Germany - DolWin Gamma platform 53°59′42″N 6°25′16″E | 160 (160/0) | ±320 | 900 | 2017 | IGBT | Supplier: Alstom | [83] |
HVDC MON.ITA Project | Italy-Cepagatti 42°23′41″N 14°07′30″E | Montenegro - Lastva Grbaljska 42°19′03″N 18°47′41″E | 415 (415/0) | ±500 | 1000 | 2017 | Thyr | Supplier: Toshiba (converter stations); Nexans (cables). | [84][85][86] |
Western HVDC Link | UK - Hunterston 55°43′16″N 4°53′7″W | UK - Flintshire Bridge 53°13′54″N 3°1′58″W | 422 (422/0) | 600 | 2200 | 2017-18 | Thyr | Supplier: Prysmian Group, Siemens First subsea 600kV link | [87][88] |
Caithness - Moray Link3 | UK - Spittal | UK - Blackhillock | 160 | 320 | 1200 | 2018 | IGBT | Supplier: ABB | [89][90] |
BorWin3 | Germany - Diele | Germany - BorWin Gamma platform | 200 (200/0) | ±320 | 900 | 2019 | IGBT | Supplier: Siemens | |
COBRAcable | Denmark - Endrup via Fanø 55°31′49″N 8°42′13″E | Nederlands - Eemshaven 53°26′07″N 6°52′02″E | 325 | ±320 | 700 | 20194 | IGBT | Suppliers: Siemens, Prysmian, Cost € 449m | [91][92][93][94][95] |
ElecLink | France - Les Mandarins | UK - Sellindge | 70 | 320 | 1000 | 2022 | IGBT | In the Channel Tunnel Cost €580m | [96][97] |
Johan Svedrup Phase 1 | Norway - Haugsneset | Norway - Johan Svedrup platform | 200 (200/0) | ±80 | 100 | 2019 | IGBT | Supplier: ABB, NKT | [98] |
DolWin5 | Germany - Emden/Ost | Germany - DolWin Epsilon platform | 130 (130/0) | ±320 | 900 | 2024 | IGBT | Supplier: ABB, Aibel, Prysmian | [99] |
DolWin6 | Germany - Emden/Ost | Germany - DolWin Zetaplatform | 90 (90/0) | ±320 | 900 | 2023 | IGBT | Supplier: Siemens, Prysmian | [100] |
France-Italy via Fréjus Road Tunnel | France, Grand-Île | Italy, Piossasco | 190 | ±320 | 2x600 | 2019 | IGBT | Supplier: Alstom (converter stations); Prysmian (cables). | [101][102][103][104] |
Nemo Link | Belgium - near Bruges | UK - Richborough Energy Park | 140 (140/0) | 400 | 1000 | 2019 | IGBT | Converter stations: Siemens , cables: J-power systems[105] | [106][107] |
ALEGrO | Belgium - Visé | Germany - Aachen | 100 (100/0) | 320 | 1000 | 2019-205 | IGBT | Converter stations: Siemens | [108][109] |
IFA-2 | France - Tourbe, Normandie | UK - Chilling, Hampshire | 204 | 320 | 1000 | 2021 | IGBT | Supplier: ABB | [110][111][112][113] |
NORD.LINK | Norway - Tonstad 58°40′07″N 6°45′16″E | Germany - Wilster 53°55′18″N 9°20′41″E | 623 (570/53) | 525 | 1400 | 2020 | IGBT | Supplier: ABB | [114][115][116] |
NSN Link | Norway - Kvilldal | UK - Blyth | 730 (730/0) | 515 | 1400 | 2021 | IGBT | Supplier: ABB, Prysmian Group, Nexans, MACH 3 Control & Protection | [117][118][119][120] |
Johan Svedrup Phase 2 | Norway - Haugsneset | Norway - Johan Svedrup platform | 200 (200/0) | ±80 | 200 | 2022 | IGBT | Supplier: Siemens, NKT | [121] |
FAB Link | France - Menuel on Cherbourg Peninsula | UK - Exeter via Alderney | 210 (210/0) | 320 | 1400 | 2025 | IGBT | [122][123] | |
Shetland HVDC Connection | UK - Upper Kergord | UK - near Staxigoe[124] | 260 (260/0) | 320 | 600 | 20246 | IGBT | [125][126] | |
Western Isles HVDC | UK - Arnish Point near Stornoway | UK - Beauly | 156 | 320 | 600 | 20217 | [127] | ||
EuroAsia Interconnector | Israel via Cyprus and Crete | Greece - Attica | 1520 | 500 | 2000 | 2022 | [128][129] | ||
NorthConnect | Norway - Simadalen | UK - Peterhead | 650 | 525 | 1400 | 2022 | IGBT | [130][131] | |
Viking Link | Denmark - Revsing | UK - Bicker Fen | 740 | 525 | 1400 | 2023 | IGBT | Suppliers: Siemens, Prysmian and NKT | [132][133] |
EuroAfrica Interconnector | Egypt via Cyprus and Crete | Greece - Attica | 1707 | 500 | 2000 | 2021 | [134][135][136][137] | ||
Eastern HVDC Link | UK - Peterhead | UK - Hawthorn | 305 | 400 | 2000 | 2024 | [138] | ||
Celtic Interconnector | Ireland | France | 575 | 500 | 700 | 2025 | [139] | ||
Icelink | Iceland | UK | 1100 | 1000 | 2030 | [140] | |||
Dogger Bank A Interconnector | UK - Creyke Beck | UK - Dogger Bank A platform | 207 (207/0) | 320 | 1200 | 2024 | IGBT | Suppliers: ABB, Aibel and NKT, 172 km submarine cable and 35 km underground cable | [141][142] |
Dogger Bank B Interconnector | UK - Creyke Beck | UK - Dogger Bank B platform | 207 (207/0) | 320 | 1200 | 2024 | IGBT | Suppliers: ABB, Aibel and NKT, 172 km submarine cable and 35 km underground cable | [143][144] |
SüdOstLink | Germany – Wolmirstedt | Germany – Landshut | 500 | 525 | 2000 | 2025 | [145] | ||
AQUIND Interconnector | France - Barnabos | UK - Lovedean | 242 | 320 | 2000 | 2021 | Submarine Cable | Suppliers: National Grid plc (substation in the UK); Réseau de Transport d'Électricité (RTE) (substation in France) | |
