Parli Thermal Power Station

Parali Thermal Power Plant is located at Parali Vaijnath in Beed district of Maharashtra. The power plant is one of the coal based power plants of Maharashtra State Power Generation Company (Mahagenco).[1]

Parali Thermal Power Station
CountryIndia
LocationParali, Beed, Maharashtra
Coordinates18.868768°N 76.526127°E / 18.868768; 76.526127
StatusOperational
Commission date1971
Operator(s)Maharashtra State Power Generation Company (Mahagenco)
Thermal power station
Primary fuelCoal
Power generation
Units operational6
Nameplate capacity1380.00 MW
External links
Websitemahagenco.in

Installed Capacity

StageUnit NumberInstalled Capacity (MW)Date of CommissioningStatus
Stage I1301970 AugustAbandoned
Stage I2301971 MarchAbandoned.
Stage II32101979 AprilAbandoned.
Stage II42101980 JulyRunning.
Stage II52101981 JanuaryRunning.
Stage III62502007Running.
Stage III72502010Running.
Stage III82502016Running.[2]

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.