List of major power stations in Guizhou
This page lists the major power stations located in Guizhou province.
Non-renewable
Coal-based
Station | Name in Chinese | Coordinates | Capacity (MW) | Operational Units | Under Construction Units | Reference |
---|---|---|---|---|---|---|
Pannan Power Station | 盘南电厂 | 25°28′08″N 104°35′30″E | 2,400 | 4*600MW | ||
Faer Power Station | 发耳电厂 | 26°19′31″N 104°46′11″E | 2,400 | 4*600MW | ||
Qianxi Power Station | 黔西电厂 | 27°03′07″N 106°07′28″E | 1,860 | 4*300MW, 1*660MW | ||
Yuanhao Power Station | 元豪电厂 | 25°11′55″N 105°01′55″E | 1,400 | 4*350MW | ||
Fuquan Power Station | 福泉电厂 | 26°37′49″N 107°32′35″E | 1,320 | 2*660MW | ||
Zhijin Power Station | 织金电厂 | 26°49′57″N 105°49′10″E | 1,320 | 2*660MW | ||
Erlang Power Station | 二郎电厂 | 28°09′48″N 106°21′07″E | 1,320 | 2*660MW | [1] | |
Liuzhi Power Station | 六枝电厂 | 26°23′06″N 105°23′38″E | 1,320 | 2*660MW | [2] | |
Puan Power Station | 普安电厂 | 25°31′28″N 104°58′30″E | 1,320 | 2*660MW | [3] | |
Qianbei Chayuan Power Station | 黔北茶园电厂 | 27°29′34″N 106°26′59″E | 1,320 | 2*660MW | [4] | |
Weihe Power Station | 威赫电厂 | 1,320 | 2*660MW | [5] | ||
Panjiang Xinguang Power Station | 盘江新光电厂 | 1,320 | 2*660MW | [6] | ||
Yaxi Power Station | 鸭溪电厂 | 27°34′44″N 106°39′16″E | 1,200 | 4*300MW | [7] | |
Qianbei Power Station | 黔北电厂 | 27°28′30″N 106°15′20″E | 1,200 | 4*300MW | ||
Nayong First Power Station | 纳雍第一电厂 | 26°39′10″N 105°10′58″E | 1,200 | 4*300MW | ||
Nayong Second Power Station | 纳雍第二电厂 | 26°35′53″N 105°12′09″E | 1,200 | 4*300MW | ||
Anshun Power Station | 安顺电厂 | 26°13′12″N 105°41′12″E | 1,200 | 4*300MW | ||
Dafang Power Station | 大方电厂 | 27°05′50″N 105°33′42″E | 1,200 | 4*300MW | ||
Tangzhai Power Station | 塘寨电厂 | 26°49′46″N 106°15′57″E | 1,200 | 2*600MW | ||
Xingyi Power Station | 兴义电厂 | 25°16′51″N 104°52′03″E | 1,200 | 2*600MW | [8] | |
Tongzi Power Station | 桐梓电厂 | 28°07′48″N 108°50′48″E | 1,200 | 2*600MW | [9] | |
Zhenfeng Power Station | 贞丰县煤电冶一体化工业园热电联产 | 25°22′51″N 105°46′46″E | 700 | 2*350MW | [10] | |
Shuicheng Power Station | 水城电厂 | 26°40′46″N 104°48′19″E | 600 | 3*200MW | ||
Dalong Power Station | 大龙电厂 | 27°17′43″N 109°00′50″E | 600 | 2*300MW |
Renewable
Conventional
References
- "国家电投二郎电厂1号2号机组顺利通过集团公司达标投产考核 - 中国电力网-". www.chinapower.com.cn. Retrieved 2017-11-22.
- "华润电力六枝电厂2号机组顺利通过168小时试运行". www.cr-power.com. Retrieved 2017-11-22.
- "总投资49.96亿元 中电普安电厂一期2×660MW超临界燃煤发电工程完成投资33亿元 - 北极星电力新闻网". news.bjx.com.cn. Retrieved 2017-11-22.
- "金元集团茶园电厂两台660兆瓦新建机组并网发电 - 北极星电力新闻网". news.bjx.com.cn. Retrieved 2017-11-22.
- "威赫电厂正式开工建设-中国新闻网—贵州新闻". www.gz.chinanews.com. Retrieved 2020-11-08.
- "贵州盘江新光2×660MW超超临界火电项目动工 - 北极星火力发电网". news.bjx.com.cn. Retrieved 2020-12-19.
- "贵州鸭溪发电厂新建机组全部投产-国务院国有资产监督管理委员会". wap.sasac.gov.cn. Retrieved 2017-11-22.
- "Archived copy". Archived from the original on 2013-04-05. Retrieved 2012-10-18.CS1 maint: archived copy as title (link)
- "华电集团桐梓公司第二台60万千瓦火电机组投产发电-新闻-能源资讯-中国能源网". www.china5e.com. Retrieved 2017-11-22.
- "贵州贞丰县热电联产2号机组实现168小时试运行".
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.