2 As of 9 December 2015, LitPol Link started trial operations.[146]
3 Caithness Moray HVDC serves a number of renewable energy sources in the north of Scotland - see map[127]
4 Contracts due to be placed in 2016.
5 Elia says construction expected to start in late 2017.
6 Date is that quoted to support the Shetland Wind Farm that SSE is a part investor in.[147]
7 Decision on project expected in 2017 following consultation - see SSE PD reference.
North America
Name |
Converter station 1 |
Converter station 2 |
Total Length (Cable/Pole) (km) |
Volt (kV) |
Power (MW) |
Year |
Type |
Remarks |
Ref |
---|---|---|---|---|---|---|---|---|---|
HVDC Mechanicville–Schenectady | USA - Mechanicville,NY 42°54′45″N 73°40′49″W | USA - Schenectady, NY | 37 (0/37) | 12 | 5 | 1932 | Merc | Experimental, frequency conversion 40 to 60 Hz
Dismantled after WW II |
[148] |
Vancouver Island 1 | Canada - Delta, BC 49°5′31″N 123°2′31″W | Canada - North Cowichan, BC 48°49′39″N 123°42′55″W | 75 (42/33) | 260 | 312 | 1968 | Merc | Supplier: ASEA | [1] |
Pacific DC Intertie | USA - Celilo, OR 45°35′39″N 121°6′51″W | USA - Sylmar, CA 34°18′39″N 118°29′21″W, 34°18′42″N 118°28′53″W | 1362 (0/1362) | ±500 | 3100 | 1970 | Thyr | Transmission voltage ±400 kV until 1984 Maximum transmission power 1440 MW until 1982 From 1982 to 1984 1600 MW From 1984 to 1989 2000 MW Merc replaced by Thyr in 2004 Original supplier: ASEA, GE In 1989 upgraded by ABB In 2004 upgraded by ABB and Siemens | [1][149][150] |
Nelson River Bipole 1 | Canada - Gillam, Manitoba 56°21′41″N 94°36′48″W | Canada - Rosser, Manitoba 49°59′39″N 97°25′39″W | 895 (0/895) | 463.5 | 1854 | 1971 | Thyr | Used the largest mercury arc rectifiers ever built Original supplier: English Electric. In 1992/1993, Pole 1 upgraded to Thyr by Alstom. In 2004, Pole 2 upgraded to Thyr by Siemens. | [1][151] |
Vancouver Island 2 | Canada - Delta, BC 49°5′31″N 123°2′31″W | Canada - North Cowichan, BC 48°49′39″N 123°42′55″W | 75 (33/42) | 280 | 370 | 1977 | Thyr | Supplier: GE | [1] |
Square Butte | USA - Center, ND (Young) 47°4′18″N 101°11′45″W | USA - Adolph, MN (Arrowhead) 46°46′25″N 92°17′39″W | 749 (0/749) | 250 | 500 | 1977 | Thyr | Supplier: GE In 2004 Control system upgrade by ABB | [1][152][153] |
Nelson River Bipole 2 | Canada - Sundance, Manitoba 56°30′14″N 94°8′24″W | Canada - Rosser, Manitoba 49°59′39″N 97°25′49″W | 940 (0/940) | 500 | 2000 | 1978-1985 | Thyr | Supplier: Siemens | [1][151] |
CU | USA - Underwood, ND (Coal Creek) 47°22′24″N 101°9′23″W | USA - Rockford, MN (Dickinson) 45°6′40″N 93°48′36″W | 687 (0/687) | 400 | 1000 | 1979 | Thyr | Supplier: ABB In 2004, control system upgrade by ABB | [1][154] |
Path 27 | USA - Intermountain, UT 39°30′2″N 112°34′51″W | USA - Adelanto, CA 34°33′4″N 117°26′14″W | 785 (0/785) | ±500 | 1920 | 1986 | Thyr | ||
Quebec - New England Transmission | Canada - Radisson, QC OpenStreetMap 53°43′33″N 77°44′17″W | Canada - Nicolet, QC 46°04′47″N 72°14′58″W; USA - Ayer, MA 42°34′13″N 71°31′27″W | 1105 (5/1100) | 450 | 2250 | 1991 | Thyr | 3 terminals Converter stations near Windsor, QC and Monroe, NH were decommissioned in 2007. Supplier: ABB |
[1] |
Cross Sound Cable | USA - New Haven, CT 41°17′12″N 72°54′8″W | USA - Shoreham, Long Island, NY 40°57′33″N 72°52′3″W | 40 (40/0) | 150 | 330 | 2002 | IGBT | Buried underwater cable Supplier: ABB |
[155] |
Neptune Cable | USA - Long Island (Hicksville) NY 40°45′38″N 73°33′4″W | USA -Sayreville, NJ 40°28′25.38″N 74°21′11.1″W | 105 (105/0) | 500 | 660 | 2007 | Thyr | Supplier: Siemens | [156] |
Trans Bay Cable | USA - Pittsburg, CA 38°01′51″N 121°53′48″W | USA - San Francisco, CA 37°45′17″N 122°23′09″W | 85 (85/0) | 200 | 400 | 2010 | IGBT | First HVDC system using Modular Multi-Level Converter
Supplier: Siemens, Pirelli |
[157][158][159] |
Eastern Alberta Transmission Line | Canada – Newell, AB 50°30′41″N 112°01′02″W | Canada – Heathfield, AB 53°51′28″N 113°13′52″W | 485 (0/485) | 500 | 1000 | 2015/2016 | Thyr | Supplier: Siemens | [160] |
Western Alberta Transmission Line | Canada – Genesee, AB 53°21′13″N 114°18′33″W | Canada – Langdon, AB 50°57′37″N 113°43′11″W | 350 (0/350) | 500 | 1000 | 2015 | Thyr | Supplier: Siemens | [160][161] |
Nelson River Bipole 3 | Canada - Keewatinohk, Manitoba 56°39′25″N 93°51′14″W | Canada - Riel, Manitoba 49°51′59″N 96°56′24″W | 1324 (0/1324) | 500 | 2000 | 2018 | Thyr | Supplier: Siemens | [1][151] |
Labrador-Island Link | Canada - Muskrat Falls, NL | Canada - Soldiers Pond, NL | 1135 (35/1100) | 350 | 900 | 2017 | Thyr | Drilling for cable landfall began in 2014. Supplier: Alstom Grid | [162][163] |
