Rhymney railway station
Rhymney railway station serves the town of Rhymney in Wales. Situated on the Valley Lines network 23 miles (37 km) north of Cardiff Central, it is the terminus of the Rhymney Line. The station has sidings to the west of its single platform which are used for the overnight stabling of the diesel multiple unit trains – from classes 142, 143, and 150 – which are used on the line.
Rhymney Station in December 2018 | |
Location | Rhymney, Caerphilly Wales |
Coordinates | 51°45′32″N 3°17′23″W |
Grid reference | SO110074 |
Managed by | Transport for Wales |
Platforms | 1 |
Other information | |
Station code | RHY |
Classification | DfT category F1 |
History | |
Opened | 31 March 1858 |
Passengers | |
2015/16 | 0.189 million |
2016/17 | 0.191 million |
2017/18 | 0.181 million |
2018/19 | 0.182 million |
2019/20 | 0.162 million |
Notes | |
Passenger statistics from the Office of Rail and Road |
History
The railway south from here was opened by the Rhymney Railway in 1858 as far as Hengoed and Walnut Tree Junction (giving access to Cardiff Central via the Taff Vale Railway by 1864), with a link northwards to Rhymney Bridge (on the Merthyr to Abergavenny 'Heads of the Valley' line) following in 1871. This was operated jointly with the London and North Western Railway. In the same year the current route through Caerphilly was opened by the Rhymney company, removing the need for its trains to use TVR metals to reach Cardiff. Services to the north ended in 1953 with the closure of the joint line to Rhymney Bridge to passenger traffic (with complete closure following in November 1954). The section down to Bargoed was also subsequently singled and the station reduced in size, with the decommissioning of the old island platform. This remained intact but disused for many years, but was demolished in 2007 when the stabling sidings were relaid and re-aligned.
Services
On Mondays to Saturdays there is an hourly service from Rhymney to Penarth at xx29 every hour calling at Pontlottyn, Tir-Phil, Brithdir, Bargoed, Pengam, Hengoed, Ystrad Mynach, Llanbradach, Energlyn & Churchill Park, Aber, Caerphilly, Lisvane and Thornhill, Llanishen, Heath High Level, Cardiff Queen Street, Cardiff Central, Grangetown, Dingle Road and Penarth. Journeys to Cardiff take (on average) 55–60 minutes and 75 minutes to Penarth.
From December 2013 the train service frequency was due to be upgraded to every 30 minutes off-peak each weekday due to the construction & commissioning of a loop at Tir-Phil, the extra service being a continuation of one of the 3 trains per hour that currently terminate at Bargoed. However a lack of rolling stock has prevented this taking placed as originally planned and the frequency will remain hourly (with additional weekday peak departures) for the immediate future.[1]
On Sundays, services run to Barry Island on a two-hourly frequency.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Terminus | Transport for Wales Rhymney Line |
Pontlottyn | ||
Disused railways | ||||
Rhymney Bridge Line and station closed |
London and North Western Railway and Rhymney Railway Nantybwch and Rhymney Joint Line |
Pontlottyn Line and station open |
Notes
- GB Rail Timetable December 2015 Edition, Table 130 (Network Rail)
External links
Wikimedia Commons has media related to Rhymney railway station. |
- Train times and station information for Rhymney railway station from National Rail
- RAILSCOT - Photographs of Rhymney