Maritime Link | Canada - Bottom Brook, NL 48°31′52″N 58°15′39″W | Canada - Woodbine, NS 45°59′30″N 60°16′26″W | 360 (170/190) | 200 | 500 | 2017 | IGBT | Right-of-way clearing began in 2014. Supplier: ABB | [164][165][166][167] |
Plains & Eastern Clean Line | USA - Texas County, OK | USA - Shelby County, TN | 1207 (0/1207) | 600 | 4000 | ~2018 | Thyr | Approved March 2016 | [168][169][170] |
New England Clean Power Line | USA - Alburgh, VT | USA - Ludlow, VT | 248 (248/0) | 320 | 1000 | 2020 | [171][172] | ||
Îles-de-la-Madeleine Cable Connection | Canada - Percé, QC | Canada - Cap-aux-Meules, QC | 225 (225/0) | ? | 80 | 2025 | ? | Buried undersea and underground | [173] |
Juan de Fuca Cable Project | USA - Port Angeles, WA 48°06′10″N 123°25′00″W | Canada - Victoria, BC 48°29′26″N 123°27′30″W | 35 (35/0) | 150 | 550 | ? | IGBT | Buried undersea (30.5 km) and underground (2.5 km at each end) Supplier: ABB | [174][175] |
Rock Island Clean Line | USA - O'Brien County, IA | USA - Grundy County, IL | 805 (0/805) | 600 | 3500 | ? | Thyr | Supplier: Siemens | [176] |
TransWest Express | USA – Sinclair, WY | USA – Boulder City, NV | 1165 (0/1165) | 600 | 3000 | ? | Final EIS expected in April 2015. | [177][178][179] | |
Grain Belt Express | USA - Ford County, KS | USA - Sullivan County, IN | 750
(0/750) |
600 | 3500 | ? |
South America
Name |
Converter station 1 |
Converter station 2 |
Total Length (Cable/Pole) (km) |
Volt (kV) |
Power (MW) |
Year |
Type |
Remarks |
Ref |
---|---|---|---|---|---|---|---|---|---|
Itaipu 1 | Brazil - Foz do Iguaçu, Paraná 25°27′58″S 54°32′33″W | Brazil - São Roque, São Paulo 23°40′2″S 47°6′19″W | 785 (0/785) | 600 | 3150 | 1984 | Thyr | Supplier: ABB | [1] |
Itaipu 2 | Brazil - Foz do Iguaçu, Paraná 25°27′58″S 54°32′33″W | Brazil - São Roque, São Paulo 23°40′2″S 47°6′19″W | 805 (0/805) | 600 | 3150 | 1987 | Thyr | Supplier: ABB | [1] |
Rio Madeira | Brazil, Porto Velho 08°54′53″S 63°57′27″W | Brazil, Araraquara 21°49′59″S 48°20′52″W | 2375 (0/2375) | 600 | 7100 | 2013 | Thyr | The longest transmission link in the world Suppliers: ABB, Alstom |
[180] |
Xingu-Estreito | Brazil - Anapu, Pará | Brazil - Ibiraci, Minas Gerais | 2077 (0/2077) | 800 | 4000 | 2017 | Thyr |
Back to back
Name |
Location |
Volt (kV) |
Power (MW) |
Year |
Type |
Remarks |
Ref |
---|---|---|---|---|---|---|---|
Carnegie Steel Company B2B | USA - Pittsburgh, Pennsylvania | ? | ? | ? | Merc | built for an interconnection between 60 Hz-utility system and a 25 Hz System, dismantled | [181] |
Sakuma B2B | Japan - Sakuma 35°04′57″N 137°47′56″E | 125 | 300 | 1965 | Merc | replaced in 1993 by new converter using light-triggered thyristors | |
Eel River B2B | Canada - Eel River, NB 48°01′05″N 66°26′39″W | 80 | 320 | 1972 | Thyr | life extension project 2014 | [182][183] |
David A. Hamil B2B | USA - Stegall, Nebraska 41°49′15″N 103°56′32″W | ±50 | 100 | 1977 | Thyr | Supplier: GE | |
Shin Shinano B2B | Japan - Shin Shinano 36°08′14″N 137°52′58″E | 125 | 600 | 1977 | Thyr | Supplier: Toshiba, Hitachi | |
Acaray B2B | Paraguay - Ciudad de Este 25°27′26″S 54°37′26″W | 25.6 | 50 | 1981 | Thyr | ||
Vyborg B2B | Russia - Vyborg 60°40′49″N 28°55′7″E | ±85 | 1065 | 1982 | Thyr | extended up to 1420 MW in 2001 | |
Dürnrohr B2B | Austria - Dürnrohr 48°19′46″N 15°52′48″E | 145 | 550 | 1983 | Thyr | shut down in October 1996, dismantled in 2007 | |
Artesia, New Mexico (Eddy County HVDC B2B) B2B | USA - Artesia, NM 32°48′51.7″N 104°14′29.6″W | 82 | 200 | 1983 | Thyr | ||
Chateauguay B2B | Canada – Châteauguay, QC 45°15′11″N 73°52′11″W | 140 | 1000 | 1984 | Thyr | Control system upgrade by ABB in 2009 | [184][185] |
Oklaunion B2B | USA - Oklaunion, TX 34°5′6″N 99°11′1″W | 82 | 200 | 1984 | Thyr | ABB replacement in 2014 | [186][187]
|
Blackwater, New Mexico B2B | USA - Blackwater, NM 34°18′3″N 103°10′27″W | 57 | 200 | 1984 | Thyr | Valve cooling and control systems upgrade by ABB in 2009 | [188][189] |
Madawaska, Quebec B2B | Canada - Dégelis, QC 47°30′31″N 68°31′25″W | 140 | 350 | 1985 | Thyr | ||
Miles City, Montana B2B | USA - Miles City, MT 46°24′31″N 105°47′36″W | 82 | 200 | 1985 | Thyr | ||
Highgate, VT B2B | USA - Highgate, VT 44°56′17″N 73°3′15″W | 56 | 200 | 1985 | Thyr | Refurbishment by ABB in 2012, | [190] |
Uruguaiana B2B | Brazil - Uruguaiana 29°48′22″S 57°0′17″W | 17.9 | 53.9 | 1986 | Thyr | ||
Broken Hill B2B | Australia - Broken Hill 31°59′10″S 141°25′9″E | 8.33 | 40 | 1986 | Thyr | ||
Virginia Smith B2B | USA - Sidney, NE 41°9′51″N 102°59′15″W | 50 | 200 | 1988 | Thyr | [191] | |
Vindhyachal B2B | India - Vindhyachal 24°05′38″N 82°40′44″E | 176 | 500 | 1989 | Thyr | ||
McNeill B2B | Canada - Mc Neill, AB 50°35′56″N 110°01′25″W | 42 | 150 | 1989 | Thyr | Supplier: Alstom | |
Wolmirstedt B2B | Germany - Wolmirstedt 52°16′21″N 11°38′10″E | 160 | 600 | (1992) | Thyr | construction work was stopped after reunification, static inverter hall is today part of a recycling yard | |
Etzenricht B2B | Germany - Etzenricht 49°37′52″N 12°6′56″E | 160 | 600 | 1993 | Thyr | shut down in October 1995, dismantled in 2009 | |
Vienna-Southeast B2B | Austria - Vienna 48°7′22″N 16°25′6″E | 142 | 600 | 1993 | Thyr | shut down in October 1996, dismantled in 2007 | |
Chandrapur B2B | India - Chandrapur 20°5′21″N 79°8′36″E | 205 | 2x500 | 1998 | Thyr | Supplier: Alstom | |
Welsh HVDC Converter Station B2B | USA - Titus County, TX 33°03′30.3″N 94°50′36.54″W | 162 | 600 | 1998 | Thyr | ||
Garabi HVDC | Brazil - Garabi 28°15′19″S 55°40′18″W | ±70 | 2200 | 1999 | Thyr | Brazil-Argentina Interconnection. Supplier: ABB In 2002, the second phase 'Garabi 2' was supplied by ABB . | [192] |
Vizag 1 | India - Visakhapatnam Gazuwaka 17°38′33″N 83°7′57″E | 205 | 500 | 1999 | Thyr | Supplier: Alstom | |
Minami-Fukumitsu B2B | Japan - Minami - Fukumitsu 36°29′46″N 136°54′57″E | 125 | 300 | 1999 | Thyr | ||
Rivera B2B | Uruguay - Rivera 30°56′29″S 55°33′34″W | 22 | 70 | 2000 | Thyr | Supplier: Alstom | |
Eagle Pass, Texas B2B | USA - Eagle Pass, TX 28°42′58.8″N 100°29′26.88″W | 15.9 | 36 | 2000 | IGBT | ||
Sasaram B2B | India - Sasaram 25°07′42″N 83°42′29″E | 205 | 500 | 2003 | Thyr | Supplier: Alstom | |
Rapid City DC Tie B2B | USA - Rapid City, SD 44°00′37″N 103°9′54″W | 13 | 200 | 2003 | Thyr | [193][194] | |
Vizag 2 | India - Visakhapatnam 17°38′26″N 83°8′10″E | 176 | 500 | 2005 | Thyr | Installed at Gazuwaka. Supplier:ABB. This is similar in specs to Vizag I and connects the Eastern and Southern grids. | [195] |
Lingbao B2B | China - Lingbao 34°32′56″N 110°50′49″E | 168 | 360 | 2005 | Thyr | Supplier: NR(Protection&Control), Extension project 2010: Supplier: ABB;C-EPRI Electric Power Engineering Co.,Ltd | [196][197] |
Lamar Co., Colorado B2B | USA - Lamar, CO 38°12′25.08″N 102°31′43.92″W | 63.6 | 210 | 2005 | Thyr | Supplier: Siemens; Combination of B2B HVDC & Grid Power Flow Controller (GPFC) | [198] |
Higashi-Shimuzu B2B | Japan - Shimuzu 35°03′24″N 138°29′58″E | 125 | 300 | 2006 | Thyr | ||
Sharyland B2B | USA - Mission, TX 26°10′01″N 98°19′25″W | 21 | 150 | 2007 | Thyr | ||
Al Fadhili B2B | Saudi Arabia - Al Fadhili 26°53′52″N 49°20′47″E | 222 | 3x600 | 2008 | Thyr | Used mainly for Dynamic Reserve Power Sharing rather than economic energy transfer. Supplier: Alstom | [199] |
Outaouais B2B | Canada - Buckingham, QC 45°36′01″N 75°26′47″W | 315 | 2x625 | 2009 | Thyr | Expected completion 2009. Supplier:ABB | [44] |
Heihe B2B | China - Heihe 50°15′19″N 127°25′37″E | ±125 | 750 | 2011 | Thyr | Supplier: NR(Protection&Control)[200] | |
Gaoling B2B | China - Gaoling 40°10′49″N 120°00′22″E | ±500 | 1500 | 2008 | Thyr | ||
Shandong - East B2B | China | 1200 | 2011 | Thyr | |||
Melo B2B | Uruguay - Melo 32°25′02″S 54°05′34″W | ±79 | 500 | 2011 | Thyr | Supplier:Alstom | |
North - Central B2B | China | 1000 | 2012 | Thyr | |||
Rio Madeira B2B | Brazil – Porto Velho 8°54′46″S 63°57′27″W | 100 | 600 | 2013 | Thyr | Supplier: ABB[201] | [202][203][204][205] |
Ridgefield B2B ( Hudson Project) | USA - Ridgefield, NJ 40°49′56″N 74°00′44″W | 185 | 660 | 2013 | Thyr | Supplier: Siemens[206] | |
Bheramara B2B | Bangladesh – Bheramara 24°04′03″N 89°0′04″E | 158 | 500 | 2013 | Thyr | ||
Akhaltsikhe B2B | Georgia - Akhaltsikhe 41°42′26″N 43°06′35″E | 96 | 700 | 2013 | Thyr | Supplier: Siemens | [207] |
Mackinac B2B | USA - Saint Ignace, MI 45°51′31″N 84°44′18″W | 70 | 200 | 2014 | IGBT | Supplier: ABB | [208] |
Railroad DC Tie | USA - Mission, TX 26°10′01″N 98°19′25″W | 21 | 150 | 2014 | Thyr | ||
Alytus B2B | Lithuania - Alytus 54°26′19″N 23°58′02″E | ±70 | 500 | 2015 | Thyr | [209] | |
Mogocha B2B | Russia - Mogocha 53°43′30″N 119°47′22″E | ±32 | 2x100 | 2017 | IGBT | [210] | |
Yu - E B2B | China-ChongQing, China-Hubei | ±420 | 4x1250 | 2017 | VSC-HVDC | Supplier: XJ Group Corporation(2x1250MW), C-EPRI Electric Power Engineering Co.,Ltd(1x1250MW), Rongxin Power Electronic Co.,Ltd. (1x1250MW) | |
Khani B2B | Russia - Khani 56°55′09″N 119°59′24″E | ±32 | 2x100 | 2019 | IGBT | [210] | |
Bentwisch B2B | Germany - Bentwisch 54°06′04″N 12°12′56″E | ±140 | 410 | 2019 | IGBT | ||
Tres Amigas SuperStation | USA - Clovis, NM | ? | 5000 | ? | IGBT |
Maps
Europe
- Shetland HVDC Connection
- Caithness Moray HVDC
- Western Isles HVDC
- NorthConnect
- NSN Norway Kvilldal – UK Blyth, 1.4 GW under construction
- Eastern HVDC Link
- Moyle: Auchencrosh, UK – Ballycronan More, Northern Ireland, UK
- Western HVDC Link
- East–West Interconnector: Leinster, Ireland – Shotton, Wales, UK
- Celtic Interconnector
- FAB Link
- IFA-2
- HVDC Cross-Channel: Les Mandarins, France – Sellindge, UK
- Nemo Link
- BritNed: UK – Netherlands
- ALEGrO
- Viking Link
- HVDC DolWin1, HVDC DolWin2, HVDC DolWin3
- HVDC SylWin1
- HVDC HelWin1, HVDC HelWin2
- HVDC BorWin1, HVDC BorWin2, HVDC BorWin3
- NorNed: Feda, Norway – Eemshaven, Netherlands
- NORD.LINK: Germany – Norway
- Skagerrak 1, 2, 3, and 4: Tjele, Denmark – Kristiansand, Norway
- Konti-Skan 1 and 2: VesterHassing, Denmark – Stenkullen, Sweden
- StoreBælt: Fyn, Denmark – Zealand, Denmark
- Baltic Cable: Lübeck- Herrenwyk, Germany – Kruseberg, Sweden
- Kontek: Bjæverskov, Denmark – Bentwisch, Germany
- SydVästlänken
- SwePol: Stärnö, Sweden – Wierzbięcin (Słupsk), Poland
- LitPol Link
- NordBalt
- HVDC Visby–Näs
- Gotland: Västervik, Sweden – Ygne, Sweden
- Fenno-Skan: Rauma, Finland – Dannebo, Sweden, Fenno-Skan 2
- ÅL-link
- Estlink: Harku, Estonia – Espoo, Finland
- Estlink 2
- Cometa: Valencia, Spain – Mallorca, Spain
- INELFE
- HVDC Italy–Corsica–Sardinia: "SACOI" – Codrongianos, Sardinia, Italy – Lucciana, Corsica, France – Suvereto, Italy (mainland)
- SAPEI, Sardinia – Italian mainland
- HVDC MON.ITA Project
- HVDC Italy-Greece: Arachthos, Greece – Galatina, Italy
- EuroAsia Interconnector
- EuroAfrica Interconnector
See also
- Asian Super Grid
- Desertec
- Electrode line
- European super grid
- High-voltage direct current
- List of high voltage underground and submarine cables
- Lyon-Moutiers DC transmission scheme
- Scotland-Norway interconnector
- HVDC converter station
- Super grid
- Submarine power cable
- Transmission tower
- Uno Lamm
- Valve hall
References
- HVDC Projects List, March 2012 - Existing or Under Construction (PDF), Ece.uidaho.edu, accessed in February 2014
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- "ABB wins $50 million HVDC order in Mozambique". Abb.com. Retrieved 16 January 2018.
- "References - ABB". Abb.com. Retrieved 16 January 2018.
- "ABB wins $107 million power order in Africa". Abb.com. Retrieved 16 January 2018.
- "Winne.com - Report on Congo DRC, Paving the reconstruction". Winne.com. Retrieved 16 January 2018.
- "ABB commissions Caprivi link". 1 January 2011. Retrieved 15 February 2014.
- "Basslink". Basslink.com.au. Retrieved 16 January 2018.
- Joerg Dorn; Dietmar Retzmann; Cristen Schimpf; Dag Soerangr (2007-11-06). "HVDC Solutions for System Interconnection and Advanced Grid Access" (PDF). EPRI HVDC conference 2007-09-13 to 14. Siemens: 44. Retrieved 15 February 2014.
- "HVDC Inter-Island Link Project - Transpower". Transpower New Zealand. Archived from the original on February 10, 2013. Retrieved 15 February 2014.
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- "HVDC in China" (PDF). Dsius.com. Retrieved 16 January 2018.
- "ROLE OF THREE GORGES - CHANGZHOU HVDC IN INTERCONNECTING CENTRAL AND EAST CHINA" (PDF). ABB Asea Brown Boveri. Archived from the original (PDF) on February 16, 2012. Retrieved 2014-02-10.
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- "China-EPRI Electric Power Engineering Co., Ltd". 2 July 2013. Archived from the original on 2 July 2013. Retrieved 16 January 2018.
- "China-EPRI Electric Power Engineering Co., Ltd". 2 July 2013. Archived from the original on 2 July 2013. Retrieved 16 January 2018.
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- world's first multi-terminal VSC HVDC transmission project Archived 2014-03-01 at the Wayback Machine, accessed in February 2014
- world's first multi-terminal VSC HVDC transmission project , accessed in February 2014 Archived February 8, 2014, at the Wayback Machine
- , Alstom Press Release, 7 July 2014.
- "Error - LS Cable". m.lscns.com. Archived from the original on 19 November 2015. Retrieved 16 January 2018.
- Zhoushan Multi-terminal DC Interconnection, accessed in February 2014 Archived April 14, 2014, at the Wayback Machine
- "Champa ±800 kV UHVDC" (PDF). Alstom.com. Archived from the original (PDF) on 27 January 2015. Retrieved 16 January 2018.
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- "Case Study Zhangbei DC Grid" (PDF).
- {{cite web|url= http://cpec.gov.pk/project-details/17 |title= Matiari To Lahore ±660kV HVDC Transmission Line Project}
- "India to Build Longest 800kV UHVDC Transmission Line". 11 January 2017. Retrieved 20 January 2017.
- "The New Hokkaido-Honshu HVDC Link" (PDF).
- "New Hokkaido-Honshu VSC HVDC Commissioned, Interconnecting Hokkaido and the Main Island of Honshu". 28 March 2019. Retrieved 7 January 2021.
- "The Gotland HVDC link". abb.com.
- Kingsnorth Power Station brochure on the DC system (Kingsnorth to London HVDC power reinforcement scheme - dated 1975)
- "Skagerrak". abb.com.
- "New lease on life for northern European power link". abb.com.
- "ABB wins $180 million order for Norway-Denmark power transmission link". abb.com.
- "National Grid info on IFA". Interconnections - France. National Grid plc. Archived from the original on 20 August 2016. Retrieved 31 December 2015.
- "SwePol Link". abb.com.
- "Mutual Energy". Mutual Energy. Mutual Energy. Retrieved 31 December 2015.
- Working Group on HVDC and FACTS Bibliography and Records (2008-07-07). "HVDC PROJECTS LISTING" (PDF). IEEE Transmission and Distribution Committee. Retrieved 2008-12-19.
- "BritNed cable live today" (Press release). BritNed. 2011-04-01. Retrieved 2011-04-01.
- "BritNed organisation". BritNed. BritNed. Retrieved 5 January 2016.
- "National Grid on BritNed". Interconnectors - Netherlands. National Grid plc. Archived from the original on 20 January 2016. Retrieved 5 January 2016.
- "SAPEI". abb.com.
- "ABB wins $180 million order for undersea power link in Italy". abb.com.
- "ABB press release". ABB power link to Valhall. ABB. Retrieved 5 January 2016.
- "Valhall HVDC by ABB". ABB refs Valhall. ABB. Retrieved 5 January 2016.
- "BorWin1". abb.com.
- "ABB wins power order worth more than $400 million for world's largest offshore wind farm". abb.com.
- BorWin1 - Transmission project. YouTube. 7 July 2010.
- "Overview of EirGrid Connection" (PDF). Paper presented at UPEC 2013. ABB. Retrieved 31 December 2015.
- "ABB Fenno-Skan - ABB HVDC Reference Projects in Europe (HVDC References)". abb.com. Archived from the original on 2015-04-20.
- "ABB to upgrade transmission control for Scandinavian power interconnector". abb.com.
- "New Fenno-Skan 2 HVDC pole with an upgrade of the existing Fenno-Skan 1 pole". Search-ext.abb.com. Retrieved 25 September 2017.
- "Åland". abb.com.
- "ABB wins $130-million HVDC order for subsea power transmission link in Finland". abb.com.
- "Åland Link project management" (PDF). pöyry case summary. Pöyry SwedPower AB. Retrieved 8 January 2016.
- "Wir bringen die Windenergie vom Meer an Land - TenneT TSO GmbH". tennettso.de.
- "DolWin1". abb.com.
- "Wir bringen die Windenergie vom Meer an Land - TenneT TSO GmbH". Tennettso.de. Retrieved 25 September 2017.
- "2014 INELFE, France-Spain" (PDF) (Press release). Siemens. 2011-01-12. Retrieved 2012-05-13.
- "REE on INELFE". Spain-France underground interconnection. Red Eléctrica da España. Retrieved 5 January 2016.
- "INEFE ready for testing". HVDC link between France and Spain. Siemens. Retrieved 5 January 2016.
- "Crossing Mountains to Connect Two Countries". TD world. 8 June 2017. Archived from the original on 21 June 2017. Retrieved 21 June 2017.
- "Russia's Power Grip Over Baltics Ending With Billion-Euro Cables". Bloomberg. Retrieved 11 August 2016.
- "LITPOL Link". litpol-link.com. Archived from the original on 2013-12-30. Retrieved 2013-12-06.
- "ABB wins $110 million power order to interconnect Lithuania and Poland". abb.com.
- "LitPol Link". Abb.com.
- "NordBalt". Retrieved 12 January 2015.
- "ABB press release". ABB sets world record. ABB. Retrieved 5 January 2016.
- "Wir bringen die Windenergie vom Meer an Land - TenneT TSO GmbH". tennettso.de.
- "ABB wins $270 million order from Statoil for world's largest offshore gas platform". abb.com.
- "Inauguration event of ABB technologies at the Troll A platform in Norway". abb.com.
- "The Troll area". statoil.com. Archived from the original on 2014-09-25. Retrieved 2013-12-06.
- "ABB signs US$ 230 million in contracts with Statoil". abb.com.
- "ABB HVDC Light - Electrical/Integrated Project Solutions (Offshore Production)". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- "Very high voltage synchronous motors". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- "DolWin2". Retrieved 12 January 2015.
- "Offshore wind energy: TenneT awards "DolWin3"project to Alstom, marking next step in Germany's energy turnaround". alstom.com.
- "Nexans wins major subsea cable contract for Terna's new HVDC power interconnection between Italy and Montenegro". 30 October 2012. Retrieved 6 November 2015.
- "Toshiba wins EPC Contract for HVDC power conversion system". Toshiba Press Release. 7 December 2012. Retrieved 6 November 2015.
- "HVDC MON.ITA Project" (PDF). Terna Crna Gora. 27 January 2014. Retrieved 6 November 2015.
- "Q&A". Western HVDC. Retrieved 28 March 2015.
- "NG ETYS 2015". Electricity 10 year statement. National Grid plc. Retrieved 31 December 2015.
- "Caithness Moray HVDC". Caithness Moray. SSE Power Distribution. Retrieved 3 January 2016.
- "ABB information". Caithness Moray HVDC Link. ABB. Retrieved 3 January 2016.
- "Energienet in English". Cable to NL - COBRACable. Energienet.DK. Archived from the original on 20 January 2016. Retrieved 4 January 2016.
- "COBRAcable". TenneT. Retrieved 26 February 2017.
- "Works starts in Eemshaven on COBRAcable – a 'green' subsea electricity highway between the Netherlands and Denmark". TenneT. 3 January 2017. Retrieved 26 February 2017.
- "Offshore wind : Cobra cable" (PDF). Alstom.com. Retrieved 16 January 2018.
- "ElecLink". Eleclink. ElecLink. Retrieved 3 January 2016.
- "Foundation laid for UK-France link". reNEWS - Renewable Energy News. 23 February 2017. Retrieved 26 February 2017.
- https://www.equinor.com/en/news/2018-10-09-johan-sverdrup-powered-shore.html
- https://www.tennet.eu/our-grid/offshore-projects-germany/dolwin5/
- https://www.tennet.eu/our-grid/offshore-projects-germany/dolwin6/
- "Alstom will supply converter stations to Italy-France interconnector - Enerdata". Enerdata.net. Retrieved 16 January 2018.
- New strategic interconnection Italy-France for Terna R. I. and RTE, Prysmian Press Release, 26 March 2015.
- "RTE on France Italy link". Savoie-Piémont: 190 km. RTE France. Retrieved 7 January 2016.
- "Terna on Italy France link". Italy - France, the invisible line. Terna. Retrieved 7 January 2016.
- "Nemo Link news June '15". Nemo Link news June '15. Nemo Link. Retrieved 31 December 2015.
- "Nemo Link". Nemo Link. Nemo Link. Retrieved 31 December 2015.
- "Siemens re Nemo Link". Siemens wins major HVDC order to connect British and Belgian power grid. Siemens. Retrieved 13 January 2016.
- "ALEGrO Project". ALEGrO Project. Elia. Retrieved 24 January 2016.
- "Siemens Energy supplies HVDC technology for electricity link between Germany and Belgium". www.windtech-international.com. 10 November 2020. Archived from the original on 10 November 2020. Retrieved 10 November 2020.
- "IFA2 - National Grid". France - National Grid. National Grid plc. Archived from the original on 20 August 2016. Retrieved 3 January 2016.
- "IFA2 - RTE info". Interconnection France Angleterre (in French). RTE. Retrieved 3 January 2016.
- "IFA2 Brochure" (PDF). IFA2 brochure d'information. RTE. Retrieved 4 January 2016.
- "IFA2: low-carbon electricity now flowing through second UK-France interconnector". National Grid. National Grid. Retrieved 27 January 2021.
- "NORDLINK - Statnett". NORDLINK - Projects -Statnett. Statnett. Retrieved 4 January 2016.
- "NORDLINK - TenneT". NordLink. TenneT. Archived from the original on 20 January 2016. Retrieved 4 January 2016.
- "NORDLINK ABB". ABB Press Release re order. ABB. Retrieved 4 January 2016.
- "Heading for British clarification of interconnector framework conditions". Archived from the original on 29 November 2014. Retrieved 12 January 2015.
- "Cable to the UK". Statnett. 2014. Archived from the original on 2014-10-30. Retrieved 2014-11-20.
- "€1.5 billion contracts awarded to build the world's longest interconnector". statnett. Archived from the original on 2015-08-17. Retrieved 2015-09-03.
- "What is NSN Link? | NSN Link". nsninterconnector.com. Archived from the original on 2015-08-01. Retrieved 2015-09-03.
- https://www.equinor.com/en/news/2018-10-09-johan-sverdrup-powered-shore.html
- "FAB Link". Fab Link. FAB Link. Retrieved 3 January 2016.
- "Alderney Renewable Energy". FAB - Alderney Renewable Energy. ARE. Retrieved 3 January 2016.
- "Caithness". Caithness HVDC. SSE PD. Retrieved 1 January 2016.
- "Shetland HVDC Link". Shetland. SSE Power Distribution. Retrieved 31 December 2015.
- "Shetland HVDC -4C". Shetland HVDC Interconnector. 4Coffshore. Retrieved 31 December 2015.
- "SSE PD in Scotland". Western Isles. SSE Power Distribution. Retrieved 3 January 2016.
- "EuroAsia Interconnector Project". EuroAsia Interconnector. EuroAsia Interconnector. Retrieved 24 January 2016.
- "EU PCI 2013 - see Cyprus" (PDF). EU Projects of Common Interest. European Commission. Retrieved 24 January 2016.
- "NorthConnect Project". NorthConnect. NorthConnect, Norway. Retrieved 5 January 2016.
- "Ofgem clears Scotland-Norway power cable". Bbc.com. 22 June 2016. Retrieved 25 September 2017.
- "Viking Link". Viking Link. Viking Link. Retrieved 31 December 2015.
- The EuroAfrica Interconnector
- Electricity Cable Aims to Link Cyprus, Egypt, Greece, Bloomberg, February 8, 2017
- EuroAfrica 2,000MW cable boosts Egypt-Cyprus ties, Financial Mirror February 8, 2017
- EEHC, Euro Africa Company sign MoU to conduct a feasibility study to link Egypt, Cyprus, Greece, Daily News Egypt,February 6, 2017
- "Eastern HVDC Link Interconnector". 4coffshore.com. Retrieved 12 April 2016.
- "The Project". www.eirgridgroup.com. Retrieved 2019-05-14.
- https://www.4coffshore.com/windfarms/interconnector-icelink-icid48.html
- https://www.4coffshore.com/news/abb-and-aibel-net-dogger-bank-bounty-nid14371.html
- https://www.nkt.com/news-press-releases/nkt-confirms-order-for-dogger-bank-offshore-wind-farms-creyke-beck-a-b
- https://www.4coffshore.com/news/abb-and-aibel-net-dogger-bank-bounty-nid14371.html
- https://www.nkt.com/news-press-releases/nkt-confirms-order-for-dogger-bank-offshore-wind-farms-creyke-beck-a-b
- "SuedOstLink: First award of contract for plastic-insulated underground cable for 525 kilovolts". www.50hertz.com. Retrieved 2020-05-08.
- "News on trial operations of LitPol Link". LitPol Link News. LitPol-link.com. Archived from the original on 11 January 2016. Retrieved 8 January 2016.
- "Shetland Windfarm". Viking Energy - Timeline. Viking Energy. Retrieved 31 December 2015.
- James A. Besha, The historic Mechanicville Hydroelectric Station part 2, IEEE INDUSTRY APPLICATIONS MAGAZINE Mar/Apr 2007, page 8
- "ABB Rededicates Sylmar Converter Station". Abb.com. Retrieved 16 January 2018.
- "Pacific Intertie". Abb.com.
- Siemens HVDC Reference List, Energy.siemens.com, accessed in February 2014.
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- "Square Butte annual report 2004" (PDF). Web.archive.org. Archived from the original (PDF) on 20 January 2016. Retrieved 25 September 2017.
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- Fairley, Peter (April 2005). "TransÉnergie: Playing Two Power Games". MIT Technology Review. Retrieved 2014-08-05.
- "What is Neptune RTS?". Archived from the original on May 26, 2008. Retrieved 2008-12-19.
- Westerweller T., Friedrich, K., Armonies, U., Orini, A., Parquet, D., Wehn, S., Trans Bay cable – world's first HVDC system using multilevel voltage-sourced converter, CIGRÉ session, Paris, 2010, paper reference B4-101
- "IEEE PES; HVDC Systems and Trans-Bay Cable" (PDF). 16 March 2005. Retrieved 16 September 2009.
- "HDVC Plus Technology provided by Siemens". 2012. Retrieved 10 September 2012.
- "AESO 2013 Long-term Transmission Plan" (PDF). Alberta Electric System Operator. January 2014. pp. 77–78. Archived from the original (PDF) on 2014-04-02.
- Bachusky, Johnnie (2015-01-27). "Billion dollar transmission line is complete". Mountain View Gazette. Olds, AB. Archived from the original on 2015-02-02. Retrieved 2015-02-02.
- Roberts, Stephen (July 7, 2014). "Muskrat Falls work well underway in Forteau". Northern Pen. St. Anthony: Transcontinental Media G.P. Archived from the original on July 17, 2014. Retrieved 2014-07-14.
- "Awarded Contracts: Muskrat Falls Generation and Labrador-Island Link". Nalcor Energy. Retrieved 2014-07-26.
CD0501 Supply and Install Converter Stations and Transition Compounds 19-Jun-2014
- "ABB awarded $400 million order for Maritime Link power project in Canada" (Press release). Zurich, Switzerland: ABB. July 9, 2014. Retrieved 2014-07-14.
- "Maritime Link Infrastructure". Emera Newfoundland and Labrador. 2014. Retrieved 2014-07-14.
- "4.1.3". Maritime Link Environmental Assessment Report (PDF) (Report). Emera Newfoundland and Labrador. January 10, 2013. Retrieved 2014-07-25.
- "Maritime Link construction underway in western Newfoundland". CBC News. 2014-11-27. Retrieved 2014-11-27.
- "Plains & Eastern Clean Line". Plainsandeasterncleanline.com. 23 March 2011. Retrieved 16 January 2018.
- Cardwell, Diane (25 March 2016). "Wind Power Transmission Project in Plains Earns U.S. Approval". Nytimes.com. Retrieved 25 September 2017.
- "TDI New England Files State Permit Application for the New England Clean Power Link". Transmission & Distribution World. New York, NY: Penton. 2014-12-20. Retrieved 2014-12-30.
- "NECPL Submarine Cable Installation" (PDF). New England Clean Power Link: Project Development Portal. TDI New England. 2014-10-09. Retrieved 2014-12-30.
- "Cable connection to the main Hydro-Québec grid through Gaspésie". hydroquebec.com. Retrieved 11 February 2020.
- Presidential Permit: Sea Breeze Pacific Regional Transmission System, Inc. (PDF), United States Department of Energy Office of Electricity Delivery and Energy Reliability, June 11, 2008, PP-299
- HVDC Light technical background (PDF), Sea Breeze Olympic Converter LP, archived from the original (PDF) on 2013-03-06, retrieved 2015-08-17 – via Bonneville Power Administration
- "Rock Island Clean Line". Rockislandcleanline.com. 23 March 2011. Archived from the original on 17 January 2018. Retrieved 16 January 2018.
- "BLM/Western publish fifth EIS update newsletter" (Press release). Transwest Express LLC. 2014-11-26. Retrieved 2014-12-30.
- "Delivering Wyoming wind energy to the West". TransWest Express Transmission Project. TransWest Express LLC. 2014. Retrieved 2014-08-05.
- "Global Transmission Report : TransWest Express Project, US". 6 January 2017. Retrieved 22 January 2017.
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- Archived May 24, 2011, at the Wayback Machine
- "Eel River". abb.com.
- "News" (PDF). Nbpower.com. Retrieved 25 September 2017.
- "Châteauguay". abb.com.
- "ABB to upgrade transmission control for vital North American power interconnector". abb.com.
- "ABB Oklaunion - ABB HVDC Reference Projects in North America (HVDC References)". abb.com. Archived from the original on 2016-01-20. Retrieved 2015-04-20.
- "ABB awarded $60 million HVDC order to support grid reliability in Texas". abb.com.
- "Blackwater". abb.com.
- "ABB to upgrade control and valve cooling system for HVDC station in New Mexico". abb.com.
- "Highgate". abb.com.
- "HVDC Transformers- details". Siemens. Archived from the original on August 9, 2011. Retrieved 2008-12-19.
- "Brazil-Argentina HVDC Interconnection". abb.com.
- Archived November 21, 2008, at the Wayback Machine
- "Archived copy". Archived from the original on 27 June 2009. Retrieved 2009-06-27.CS1 maint: archived copy as title (link) CS1 maint: bot: original URL status unknown (link)
- "THE SECOND 1 x 500 MW HVDC BACK-TO-BACK INTERCONNECTION AT VIZAG" (PDF). 2005-09-29. Archived from the original (PDF) on February 21, 2007. Retrieved 2008-12-20.
- "Lingbao II". abb.com.
- "ABB wins orders worth $8-million to upgrade HVDC station in China". abb.com.
- "APPLICATION OF THE GRID POWER FLOW CONTROLLER (GPFC) IN A BACK TO BACK PROJECT- details" (PDF). Siemens. Retrieved 2009-09-29.
- "Archived copy" (PDF). Archived from the original (PDF) on 2011-05-31. Retrieved 2009-03-24.CS1 maint: archived copy as title (link)
- "Rio Madeira". abb.com.
- "ABB wins $540-million order in Brazil for world's longest power transmission link". abb.com.
- "Designing Madeira Transmission System - Transmission content from TDWorld". tdworld.com.
- A remarkable journey - Transportation of the world's largest HVDC transformers. YouTube. 20 June 2012.
- "The Rio Madeira HVDC System – Design aspects of Bipole 1 and the connector to Acre-Rondônia". Search-ext.abb.com. Retrieved 25 September 2017.
- Kohnstam, Peter (April 22, 2013). "High Voltage Direct Current Transmission" (PDF). Energy.gov.
- "Siemens HVDC technology to transmit eco-friendly electric power from Georgia to Turkey : Press release" (PDF). Alstom.com. Retrieved 16 January 2018.
- "Mackinac". abb.com.
- "References - ABB". New.abb.com. Retrieved 16 January 2018.
- "HVDC Advances in the Russia - Substations content from TDWorld". Tdworld.com.
Sources
- Vijay K. Sood. HVDC and FACTS Controllers: Applications Of Static Converters In Power Systems. Springer-Verlag. p. 2. ISBN 978-1-4020-7890-3.